Emerald Resources Nl · ASX:EMR

Emerald Resources Nl — Investor Presentation (August 2018)

16 slides from Emerald Resources Nl's investor presentation, Aug 7, 2018

  1. Slide 1: Okvau Gold Project, Cambodia

    Okvau Gold Project, Cambodia ASX:EMR Emerald to Become +100,000ozpa Gold Producer Investor Presentation | August 2018

  2. Slide 2: Presentation Disclaimer

    Presentation Disclaimer Forward Looking Statement This announcement contains certain forward-looking statements. These forward-looking statements are not historical facts but rather are based on the Company’s current expectations, estimates and projections about the industry in which Emerald Resourc

  3. Slide 3: Emerald a Short History

    Emerald a Short History  20th August 2014 o Current board appointed to Emerald Oil and Gas o Change of business and Change of name to Emerald Resources  14th November 2016 o Completed Merger with Renaissance Minerals  1st May 2017 o Okvau Definitive Feasibility announced and; o Maiden Ore Reserve

  4. Slide 4: Capital Structure

    Capital Structure ASX Code EMR Board & Management Simon Lee AO, Non-Executive Chairman Share Price 3.6 cents1  Previously Chairman: Equigold NL, Samantha Gold NL, and Great Victoria Gold NL Shares on Issue 2,111M  Previously Board Member of the Australian Trade Commission and Patron of the Western

  5. Slide 5: Cambodia Overview & Project Location

    Cambodia Overview & Project Location First mover advantage in frontier terrain Attractive fiscal regime: o 100% ownership o No Government equity participation o 30% corporate tax rate for mining o 3.0% Government Gold royalty (net) o Import duty exemptions ~1,400 km of underexplored terrain 2 pros

  6. Slide 6: Project Summary | Robust and Compelling Economics

    Okvau Project Summary | Robust and Compelling Economics Economically robust project  JORC Ore Reserve of 14.3Mt @ 2.0g/t Au for 907,000oz Project DFS Economics (100% Ownership) Development Capital Costs1 US$91M  2.0Mtpa plant to produce 106,000oz pa Mining Contractor Capital & Pre-Production Minin

  7. Slide 7: Low All-in Sustaining Costs | High Margin

    Low All-in Sustaining Costs | High Margin Operating Cost Summary Life of Mine On-Site Mining US$333/oz On-Site Processing US$265/oz On-Site G&A US$48/oz Transport and Refining US$5/oz C1 costs US$650/oz Royalties1 US$50/oz Sustaining Capital & Closure Costs US$31/oz AISC US$731/oz 1 Includes Governm

  8. Slide 8: Metallurgy & Processing

    Metallurgy & Processing Extensive test work completed Conventional Flotation & Leaching Coarse primary grind (>106µm) and sulphide flotation Low mass pull (8%), high grade concentrate Fine regrind of concentrate only (no oxidation) Leaching (flotation tails and concentrate) & Elution Gold recoveries

  9. Slide 9: Okvau JORC Reserve 2.0g/t Au for 907,000 ounces gold

    Okvau JORC Reserve 2.0g/t Au for 907,000 ounces gold April 2017 JORC Resource (0.7g/t gold cut-off) 1 Tonnage Grade Au Gold Resource Classification (Mt) (g/t) (Koz)  650 metres of strike by 600 metres width of the Indicated 15.11 2.08 1,008 mineralised vein system Inferred 2.57 1.61 133  Drill spa

  10. Slide 10: Okvau Cross Section

    Okvau Cross Section  Stacked, sheeted sulphidic shear zones dipping to the south-east  Possible grade and volume upside along diorite/sediment contacts  Contact intercepts include: 19m @ 9.13g/t gold and 22m @ 3.56g/t gold Intercepts and interpretation allow for 2m of external dilution in additio

  11. Slide 11: Okvau Grade Control Simulation

    Okvau Grade Control Simulation  Infill Grade Control simulation (drilling) confirms continuity, grade and tonnage estimate of resource model  Holes drilled (infill to resource drilling) on a 10m x10m infill pattern to an average vertical depth of 25m  152 holes completed to date with best results

  12. Slide 12: Okvau Resource Growth

    Okvau Resource Growth Depth extensions  Some of the highest grade intersections sit beneath open pit floor including: o 17m @ 4.5g/t from 320m (DD11OKV091) o 10m @ 9.6g/t from 411m (DD12OKV108) o 11m @ 8.4g/t from 399m (DD11OKV091) o 6m @ 9.7g/t from 520m (DD16OKV373) Refer to the Company’s ASX rel

  13. Slide 13: Regional Potential | New Joint Ventures

    Regional Potential | New Joint Ventures  Dominant land position of ~1,400km2 covering a north-west trending zone of granitoid intrusions  Multiple Gold occurrences with direct associations with intrusions with pathfinder multi-elements (bismuth, arsenic, tellurium)  Small percentage of total lice

  14. Slide 14: Angkor JV Koan Nheak Project

    Angkor JV Koan Nheak Project • Two gold in soil anomalies discoveries Peacock North • Northern anomaly 0.7km x 0.3km (at >10ppb Au) • Southern anomaly 1.4km x 0.4km (at >10ppb Au) • Peak value Auger sampling 806 ppb Au • Peak value EMR rock chip 9.94 g/t Au • Geological setting similar to Okvau on P

  15. Slide 15: Mekong Minerals Snoul Project

    Mekong Minerals Snoul Project Drillhole From Interval Au g/t SNRC002 4 4 11.94 SNRC006 12 4 1.25 • EMR Auger soil results redefines existing SNRC009 4 16 2.93 MM shallow soil results SNRC010 12 12 1.01 DD09ANC011 49 1 9.09 • 3km, x 1.5km gold in soil anomaly (at DD09ANC013 66 1 11.36 >10ppb Au) DD10

  16. Slide 16: Summary

    Summary 1. Experienced, well credentialed Board and senior management, well equipped to develop Okvau and other gold projects 2. Emerald developing a single pit, 2.0g/t, 907,000 ounce gold reserve at US$731/ounce (AISC) 3. Resource open with strong potential to expand and convert additional reserves

Emerald Resources NL — Investor Presentation (August 2018) on 6ix