Dragon Mining Limited · HKEX:1712
Dragon Mining — Fennoscandian Exploration and Mining Conference 2011
27 slides from Dragon Mining's conference presentation, Nov 3, 2011
Slide 1: Dragon Mining Limited
DRAGON MINING LIMITED An Established Nordic Gold Producer with an Exciting Future Fennoscandian Exploration and Mining Conference 3 November 2011
Slide 2: Disclaimer
Disclaimer The purpose of this presentation is to provide general information about Dragon Mining Limited (the "Company"). Unless otherwise stated herein, the information in this presentation is based on the Company's own information and estimates. This presentation does not constitute or form any p
Slide 3: Notations
Notations The information in this presentation that relates to exploration targets are conceptual in nature, where there has been insufficient exploration to determine the full extent of the Mineral Resource and it is uncertain if further exploration will result in the expansion of the Mineral Resou
Slide 4: Established Nordic Gold Producer
Established Nordic Gold Producer Svartliden Gold Mine 35,000 ounces Vammala Production Centre 40,000 ounces Game Changer Kuusamo Gold Project Strong Financial Position (30 Sept 2011) $28.3m of liquid assets 2.3m Chalice shares (CHN) Production, Cashflow, Growth
Slide 5: Corporate Overview
Corporate Overview Issued Capital Board of Directors Ordinary Shares 75.2m Peter Cordin Executive Chairman Options ($1.40 – $2.10) 2.6m Michael Naylor Finance Director Peter Gunzburg Non Executive Director Market Capitalisation $100m Christian Russenberger Non Executive Director Tapani Järvinen Non
Slide 6: Outstanding Highlights
Outstanding Highlights Two established and profitable production centres 1.2 million ounces of Resources Outstanding game changing exploration project Strong cash balance to aggressively grow assets Moving to 150,000 ounce gold producer Production, Cashflow, Growth – Exciting Future
Slide 7: Svartliden Gold Mine
Svartliden Gold Mine Location
Slide 8: Svartliden Gold Mine
Svartliden Gold Mine Statistics to 30 September 2011 YTD Sept 2011 To Date Ore Processed 241,100 t 2,064,965 t Average Head Grade 3.2 g/t 4.5 g/t Average Recovery 90.3 % 90.7 % Gold Produced 22,638 oz 273,637 oz Produce 30,000 ounces in 2011, 35,000 ounces in 2012 Average cash cost US$850/oz
Slide 9: Svartliden Gold Mine
Svartliden Gold Mine Open Pit and Underground
Slide 10: Southern Finland Location
a Southern Finland Dragon Minin; 8 - Location HANHIMAA KUUSAMO SVARTLIDEN ORIVESI VAMMALA JOKISIVU
Slide 11: Vammala Production Centre
Vammala Production Centre Statistics to 30 September 2011 YTD Sept 2011 To Date Ore Processed 159,940 t 837,236 t Average Head Grade 4.2 g/t 5.3 g/t Average Recovery 83.9 % 83.5 % Gold Produced 17,760 oz 120,082 oz Produce 25,000 ounces in 2011, 40,000 ounces in 2012 Average cash cost US$875/oz
Slide 12: Orivesi Gold Mine
Orivesi Gold Mine Extended Mine Life
Slide 13: Jokisivu Gold Mine
Jokisivu Gold Mine Extended Mine Life
Slide 14: Kuusamo Gold Project
Kuusamo Gold Project Game Changer High grade open pit resource 3,396,000 tonnes @ 4.2 g/t gold (460,700 ounces) Potential for million ounce gold camp*. Aggressive exploration strategy focussed on Kuusamo North. 3 rigs active with plans to drill up to 100,000 metres to confirm depth and str
Slide 15: Kuusamo North
Kuusamo North Emerging Gold Camp
Slide 16: Kuusamo North: Juomasuo Deposit
Kuusamo North Juomasuo Deposit 1,955,000 tonnes @ 4.9 g/t gold (305,600 ounces) Multiple, sub-parallel, steeply dipping lodes. 298 historic drill holes for 17,191m. Bonanza historic intercepts: • 57.30m @ 62.56 g/t gold • 3.70m @ 426.98 g/t gold • 21.30m @ 58.79 g/t gold • 5.30m @ 206.85 g/t
Slide 17: Kuusamo North: Juomasuo Deposit
Kuusamo North Juomasuo Deposit 61 drill holes for 15,302m completed. New highlight intercepts: • 31.90m @ 45.67 g/t gold • 34.90m @ 9.30 g/t gold A A • 25.60m @ 9.66 g/t gold • 17.75m @ 16.59 g/t gold • 14.55m @ 4.81 g/t gold • 11.85m @ 5.30 g/t gold • 7.30m @ 8.18 g/t gold • 5.30m @ 12.97 g/t g
Slide 18: Kuusamo North: Juomasuo Deposit
Kuusamo North Juomasuo Deposit
Slide 19: Kuusamo North: Hangaslampi Deposit
Kuusamo North Hangaslampi Deposit 369,000 tonnes @ 5.1 g/t gold (60,500 ounces). Set of moderately dipping lodes striking N-S. 60 historical drill holes for 8,346m. Exceptional historical intercepts: • 23.50m @ 13.25 g/t gold • 26.95m @ 5.78 g/t gold • 19.20m @ 7.00 g/t gold • 21.05m @ 13.70
Slide 20: Kuusamo North: Hangaslampi Deposit
Kuusamo North Hangaslampi Deposit 30 holes for 3,450m completed. New highlight intercepts: • 9.00m @ 30.17 g/t gold • 12.45m @ 7.15 g/t gold • 6.00m @ 7.51 g/t gold B B Open along strike and with depth. 7.5m @ 3.4 g/t Au Target – 150,000 to 300,000 ounces* * Refer to Slide – Notations (3)
Slide 21: Kuusamo North: Hangaslampi Deposit
Kuusamo North Hangaslampi Deposit
Slide 22: Kuusamo North: Stand Out Target Areas
Kuusamo North Stand Out Target Areas
Slide 23: Kuusamo Gold Project: Project Development
Kuusamo Gold Project Project Development Metallurgy and Flow Sheet Development Trial mining and processing of Juomasuo ore in 1990’s. Test work program in development. Environmental Impact Assessment Established good local community and municipal dialogue with open briefings. Program commenc
Slide 24: Kuusamo Gold Project: Regional Potential
Kuusamo Gold Project Regional Potential 117km² holding. Highly prospective. Excellent targets. 2.0m @ 16.00 g/t Au Gold deposits Meurastuksenaho (42,400 ounces @ 3.6 g/t gold) and Sivakkaharju (11,300 ounces 9.0m @ 10.35 g/t Au @ 7.5 g/t gold). Up to 29.5 g/t Au Gold drill intercepts and r
Slide 25: Production Project Pipeline
Production Project Pipeline Moving to a 150,000 Ounce Gold Producer! 2011 2012 2013 2014 Svartliden 30,000 35,000 35,000 35,000 Vammala 25,000 40,000 55,000 55,000 Kuusamo 60,000 TOTAL 55,000 75,000 90,000 150,000 TOTAL 70,000 75,000 115,000 140,000 Reserves (oz) Resources (oz)
Slide 26: Investment Opportunity
Investment Opportunity Two established and profitable production centres 1.2 million ounces of Resources Outstanding game changing exploration project Strong cash balance to aggressively grow assets Moving to 150,000 ounce gold producer Production, Cashflow, Growth – Exciting Future
Slide 27: Appendices: Gold Resource Inventory
Appendices Gold Resource Inventory Gold Classification Tonnes Ounces (g/t) Svartliden Gold Mine, Sweden (31 July 2011) Measured 197,900 3.8 24,300 Indicated 1,034,600 3.7 125,400 Inferred 62,600 3.7 7,400 Total 1,295,100 3.8 157,100 Vammala Production Centre, Finland (31 December 2010) Measured 193,
Dragon Mining — Fennoscandian Exploration and Mining Conference 2011 on 6ix