Toachi Mining — Investor Presentation (January 2019)
24 slides from Toachi Mining's investor presentation, January 2019
Slide 1: Creating a Premier High Grade Gold & Copper Company
Creating a Premier High Grade Gold & Copper Company Corporate Presentation January 2019
Slide 2: Forward Looking Statements
Forward Looking Statements This document contains forward-looking statements under Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to the development potential and timetable of the Toachi project; the timing and amount of estimated
Slide 3: Company Share Structure
Company Share Structure Capital Structure As of January 7, 2019 Shares (M) Shares Issued and Outstanding 81,166,435 Convertible Debentures 9,583,332(1) Share Price (as of January 16, 2019) CAD$0.10 Options 5,427,000(2) Market Cap (CAD) ~$8M Warrants 10,558,749(3) 52 week high/low (CAD) $0.24 / $0.06
Slide 4: Management & Board
Management & Board World-class discoveries & operational experience • Professional engineer with over 25 years of leadership in project management, Latin America Alain Bureau • Former President & CEO of Pershimco Resources (Acquired by Orla Mining in 2016) President & CEO • Expertise in advanced sta
Slide 5: Strong Internal Capacity & Scientific Partners
Strong Internal Capacity & Scientific Partners Engineering Resource Metallurgy Environment & Calculation & Health Development & Processing & Modeling Safety Pierre Bureau, P.Eng, PMP Dr. Julian Barnes, B.Sc, Ph.D. Dr. Simon Meik, B.Sc, Ph.D. Andrea Chavez Former Global Construction Founder of RSG Gl
Slide 6: The Right Time in Ecuador
The Right Time in Ecuador • Ecuador aims to more than double mining value to GDP by 2021* • Significant public infrastructure investment in airports, roads, and ports • Policy shift towards increasing foreign investment • Fiscal stability contracts • VAT refund and accelerated depreciation • Enhance
Slide 7: La Plata Gold-Copper-Zinc-Silver VMS Project
La Plata Gold-Copper-Zinc-Silver VMS Project Hydroelectric Power Available at Low Cost Oil Producing Country Part of OPEC Ministry of Energy & LA PLATA Non-Renewable Natural Resources Carlos Pérez Garcia Consolidated Mining, Oil & Gas, and Electricity into one ministry Ecuadorian Government expects
Slide 8: TIM Location
TIM Location Power lines run across Located 100 km South-West of Quito (capital of Ecuador) the concession 85 km on paved highway Hydroelectric power Low elevation 1,600 m (Quito 2,850 m) plant 5 km away 8
Slide 9: The Genesis of Sub-Seafloor Replacement-Style VMS Deposits
The Genesis of Sub-Seafloor Replacement-Style Volcanogenic Massive Sulfide (VMS) Deposits • Sub seafloor replacement-style volcanogenic massive sulfide (VMS) deposits are a subset of VMS deposits where sulfides have replaced semi consolidated volcanic, volcano- sedimentary, and sedimentary material
Slide 10: Significant Exploration Potential
Significant Exploration Potential • VMS deposits tend to form in clusters which reinforces the prospect of further nearby deposits • +9 km of favorable geology along strike • Q. Romero: Drilled in 1965 - 1967 by Dr. Duncan R. Derry (Canadian Mining Hall of Fame) - 22m at 1.8% Cu • Guatuza target 150
Slide 11: Latest Exploration Results
Latest Exploration Results • New Discovery of VMS Horizon & Trench Cuts 2.5M @ 5.36 G/T Au, 71.18 G/T Ag, 2.14% Cu 3.22% Pb & 10.86% Zn • Encouraging stream sediment sampling results extending to 1.1 km the known VMS corridor footprint towards the north • 204 stream sediments samples collected & ass
Slide 12: La Plata NI-43-101 Resource Estimate
La Plata NI-43-101 Resource Estimate Unique Exposure to Base & Precious Metals La Plata Deposit – Inferred Mineral Resource Cut Off AuEq Au Ag Cu Pb Zn AuEq Au Ag Cu Pb Zn Mt AuEq gt/t (g/t) (g/t) (g/t) (%) (%) (%) (koz) (koz) (koz) (Kt) (Kt) (Kt) 2 2.4 10.96 3.4 42.2 2.7 0.5 3.8 842 261 3,241 64 13
Slide 13: La Mina Perspective Long Section
La Mina Perspective Long Section Open at depth Section Looking West Topographic Surface La Mina North Block Historic Open Pit 300M 2 Historic Underground 4 0 Workings 0 0 0 M AuEq M EXPANSION POTENTIAL 100 m EXPANSION POTENTIAL 13
Slide 14: La Plata Block Model
La Plata Block Model AuEq grade shells 10 & 20 g/t Section Looking West Topographic Surface La Mina North Block Historic Open Pit 300M Historic Underground 2 Workings 4 0 0 0 0 M M EXPANSION POTENTIAL AuEq GRADE SHELLS <10 10 to 20 100 m >= 20 EXPANSION POTENTIAL 14
Slide 15: Why Invest in Toachi?
Why Invest in Toachi? THE TOACHI ADVANTAGE • Proven Board and Management who have historically delivered value to shareholders • Focused on Advanced stage projects with track record of historical production • La Plata is a shallow, high grade project which results in reduced exploration and developm
Slide 16: In Country Partnership and Deal Terms
In Country Partnership and Deal Terms LOW COST OWNERSHIP AGREEMENT Partnership with OWNERSHIP Compañia Minera La Plata and Principal Allen Brown Hidalgo, established in Ecuador Requirements to Ownership to 65% Ownership to 75% acquire 60% ownership • TIM produces Feasibility Study • TIM raises requi
Slide 17: Community Involvement
Community Involvement • Our vision is to create strong and longstanding relationships with the local communities and all levels of government • Executed CSR program with support from the local community • Local community, municipality of Palo Quemado favourable tomining • No existing indigenous land
Slide 18: Value Creation in developing high grade projects
Value Creation in developing high grade projects Modest Investment | Significant Leverage • Expand La Mina’s high grade VMS resources Drill and • Cost of drilling and building ounces is low due to metal Expand La Mina value of the rock • High margin tonnes – create significant value • Preliminary Me
Slide 19: Summary
Toachi Mining High Grade Development & Exploration The Right Time in Ecuador SUMMARY • High grades in a gold-rich VMS project • Inaugural NI 43-101 delivered Q3 2017 • Positive exploration results recently defined 1.1 km VMS corridor footprint towards the north • Excellent exploration potentia
Slide 20: Appendix
Appendix
Slide 21: AuEq Grade – VMS Peers
AuEq Grade – VMS Peers October 2018 Based on NI 43-101 calculation -Metal price assumptions Zn: US$1.30/lb, Cu: US$2.85/lb, Pb: US$1.05/lb, Au: US$1,280/oz, Ag: US$17.00/oz A-1
Slide 22: Tonnage vs Rock Value – VMS Peers
Tonnage vs Rock Value – VMS Peers October 2018 Based on NI 43-101 calculation -Metal price assumptions Zn: US$1.30/lb, Cu: US$2.85/lb, Pb: US$1.05/lb, Au: US$1,280/oz, Ag: US$17.00/oz A-2
Slide 23: Tonnage vs AuEq Grade – VMS Peers
Tonnage vs AuEq Grade – VMS Peers October 2018 Based on NI 43-101 calculation -Metal price assumptions Zn: US$1.30/lb, Cu: US$2.85/lb, Pb: US$1.05/lb, Au: US$1,280/oz, Ag: US$17.00/oz A-3
Slide 24: For More Information, please contact Candace Di Vito
For More Information, please contact Candace Di Vito Manager, Investor Relations 416.365.7043 Head Office Ecuador Office cdivito@toachimining.com 2400 - 120 Adelaide Street West SiteCenter Tower 2, Office #101 Toronto, Ontario M5H 1T1 Cumbaya sector, Quito, Ecuador