Sembcorp Industries Ltd. · SGX:U96

Sembcorp Industries — Sembcorp Marine — FY2019 Earnings Presentation

55 slides from Sembcorp Industries's earnings presentation, 2020

  1. Slide 1: Corporate Presentation 4Q / FY 2019 Results

    Slide 1: Corporate Presentation 4Q / FY 2019 Results

    CORPORATE PRESENTATION 4Q / FY 2019 Results Aerial view of Tuas Boulevard Yard Phase I and II 1 Aerial view of Phase I of Sembcorp Marine Tuas Boulevard Yard

  2. Slide 2: Scope of briefing

    Slide 2: Scope of briefing

    Scope of briefing CEO ADDRESS CFO FINANCIAL OVERVIEW 2

  3. Slide 3: CEO Address

    Slide 3: CEO Address

    CEO ADDRESS CEO ADDRESS  Introduction & Overview  Financial Performance  Operational Review  Market Outlook (Please refer to CEO speech text for more details) 3

  4. Slide 4: Overview

    Slide 4: Overview

    Overview  The Group has had a challenging year operating in an environment impacted by oil demand and supply uncertainties, rising geopolitical tensions, the US-China trade war, and intense market competition. New orders secured ($ million)  Despite this, we persisted in our transformation strateg

  5. Slide 5: Financial Performance

    Slide 5: Financial Performance

    Financial Performance Financial Performance - Revenue ($m) 6,000  For the financial year 2019, the Group 4,888 5,000 generated revenue of $2.88 billion, compared 4,000 with $4.89 billion for FY 2018. However, 2,882 3,000 excluding the delivery of 7 jack-ups and sale 2,000 of a semi-submersible rig

  6. Slide 6: Operational Review – New projects

    Slide 6: Operational Review – New projects

    Operational Review – New projects  Sembcorp Marine’s new orders in 2019 included:  Project with first-time customer Jan De Nul to fabricate jacket foundations for Formosa 2, the biggest offshore wind farm in Taiwan.  Design-and-build project with Mitsui O.S.K. Lines (MOL) for a 12,000-cubic-metre

  7. Slide 7: Operational Review

    Slide 7: Operational Review

    Operational Review  As at end 2019, the Group’s net order book stands at $2.44 billion, excluding the Sete Brasil drill ships contracts.  To strengthen our orders visibility, during 2019, we also made further progress to better position ourselves to compete for major complex offshore projects, wit

  8. Slide 8: Sete Brasil Drillship Contracts

    Slide 8: Sete Brasil Drillship Contracts

    Sete Brasil Drillship Contracts  In October 2019, we announced that we had reached a full and final settlement with the Sete Brasil Group on the claims under all seven drill ship contracts signed with them in 2012.  Under the settlement agreement, we retain the titles to five of the seven drill sh

  9. Slide 9: Repairs & Upgrades

    Slide 9: Repairs & Upgrades

    Repairs & Upgrades  Sembcorp Marine’s Repairs & Upgrades business did well in 2019, having serviced 280 vessels with an average per-vessel revenue of $2.16 million, compared to $1.61 million in 2018.  In the FSU/FSRU segment, we won five conversion and upgrading contracts, valued at $71 million in

  10. Slide 10: Projects in Progress & Deliveries

    Slide 10: Projects in Progress & Deliveries

    Projects in Progress & Deliveries  Projects in progress include: the Johan Castberg and Karish newbuild FPSOs; Shell Vito and Whale FPUs; Transocean drill ships; Ørsted Hornsea 2 offshore wind farm substations; Norled battery- powered roll-on/roll-off passenger (ROPAX) ferries; and the MOL LNG bunk

  11. Slide 11: New Orders Secured in FY 2019

    Slide 11: New Orders Secured in FY 2019

    New Orders Secured in FY 2019 Formosa 2 Offshore Wind Farm Project – Jan De Nul Fabrication of 15 Jacket Foundations • Project: To fabricate 15 jacket foundations for the Formosa Phase 2 Offshore Wind Farm for customer Jan De Nul n.v. • Delivery planned for December 2020. • The Formosa 2 offshore wi

  12. Slide 12: New Orders Secured in FY 2019

    Slide 12: New Orders Secured in FY 2019

    New Orders Secured in FY 2019 FPSO Conversion of VLCC Ariake FPSO conversion project with Shapoorji Pallonji and Bumi Armada • Project: To convert the VLCC Ariake into an FPSO for deployment on the East Coast of India. • Customer: Joint venture of Shapoorji Pallonji Oil and Gas Pte Ltd and Bumi Arma

  13. Slide 13: New Orders Secured in FY 2019

    Slide 13: New Orders Secured in FY 2019

    New Orders Secured in FY 2019 Shell Whale Floating Production Unit (FPU) Construction and Integration of FPU Topside and Hull • Project: Sembcorp Marine Rigs & Floaters Pte. Ltd. has won a contract from Shell Offshore Inc. to build and integrate the topside and hull of a Floating Production Unit (FP

  14. Slide 14: New Orders Secured in FY 2019

    Slide 14: New Orders Secured in FY 2019

    New Orders Secured in FY 2019 14 Two contracts for offshore platforms and bridges worth S$550 million • On December 26, 2019 Sembcorp Marine Offshore Platforms (SMOP) announced it had secured 2 contracts worth S$550 million. • Project One: A contract to fabricate two well-head platforms for National

  15. Slide 15: New Orders Secured in FY 2019

    Slide 15: New Orders Secured in FY 2019

    New Orders Secured in FY 2019 Tyra offshore platforms and bridges contract for Total E&P Danmark AS • Project Two: On 26 December 2019, SMOP also announced a contract to fabricate platforms and bridges for Total E&P Danmark A/S in the Tyra redevelopment project. • To be completed in 1Q 2021, the pla

  16. Slide 16: New Orders Development

    Slide 16: New Orders Development

    New Orders Development Siccar Point FEED Contract Front-End Engineering and Design (FEED) of Circular Hull FPSO Solution • Project: Exclusive Front-End Engineering and Design (FEED) contract to deliver a floating production, storage and offloading (FPSO) design solution based on Sembcorp Marine’s pr

  17. Slide 17: Rigs & Floaters – Key Deliveries

    Slide 17: Rigs & Floaters – Key Deliveries

    Rigs & Floaters – Key Deliveries Sleipnir – World’s Largest, Strongest and Most Sustainable SSCV Heerema Semi-submersible Crane Vessel Newbuild Project: Engineering and construction of a newbuild semi-submersible crane vessel Customer: Heerema Marine Contractors Delivery: July 2019 • Biggest offshor

  18. Slide 18: Recent Project Deliveries

    Slide 18: Recent Project Deliveries

    Recent Project Deliveries Helix Q7000 Newbuild Semi-submersible Well Intervention Vessel Project: Construction of second newbuild semi-submersible well intervention vessel based on a design jointly developed by Sembcorp Marine and Helix Customer: Helix Energy Solutions Delivery: Early November 2019

  19. Slide 19: Recent Project Deliveries

    Slide 19: Recent Project Deliveries

    Recent Project Deliveries Petrobras P-68 FPSO Hull carry-over works and topside modules fabrication and integration • Significant operational milestone for wholly-owned and operated Brazil subsidiary Estaleiro Jurong Aracruz (EJA) – Completion of first floating production, storage and offloading (FP

  20. Slide 20: Recent Project Deliveries

    Slide 20: Recent Project Deliveries

    Recent Project Deliveries Transocean Norge (ex-West Rigel) Newbuild Harsh-Environment Semi-submersible Drilling Rig Project: Newbuild Moss Maritime CS60 design harsh environment semi-submersible drilling rig bought by Transocean and partners Customer: Transocean and partners Delivery: Feb 2019, secu

  21. Slide 21: Ongoing Projects – Johan Castberg FPSO

    Slide 21: Ongoing Projects – Johan Castberg FPSO

    Ongoing Projects – Johan Castberg FPSO Johan Castberg Project for Equinor Turnkey Engineering, Procurement and Construction of Newbuild FPSO Hull and Living Quarters Project: Turnkey engineering, procurement and construction of newbuild FPSO hull and living quarters Customer: Equinor (formerly Stato

  22. Slide 22: Ongoing Projects – Karish FPSO

    Slide 22: Ongoing Projects – Karish FPSO

    Ongoing Projects – Karish FPSO TechnipFMC Karish FPSO EPC construction & integration of FPSO hull, living quarters & topside modules Project: EPC construction and integration of a newbuild FPSO hull, living quarters and topside modules, including owner-furnished equipment Customer: TechnipFMC Operat

  23. Slide 23: Ongoing Projects – Shell Vito Project

    Slide 23: Ongoing Projects – Shell Vito Project

    Ongoing Projects – Shell Vito Project Construction and Integration of FPU Hull, Topsides and Living Quarters Project: Construction and integration of hull, topsides and living quarters for Shell’s Vito semi-submersible Floating Production Unit (FPU), including installation of owner-furnished equipme

  24. Slide 24: Ongoing Projects – Shell Whale Project

    Slide 24: Ongoing Projects – Shell Whale Project

    Ongoing Projects – Shell Whale Project Shell Whale FPU Construction and Integration of FPU Topside and Hull – Strike Steel Project: Building and integration of topside and hull for Shell’s semi-submersible FPU Customer: Shell Offshore Inc. Operation: Whale Field, US Gulf of Mexico 24

  25. Slide 25: Rigs & Floaters – Ongoing Projects

    Slide 25: Rigs & Floaters – Ongoing Projects

    Rigs & Floaters – Ongoing Projects Transocean Drill Ships Construction of Two Proprietary Design High-Specification Drill Ships Project: Construction of two high-specification ultra-deepwater drill ships for Transocean based on Sembcorp Marine’s proprietary Jurong Espadon III drillship design. Custo

  26. Slide 26: Ongoing Projects – Hornsea Project

    Slide 26: Ongoing Projects – Hornsea Project

    Ongoing Projects – Hornsea 2 Project Hornsea 2 Offshore Wind Farm Topsides Engineering, Procurement, Construction, Hook-up and Commissioning of Two Offshore Wind Farm Topsides Project: Engineering, procurement, construction, hook-up and commissioning works for two topsides for Hornsea 2 Offshore Win

  27. Slide 27: Ongoing Projects – Ropax Ferries

    Slide 27: Ongoing Projects – Ropax Ferries

    Ongoing Projects – Ropax Ferries Norled Ropax Ferries Project Design and Construction of 3 Battery-powered Proprietary-designed Roll-on Roll-off Passenger (Ropax) Ferries Project: Design and construction of three battery-powered ropax ferries based on a proprietary design by Sembcorp Marine’s wholly

  28. Slide 28: Ongoing Projects – LNG Bunker

    Slide 28: Ongoing Projects – LNG Bunker

    Ongoing Projects – LNG Bunker LNG Bunker Vessel Newbuild Design and Construction of 12,000 cbm LNG bunker vessel • Project: Design and construction of 12,000 cbm dual-fuel LNG bunker vessel with GTT Mark III Flex membrane tank system; to be the biggest vessel of its kind built in Singapore. • Custom

  29. Slide 29: Higher value work at Repairs & Upgrades

    Slide 29: Higher value work at Repairs & Upgrades

    Higher value work at Repairs & Upgrades FY 2019 REPAIRS & UPGRADES – DIVERSE MARINE & OFFSHORE PROJECTS Tuas Boulevard Yard Admiralty Yard A wide variety of vessels calling for repairs Scrubber retrofit projects for Maran Tankers FSRU upgrading of BW Magna

  30. Slide 30: Higher value work at Repairs & Upgrades – LNG Repairs

    Slide 30: Higher value work at Repairs & Upgrades – LNG Repairs

    Higher value work at Repairs & Upgrades FY 2019 REPAIRS & UPGRADES – LNG Repairs Setting a new record with 55 LNG-related repair and upgrade jobs received in 2019 – the highest number of such contracts awarded to a single service provider in the global gas segment.

  31. Slide 31: Higher value work at Repairs & Upgrades – Cruiseships

    Slide 31: Higher value work at Repairs & Upgrades – Cruiseships

    Higher value work at Repairs & Upgrades FY 2019 REPAIRS & UPGRADES – CRUISESHIPS Retained our position as Asia’s top vessel repair and upgrading company in the cruise segment, with 16 cruise ship projects secured in 2019. Concurrent major refit and refurbishment of Norwegian Joy for Norwegian Cruise

  32. Slide 32: Investing in future growth

    Slide 32: Investing in future growth

    Investing in future growth  As the Group navigates its current business challenges, we are at the same time gearing up for the global economy’s shift towards cleaner energy use, with long-term investments in innovation, technologies and expertise for developing new engineering solutions. We are als

  33. Slide 33: Strengthening operations at Tuas Boulevard Yard

    Slide 33: Strengthening operations at Tuas Boulevard Yard

    Strengthening operations at Tuas Boulevard Yard  Sembcorp Marine’s new 30,000-tonne capacity gantry cranes at our flagship Tuas Boulevard Yard (TBY) will support a number of projects in 2020, including the installation of the Shell Vito FPU’s 9,200-tonne assembled topside on to its hull.  The 30,0

  34. Slide 34: Sharpening our sustainability focus

    Slide 34: Sharpening our sustainability focus

    Sharpening our sustainability focus  On the sustainability front, TBY in 2019 replaced over 5 gigawatt hours (GWh) of grid- supplied electricity with clean energy harnessed from the solar-roof installed at its steel fabrication facility. This helps the yard avoid about 2,400 tonnes of carbon emissi

  35. Slide 35: Sharpening our sustainability focus

    Slide 35: Sharpening our sustainability focus

    Sharpening our sustainability focus  Other than 3D printing, this facility will look at integrated digital robotic systems, tracking of assets, materials and manpower through Internet of Things (IoT), as well as Virtual and Augmented Reality applications for production control and visualisation. 

  36. Slide 36: Empowering our workforce

    Slide 36: Empowering our workforce

    Empowering our workforce  As we continue to optimise manpower resources according to variations in work volumes, we are making sure our employees have the right type and level of skills to deliver good productivity and safety outcomes while adapting to new and disruptive technologies introduced int

  37. Slide 37: Termination of quarterly reporting

    Slide 37: Termination of quarterly reporting

    Termination of quarterly reporting  With the SGX decision in January 2020 to do away with the quarterly reporting (QR) requirement for most listed companies, Sembcorp Marine will accordingly cease QR from 1Q 2020 onwards and release only the Group’s half-year and full-year financial results.  Howe

  38. Slide 38: Market outlook

    Slide 38: Market outlook

    Market outlook  Business activity levels remain low for all segments except for repairs and upgrades, which continues to improve, underpinned by IMO regulations that require installation of ballast water treatment systems and gas scrubbers.  Challenges remain, in particular supply chain disruption

  39. Slide 39: CFO Presentation

    Slide 39: CFO Presentation

    CFO Presentation  Earnings Performance  Financial Position 39

  40. Slide 40: Performance Highlights

    Slide 40: Performance Highlights

    Performance Highlights Key highlights: Group performance for year ended 31 December 2019:  Turnover totalled $2.88 billion compared with FY 2018 at $4.89 billion.  EBITDA of $104 million.  Net loss attributable to shareholders of $137 million.  Secured $1.49 million in new orders in 2019.  Grou

  41. Slide 41: Financial Highlights

    Slide 41: Financial Highlights

    Financial Highlights Group (S$ million) 4Q 2019 4Q 2018 % change FY 2019 FY 2018 % change Turnover 624 913 (32) 2,883 4,888 (41) Cost of sales (696) (893) (22) (2,974) (4,885) (39) Gross (Loss)/ Profit (72) 20 n.m. (92) 3 n.m. EBITDA (31) 59 n.m. 104 143 (28) Operating (Loss)/ Profit (89) 2 n.m. (13

  42. Slide 42: Financial Review: Revenue

    Slide 42: Financial Review: Revenue

    Financial Review: Revenue FY 2019 Revenue: $2.88 billion 6,000 5,000 4,888 913 4,000 1,167 3,035 $ million 3,000 2,882 912 623 2,000 1,627 717 729 649 731 1,000 1,180 746 811 - 2017 @ 2018 2019 1Q 2Q 3Q 4Q 42

  43. Slide 43: Financial Review: Net Profit/Loss

    Slide 43: Financial Review: Net Profit/Loss

    Financial Review: Net Profit/Loss FY 2019 Net Loss: $137 million 300 260 250 1Q 2Q 3Q 4Q 200 117 150 100 101 $ million 50 5 6 37 5 2 0 -9 -56 -50 -53 -30 -100 -74 -78 -150 -137 -200 2017 @ 2018 (restated) 2019 year to date @ Adjusted on adoption of SFRS (I) on January 1, 2018. 43

  44. Slide 44: Business Review: Turnover by Segments

    Slide 44: Business Review: Turnover by Segments

    Business Review: Turnover by Segments FY 2019: $2.88 billion FY 2018: $4.89 billion Offshore Specialised Offshore Platforms Shipbuilding Platforms 5% 1% 4% Repairs & Upgrades 10% Other Other Activities Repairs & Activities 1% Upgrades 1% 21% Rigs & Floaters Rigs & 72% Floaters 85% Turnover ($ millio

  45. Slide 45: Core Business: Rig Building

    Slide 45: Core Business: Rig Building

    Core Business: Rig Building Rig building revenue was $822 million in FY 2019 (FY 2018: $3.1 billion) on recognition of delivery of 1 jack-up rig to Borr Drilling of $216 million, Jack-up Rigs, and drill ship revenue from ongoing Transocean projects of $513 million Semi-submersibles, No. of ($382 m i

  46. Slide 46: Core Business: Floaters

    Slide 46: Core Business: Floaters

    Core Business: Floaters • FY 2019 Floater revenue increased 18% to $1.25 billion on Offshore Floating higher percentage recognition for the Johan Castberg FPSO, Shell Vito FPU and Karish FPSO projects. Production Newbuildings/ No. of REVENUE - FLOATERS ($ MILLION) Conversion projects Brief descripti

  47. Slide 47: Core Business: Offshore Platforms

    Slide 47: Core Business: Offshore Platforms

    Core Business: Offshore Platforms • Offshore Platforms revenue was $131 million in FY 2019 on contributions from Hornsea & Tangguh projects. No. of REVENUE – OFFSHORE PLATFORMS Offshore Platforms projects Brief description ($ MILLION) o No. of projects delivered in FY 2019 Nil 800 732 • Tangguh LNG

  48. Slide 48: Core Business: Repairs & Upgrades

    Slide 48: Core Business: Repairs & Upgrades

    Core Business: Repairs & Upgrades • Revenue from Repairs & Upgrades totalled $605 million in FY 2019 (FY 2018: $476 million), on higher average revenue per vessel due to improved vessel mix on relatively higher value works. REVENUE – REPAIRS & UPGRADES ($ MILLION) 605 Period FY 2019 FY 2018 % change

  49. Slide 49: Core Business: Specialised Shipbuilding

    Slide 49: Core Business: Specialised Shipbuilding

    Core Business: Specialised Shipbuilding • Maiden revenue contribution from Specialised Shipbuilding was $35 million for FY 2019 on recognition of ongoing Ropax ferries projects. Specialised Shipbuilding ($ million) 35 No. of Specialised Shipbuilding projects Brief description 30 25 o No. of projects

  50. Slide 50: Capital, Gearing and ROE

    Slide 50: Capital, Gearing and ROE

    Capital, Gearing and ROE Group ($ million) Dec-19 Dec-18 % change Shareholders' Funds 2,173 2,312 (6) Net Debt 4,012 3,391 18 Net Working Capital (310) 198 n.m. Net gearing ratio (times) (excluding subordinated loan) 1.14 1.44 (21) Net gearing ratio (times) 1.82 1.44 26 Interest coverage ratio (time

  51. Slide 51: Cashflow

    Slide 51: Cashflow

    > sembcorp Cashflow marine Group ($ million) 4Q 2019 4Q 2018 % change] FY 2019 FY 2018 % change Operating cashflow before working capital changes (42) 68 nm. 103 157 (34) Cash used in operations (272) (21) nm. (255) (121) 111 Net cash used in operating activities (279) (16) nm. (296) (170) 74 Net ca

  52. Slide 52: New Contracts Secured of $1.49 billion

    Slide 52: New Contracts Secured of $1.49 billion

    New Contracts Secured of $1.49 billion Contracts Secured ($ million) 3,500 Contracts Secured ($ million) Floaters 3,500 3,171 Floaters Offshore Platforms 3,000 3,171 Offshore Jack-Up Platforms 3,000 2,735 Jack-Up (cancelled) 2,735 2,500 1,292 Jack-Up (cancelled)- drilling/production/ Semi-submersibl

  53. Slide 53: Net Order Book at $2.44 billion

    Slide 53: Net Order Book at $2.44 billion

    Net Order Book at $2.44 billion Net orderbook by Product Type 9,000 Floaters 8,381 Offshore Platforms Specialised Shipbuilding/Refurbishment 8,000 7,835 7,575 Jack-Up Semi-submersible Transocean drillships 7,000 Sete Brasil drillships 3,126 6,214 3,126 6,000 3,126 5,000 1,269 3,126 4,000 1,309 1,269

  54. Slide 54: Forward-looking statements

    Slide 54: Forward-looking statements

    This presentation may contain forward-looking statements that involve risks and uncertainties. Actual future performance, outcomes and results may differ materially from those expressed in forward-looking statements as a result of a number of risks, uncertainties and assumptions. Representative exam

  55. Slide 55: Integrated Synergies, Global Possibilities.

    Slide 55: Integrated Synergies, Global Possibilities.

    Integrated Synergies, Global Possibilities.

Source: Internet Archive copy of sembcorp.com

More decks from Sembcorp Industries Ltd.

All 97 Sembcorp Industries decks