Capstone Copper Corp. · TSX:CS
Capstone Copper — Capstone Mining — Technical Presentation (June 2020)
8 slides from Capstone Copper's technical presentation, Jun 11, 2020
Slide 1: Cozamin Resource Update
COZAMIN RESOURCE UPDATE MNFWZ Vein 20 M&I Resource Expands by 118% to 13.1 Million Tonnes at 2.35% Copper and 52 g/t Silver JUNE 11, 2020
Slide 2: Cautionary Notes
Cautionary Notes CAUTIONARY NOTE ON FORWARD LOOKING INFORMATION COMPLIANCE WITH NI 43-101 This presentation, and the documents incorporated by reference herein, contains “forward-looking information” within the Unless otherwise indicated, Capstone has prepared the technical information in this prese
Slide 3: Cozamin: MNFWZ Vein 20 Indicated Resource Growth
Cozamin: MNFWZ Vein 20 Indicated Resource Growth Measured & Indicated As of April 30, 2020 Compared to as of December 31, 2019 December 31, 2019 Resource Estimate Copper-Silver Zones 13,086 kt 118% increase in tonnes 2.35% Cu 4% increase in copper grade Mala Noche Footwall Zone Vein 20 52 g/t Ag 3%
Slide 4: The Best Has Yet to Come at Cozamin
The Best Has Yet to Come at Cozamin • 108,000 meters of drilling within a budget of Tonnes Copper Silver Zinc Lead Copper Silver Zinc Lead Classification Metal Metal Metal Metal US$10 million since the 2018 Technical (kt) (%) (g/t) (%) (%) (kt) (koz) (kt) (kt) Report, has increased total Measured an
Slide 5: Cozamin Conceptual Stacked Targets: Future Test Program
Cozamin Conceptual Stacked Targets: Future Test Program 2021+ Target Area Copper upper target Low-Grade Zone ? Copper discovery phase 2 Potentially Faulted Down? ? Low-Grade Zone Copper discovery phase 1 ? ? Copper lower target Copper % * Estimated True Width (m) Priority Step-out 0 5 10 15 20 25 30
Slide 6: Cozamin Has Delivered Best In Class Returns
Cozamin Has Delivered Best In Class Returns Cumulative free cash flow of over $450M since 2007 Total invested between 2006-2008 = $52 million Expansion investments Acquisition Avg. Cu $/lb: $3.05 $3.19 $3.15 $2.34 $3.42 $3.84 $3.66 $3.30 $3.03 $2.35 $2.27 $2.86 $2.92 $2.76 NOTE: Tax cash flows estim
Slide 7: Cozamin Reserves & Resources
Cozamin Reserves & Resources COPPER Total Proven & Probable Cu Mineral Reserve 78 kt contained metal (5,166 kt @ 1.50% Cu) Total Measured & Indicated Cu Mineral Resource 431 kt contained metal (26,458 kt @ 1.63% Cu) Inferred Cu Mineral Resource 104 kt contained metal (14,594 kt @ 0.71% Cu) SILVER To
Slide 8: Contact Information
Contact Information GENERAL INQUIRES MEDIA AND INVESTOR INQUIRIES Capstone Mining Corp. Jerrold Annett Suite 2100 – 510 West Georgia Street Vice President, Strategy & Capital Markets Vancouver, BC V6B 0M3 Suite 2700 – 161 Bay Street Toronto, ON M5J 2S1 www.capstonemining.com 1-416-572-2272 inf