Pembina Pipeline Corporation · TSX:PPL

Pembina Pipeline — Investor Day (May 2017)

127 slides from Pembina Pipeline's investor day presentation, May 16, 2017

  1. Slide 1: Investor Day May 16, 2017

    I n v e s t o r D a y | M a y 1 6 , 2017 | TSX: PPL; NYSE: PBA

  2. Slide 2: Forward-looking statements and information

    Forward-looking statements and information This presentation contains certain forward-looking statements and Veresen and management expectations in relation thereto, the availability public filings available in Canada at www.sedar.com and in the United information that are based on Pembina's expecta

  3. Slide 3: Our team presenting today and agenda

    Our team presenting today and agenda Agenda and Presentation Outline Presenter Introduction and Pembina Overview Mick Dilger Mick Dilger Scott Burrows The 'Purpose' of Pembina Mick Dilger President & Vice President Chief Executive Officer Finance & Strategy: Increasing value/decreasing risk Mick Dil

  4. Slide 4: Introduction and Pembina Overview

    Introduction and Pembina Overview Mick Dilger

  5. Slide 5: Update since last Investor Day

    Update since last Investor Day • ~8.9 million hours worked safely by employees since 2014 (3rd consecutive year of no employee lost-time injuries)(1) • Record 2016 adjusted EBITDA of ~$1.2 BB and ACFPS of $2.54 • Record Gas Services volumes of 836 MMcf/d and Conventional Pipelines volumes of 650 mbp

  6. Slide 6: Veresen combination highlights

    Veresen combination highlights Near-term secured growth increases from One of Canada's ~$4 BB Low risk business to largest energy infrastructure platform: 5.8 Bcf/d companies: ~$6 BB 85%+ of combined gas processing by $33 BB fee-for-service cash flows mid-2018 total enterprise (pro forma average (ne

  7. Slide 7: Pembina represents a unique investment opportunity

    Pembina represents a unique investment opportunity Pembina Veresen Combined Common shares outstanding(1) 401 million 314 million 501 million TSX common share trading price (1) $43.25 $18.45 $43.25 TSX 52-week trading range (1) $36.36 - $44.50 $8.51 - $18.45 $36.36 - $44.50 Market capitalization(1) $

  8. Slide 8: Combined Pembina and Veresen Asset Base

    MONTNEY (Resource Life – 140 years) OIL SANDS Combined Pembina and (Resource Life – 145 years) Veresen Asset Base DEEP BASIN FORT McMURRAY (Resource Life – 40 years) TAYLOR Pembina Gas Processing Plant Veresen Gas Processing Plant SWAN HILLS Pembina Fractionator Pembina Storage Facility Veresen Stor

  9. Slide 9: Combined Pembina and Veresen Asset Base

    MONTNEY (Resource Life – 140 years) OIL SANDS (Resource Life – 145 years) Combined Pembina and DEEP BASIN FORT McMURRAY (Resource Life – 40 years) Veresen Asset Base SWAN HILLS Pembina Gas Processing Plant Veresen Gas Processing Plant PRINCE GEORGE Pembina Fractionator CARDIUM Veresen Fractionator (

  10. Slide 10: Integrated, customer-focused value chain

    Integrated, customer-focused value chain Empress, Sarnia and Corunna Value chain extension opportunities (Mainline Extraction, Fractionation, Distribution) Gas & NGL Propane Via NGTL exports NGL Storage Fractionation Distribution Value Chain Conventional Pipelines NGL Midstream ("HVP") Production Co

  11. Slide 11: Key strategic rationale diversification

    Key strategic rationale  diversification Pembina Veresen Pro Forma 3% Pipelines 25% 27% Processing Operating Segment 34% 53% 58% (2018 EBITDA)(1) 13% 70% 17% Midstream (NGL & Crude) 6% 13% Crude Oil 35% 33% Hydrocarbon Mix 45% 94% NGL 41% (2018 EBITDA)(1) Gas 32% US 21%  WCSB  WCSB US  WCSB US 2

  12. Slide 12: Holistic approach to creating value: The 'purpose' of Pembina

    Holistic approach to creating value: The 'purpose' of Pembina Mick Dilger

  13. Slide 13: The 'Purpose' of Pembina

    The 'Purpose' of Pembina "For our stakeholders to view us as being the leader in the Canadian energy infrastructure sector", namely: We ensure no harm to people or the environment; We are the 'first choice' by customers to cost-effectively and reliably connect them to markets; We provide sustainable

  14. Slide 14: Ensure no harm to people or the environment

    Ensure no harm to people or the environment Employee recordable injury rates per 200,000 hours worked in 2016 Employee lost-time injury rates per 200,000 hours worked in 2016 1.00 0.5 0.50 0.4 0.1 0.1 - 0 0.0 CEPA CEPA Pembina's 1,300+ employees have worked 13 consecutive quarters, totaling over ~8.

  15. Slide 15: We are our customers' 'first choice'

    We are our customers' 'first choice'  Multi-product service offering  Potential discounts for multiple service commitments  Volume discounts  Ability to align commitments across the value chain (i.e. outage coordination)  Linked step-up rights across infrastructure Strategically- located assets

  16. Slide 16: We provide sustainable industry-leading returns (10 years)

    We provide sustainable industry-leading returns to our shareholders (10 years) Total return: Pembina vs S&P/TSX Energy Infrastructure 700 ~440% Relative Total Return (100 = January 1, 2007) 600 500 400 300 200 100 ~210% - 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 (1) S&P/TSX Energy Infr

  17. Slide 17: We provide sustainable industry-leading returns to our shareholders

    We provide sustainable industry-leading returns to our shareholders .00 Possible 2018 EBITDA/share range 2006 2016 Increase (Combined) .50 ($MM) ($MM) (%) $5.10 - $5.50(1) .00 Consolidated Operating Margin $215 $1,335 ~520% Conventional Pipelines $133 $494 ~270% .50 Crude Oil Midstream $45 $162 ~260

  18. Slide 18: We have a trustworthy, respectful, collaborative and fair work culture

    We have a trustworthy, respectful, collaborative and fair work culture making us the 'employer of choice' Employee summary Recognized for being a top employer An employee culture that gives back Employee engagement and turnover One of Pembina's most valuable assets are its dedicated people that come

  19. Slide 19: We set the standard for harmonious relationships

    We set the standard for harmonious relationships with all of our stakeholders Historical Community Investment 2016 Community Investment Aboriginal Relations $4.0 $3.8 • Supported/invested in: • $36 MM in procurement to Aboriginal − 31 volunteer fire departments businesses in 2016 $3.5 • Aboriginal E

  20. Slide 20: Staying true to our strategy of increasing value and decreasing risk

    Staying true to our strategy of increasing value and decreasing risk Mick Dilger

  21. Slide 21: We remain confident in our strategy

    We remain confident in our strategy Pembina's strategy Veresen's alignment Preserve value Both companies have a proven record of supporting safe, reliable and by providing safe, cost-effective, reliable services cost-effective midstream services for their customers (1) Diversify our asset base Exten

  22. Slide 22: A proven track record of value chain investment and extension

    A proven track record of value chain investment and extension Initial Extension Follow on Integrated Value Chain Highlights Investment Investment Pembina system constructed to • Largest NGL feeder system in bring product from Drayton WCSB 1954 - Valley to Edmonton $3 BB+ • Largest crude oil feeder p

  23. Slide 23: The evolution of Pembina's value chain

    The evolution of Pembina's value chain Pembina's operating margin ($MM) Gas services creation  value chain extension 1 (attract liquids to conventional pipelines) 0 Provident acquisition  value chain extension 0 2 (downstream services for conventional volumes) 4 0 Vantage acquisition  geographic

  24. Slide 24: Pembina and our largest Canadian peers

    Pembina and our largest Canadian peers WCSB Liquids Gathering Capacity(1) and Estimated Throughput(2) WCSB Above and Below Ground Hydrocarbon Storage Capacity(1) 3,000 Phase III and IV (Mid -2017 – Capacity Contracted Throughput 12 Veresen Underground Above Ground Late 208) 2,500 Veresen 2,000 8 mmb

  25. Slide 25: Large-scale combined growth capex program

    Large-scale combined growth capex program 0 (Unsecured Growth) Pembina 0 Veresen ~$20 BB 0 • Alliance Expansion • Incremental 0 Veresen Midstream (Secured Growth) • PDH/PP Facility 0 • Peace Expansion • Export Terminal ~$6 BB • Duvernay 0 $2.4 BB $2.5 BB • Phases III – V Development • RFS III $1.9 B

  26. Slide 26: Pembina is on very strong growth trajectory

    Pembina is on very strong growth trajectory Historical Adjusted EBITDA and 2018 Outlook ~$2.55 BB to ~$2.75 BB ~$1.8 BB to ~$1.9 BB $1,189 MM $983 MM $920 MM Contribution from growth projects Commodity prices (1) 2014 2015 2016 2018 2018 (2) (Combined) Pembina is delivering on its promise and creati

  27. Slide 27: Dividend growth supported by growing cash flow

    Dividend growth supported by growing cash flow $3.00 $2.50 $2.00 $/Share $1.50 $1.00 $0.50 - 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017E Dividend per share Adjusted cash flow from operating activities per share Strong history of growing Pembina's dividend and adjusted cash flow per

  28. Slide 28: Proven M&A track record

    Proven M&A track record EV/operating margin multiple at acquisition Current EV/operating margin multiple 12.1x (2018E) 11.8x 12.0x 11.6x 11.6x 12.0x 10.0x 10.0x ~10x 10.0x 10.0x 9.2x 8.7x 8.9x 8.9x 8.0x 8.0x 7.5x 6.0x 6.0x 4.0x 4.0x 2.0x 2.0x 0.0x 0.0x Cutbank Edmonton Provident Vantage Paramount Ve

  29. Slide 29: Investing for tomorrow

    Investing for tomorrow Historical integrity and support infrastructure spending(1) Pipeline and facility integrity $300 Volumetric management systems $200 Project development and governance frameworks $MM Accounting systems $100 Inventory management system - Risk management and security 2006 2007 20

  30. Slide 30: Stabilizing macro environment supporting our resilient customer base

    Stabilizing macro environment supporting our resilient customer base Stu Taylor

  31. Slide 31: Modest recovery to stability in commodity prices

    Modest recovery to stability in commodity prices Crude oil pricing Natural gas pricing Indicative fractionation spread(1) $120 $6.00 $60 $100 $5.00 $50 $80 $4.00 $40 $US / Bbl $US / Bbl $C / Gj $60 $3.00 $30 $40 $2.00 $20 $20 $1.00 $10 - - - 2010 2011 2012 2013 2014 2015 2016 2017 2010 2011 2012 201

  32. Slide 32: Market conditions are supporting increased activity

    Market conditions are supporting increased activity WCSB rig count WCSB rig utilization 700 60% 51% 600 500 39% 40% 37% 400 30% 26% 26% 300 23% 23% 20% 200 20% 13% 12% 100 8% - Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec - 1Q 2Q 3Q 4Q 5-year range 5-year avg 2016 2017 2015 2016 2017E Commodity p

  33. Slide 33: Propane markets have continued to improve

    Propane markets have continued to improve Propane inventories US propane production US propane exports vs. capacity 1,600 120 US 1,400 100 1,400 80 mmbbls 1,200 60 1,200 40 1,000 20 - 1,000 800 mbpd Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec mbpd 5 Yr. Range 2016 2017 800 600 20 600 400 CA 15 2

  34. Slide 34: WCSB resource plays and top producers

    WCSB resource plays and top 10 producers Montney(1) Duvernay(1) 7.0 400 ~4,050 producing wells CAGR  ~23% ~405 producing wells CAGR  ~245% 6.0 (~70% of total) (~95% of total) Total Production (MMcfe/d) Total Production (Bcfe/d) 300 5.0 TOU TET MUR CNQ HSE APA VII TET 4.0 MUR 200 REP ECA BIR 3.0 Ve

  35. Slide 35: 2016 was a year of repositioning for customers

    2016 was a year of repositioning for customers Producers have seen share prices recover… They completed strategic transactions… 180 $1.4 BB $1.9 BB 170 160 $700 MM $625 MM Relative Performance (Base = 100) 150 148 $556 MM $538 MM 140 …And raised equity to ensure financial strength 130 132 120 $1.5 B

  36. Slide 36: Attractive netbacks in key WCSB resource plays

    Attractive netbacks in key WCSB resource plays Illustrative resource play analysis (Q4 2016) (C$/Boe)(1) Deep Montney Montney Swan Cardium Basin (Gas) DuvernayMontney (Oil) (Oil) Hills Oil Oil Estimated cash netback Deep Basin Montney (Gas) Duvernay Swan HillsCardium $45 $45 Revenue Royalties Transp

  37. Slide 37: Our customers focus on long-life economic reserves

    Our customers focus on long-life economic reserves North American Gas resource play break even(1) North American Oil resource play break even(1) $3.50 Denotes plays which Pembina serves Denotes plays which Pembina serves $60 $3.00 2017 Average NYMEX Price -->$3.25/Mcf 2017 Average WTI Price -->$49/B

  38. Slide 38: Building something extraordinary

    Building something extraordinary: commissioning ~$4 billion of new capital projects and positioning for long-term growth Paul Murphy

  39. Slide 39: Hydrocarbon pipeline transportation capacity

    Hydrocarbon pipeline transportation capacity 3,500 Hydrocarbon Liquids Natural Gas ~3.2 MMboed 125 In-service 3,000 138 Project under development 330 Uncommitted Project 250 2,500 180 2,000 420 Mboed 230 1,500 389 1,000 250 263 106 205 Mboed 500 628 ~2.9 Converted at 6:1 ratio MMbpd - Pre Expansion

  40. Slide 40: Summary of major projects completed in 2016

    Summary of major projects completed in 2016 (LVP) • Horizon Expansion − Expansion of the existing system to 250 mbpd − Included upgrading of mainline pump stations and other facility modifications − Completed on time and under budget − Commissioned July 1, 2016 • Karr Lateral − ~35 km lateral in the

  41. Slide 41: Project execution highlights LVP Value Chain

    Project execution highlights  LVP Value Chain Safety metric(1) Capital Cost LTI Project In-service date Completed on-time? Completed on-budget? Man Hours Travel (km) ($MM) Frequency Heavy Oil & Oil Sands Horizon Expansion $130 July 2016 On time Under budget 244,000+ 1,580,000+ 0 Mitsue: ahead of sc

  42. Slide 42: LVP Value Chain Growth

    Pembina Crude Oil Pipelines 3 Pembina NGL Pipelines Railway TAYLOR FORT McMURRAY GIBBONS 4 FORT SASKATCHEWAN NAMAO JOSEPHBURG 2 Pembina Gas Processing Plant Veresen Gas Processing Plant 1 4 Pembina Fractionator EDMONTON 5 FORT Cloverbar Hub 5 Pembina Conventional Pipelines SASKATCHEWAN EDMONTON SHER

  43. Slide 43: Phase III

    1 Phase III Conventional Pipelines Project overview Construction update • Largest expansion project in Pembina's history  Expected Key accomplishments in 2016 capital investment of $2.44 billion • Received AER approval in April 2016 • 880 km total of new pipeline with four distinct lines from Fox •

  44. Slide 44: Phase III Construction Photos

    1 Phase III Construction Photos Conventional Pipelines 44

  45. Slide 45: Phase IV and Phase V

    2 Phase IV and Phase V Conventional Pipelines Project overview Construction update • Ongoing customer demand  additional pipeline Key activities and accomplishments in 2017 expansions • Phase IV: • Phase IV: $75 million in capital − Move engineering from FEED to detailed design − Two pump stations

  46. Slide 46: NEBC Montney Expansion

    3 NEBC Montney Expansion Conventional Pipelines Project overview Construction update • Large-scale pipeline expansion  Expected capital Key accomplishments in 2016 investment of $235 million • Completed detailed engineering design • Underpinned by long-term, cost-of-service agreement with • Conduct

  47. Slide 47: NEBC Montney Expansion Construction Photos

    3 NEBC Montney Expansion Construction Photos Conventional Pipelines 47

  48. Slide 48: Canadian Diluent Hub

    4 Canadian Diluent Hub Crude Oil Midstream Project overview Construction update • Large-scale diluent terminal designed to accommodate diluent Key accomplishments in 2016 supply from Pembina's integrated value chain  Expected • Started construction of terminal in May 2016 capital investment of ~$21

  49. Slide 49: CDH Overview

    4 CDH Overview Crude Oil Midstream CDH will be cost competitive with alternative routing to CDH offers storage to third parties in either cavern or above connected delivery pipelines ground tanks Cavern Storage at RFS • Currently in service " 12 ris 0" • Ability to store up to 500,000 barrels of con

  50. Slide 50: Canadian Diluent Hub Construction Photos

    4 Canadian Diluent Hub Construction Photos Crude Oil Midstream 50

  51. Slide 51: Edmonton North Terminal

    5 Edmonton North Terminal ("ENT") Crude Oil Midstream Project overview Construction update • Original storage on site  ~300 mbbls Key accomplishments in 2016 • Provides strategically-located storage upstream of pipeline alley • Completed Swan Hills to ENT HDD • Storage of various grades (sour, swee

  52. Slide 52: Edmonton North Terminal Construction Photos

    5 Edmonton North Terminal Construction Photos Crude Oil Midstream 52

  53. Slide 53: Potential Alliance Pipeline Expansion

    6 Potential Alliance Pipeline Expansion Expansion considerations Illustrative Alliance map • In response to shipper demand to access the premium Chicago Septimus Gas Plant market, Alliance is evaluating a potential expansion to increase MONTNEY system capacity by ~30% (~500 MMcf/d) Ft. St. John Sept

  54. Slide 54: Drone footage

    Drone footage Aerial footage of Pembina's LVP growth projects 54

  55. Slide 55: Building something extraordinary

    Building something extraordinary: commissioning ~$4 billion of new capital projects and positioning for long-term growth Stuart Taylor

  56. Slide 56: Summary of major projects completed in 2016

    Summary of major projects completed in 2016 (HVP) • Musreau III − 100 MMcf/d shallow cut facility with liquids capacity of ~3,000 bpd − Completed on time and under budget in April 2016 − Leverages engineering and design work from our existing Musreau and Musreau II facilities and uses the same pipel

  57. Slide 57: Project execution highlights HVP Value Chain

    Project execution highlights  HVP Value Chain Safety metric(1) Capital Cost LTI Project Date in-service Completed on-time? Completed on-budget? Man Hours Travel (km) ($MM) Frequency Gas Services Musreau III $85 April 2016 Ahead of schedule Under budget 134,000+ 500,000+ 0 Resthaven Expansion $70 Ap

  58. Slide 58: Creating the WCSB's largest third-party gas processor

    Creating the WCSB's largest third-party gas processor 7,000 In-service ~5.8 Project under development + Duvernay Potential Bcf/d 6,000 470 5,000 ~4.2 897 60 100 Bcf/d 243 4,000 MMcf/d 3,000 2,088 2,000 325 234 400 1,000 250 (2009) 455 318 - Cutbank - Initial Cutbank - Kakwa River Saturn Complex Rest

  59. Slide 59: Fractionation capacity across three NGL market hubs

    Fractionation capacity across three NGL market hubs 350 ~300 Edmonton Sarnia, Ontario US Midcontinent mbpd 300 ~250 56 250 mbpd 20 18 200 Mbpd 55 150 73 100 (2012) 9 8 50 65 - RFS I RFS RFS C3+ RFS II RFS III RFS III De- Sarnia Pembina Aux Sable (Net) Total Debottleneck Debottleneck (Q1 2016) (Q3 20

  60. Slide 60: Significant growth in hydrocarbon storage capacity

    Significant growth in hydrocarbon storage capacity Hydrocarbon storage capacity (underground and above ground) 6.0 Underground Storage Capacity (Redwater and Veresen) Above Ground Storage Capacity 14.2 In-Service Project Under Development MMbbls 4.0 0.5 0.3 0.6 1.0 2.0 1.6 0.0 1.5 8.0 6.5 0.6 1.7 MM

  61. Slide 61: HVP Value Chain Growth

    HVP Value Chain Growth Pembina Gas Processing Plant Veresen Gas Processing Plant 4 2 III RFS Pembina Fractionator TAYLOR Pembina Conventional Pipelines RFS II Pembina Oil Sands Pipelines Pembina Gas Gathering Pipelines 6 Alliance Pipeline AEGS Pipeline RFS I 2 PRINCE GEORGE 3 1 EDMONTON FORT SASKATC

  62. Slide 62: Duvernay I

    1 Duvernay I Gas Services Project overview Construction update • Development of a new 100 MMcf/d shallow cut gas plant  Key accomplishments in 2016 Expected capital investment of $125 million (gross) • Completed design engineering • NGL extraction capacity of ~5,500(1) bpd • Completed procurement a

  63. Slide 63: Duvernay I Construction Photos

    1 Duvernay I Construction Photos Gas Services X 63

  64. Slide 64: Duvernay Field Hub

    2 Duvernay Field Hub Gas Services Project overview Construction update • Developing an infrastructure network that extends the Key accomplishments in 2016 reach of Pembina's Duvernay I facility  Expected capital • Completed 1.2 km access road and earthworks at the Field investment of ~$145 million

  65. Slide 65: Duvernay Field Hub Construction Photos

    2 Duvernay Field Hub Construction Photos Gas Services 65

  66. Slide 66: Duvernay infrastructure development opportunity

    3 Duvernay infrastructure development opportunity Illustrative Duvernay development map(1) Overview • Infrastructure development and service agreement with Chevron Canada Limited ("Chevron") • 20-year agreement with a significant area of dedication across Chevron's Duvernay land base • Proposed infr

  67. Slide 67: RFS III

    4 RFS III NGL Midstream Project overview Construction update • New 55 mbpd C3+ fractionator at Pembina's Redwater site Key accomplishments in 2016  Expected capital investment of ~$415 million • Delivery and installation of all equipment including the • Underpinned by long-term, approximately 100%

  68. Slide 68: RFS III Construction Photos

    4 RFS III Construction Photos NGL Midstream 68

  69. Slide 69: Terminalling Services for NWR Sturgeon Refinery

    5 Terminalling Services for NWR Sturgeon Refinery NGL Midstream Project overview Construction update • Provide terminalling services for Sturgeon Refinery (North Key accomplishments in 2016 West Redwater Partnership) under a 30-year fixed return • Received approvals/permits agreement and a 10-year f

  70. Slide 70: Terminalling Services for NWR Sturgeon Refinery Photos

    5 Terminalling Services for NWR Sturgeon Refinery Photos NGL Midstream 70

  71. Slide 71: Gas Processing Facilities

    6 Gas Processing Facilities Veresen Midstream Construction Photos Project overview (gross capacities) Construction update • 400 MMcf/d sweet gas processing plant • Estimated cost: ~$860 MM (gross) • 5,700 bpd NGL (C3+) recovery • Overall progress: ~75% complete Sunrise • 2,750 bpd condensate handlin

  72. Slide 72: Burstall Ethane Storage Cavern

    7 Burstall Ethane Storage Cavern Veresen growth project Construction Photos Project overview Construction update • Salt cavern ethane storage facility with a Key accomplishments in 2016 capacity of ~1 million barrels • Completed site construction for wash processes • Expected in-service date of Q4 2

  73. Slide 73: Drone footage

    Drone footage Aerial footage of Pembina's HVP growth projects 73

  74. Slide 74: The future: doing more with molecules we already handle

    The future  doing more with molecules we already handle Challenge  the WCSB is oversupplied Opportunity  economically advantaged feedstock with numerous hydrocarbons supports value-add infrastructure development Product Value-add opportunity End use/value-added product Natural Gas • Jordan Cove L

  75. Slide 75: Illustrative WCSB propane supply and demand

    Illustrative WCSB propane supply/demand considerations 250 200 Propane Volume (Mbpd) 150 100 50 - 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Alberta Demand Eastern Canadian Demand CKPC PDH (550 kTa) Inter Pipeline PDH (525 kTa) Kinder Morgan Cochin Deliveries Excess Propane Sup

  76. Slide 76: LPG export terminal

    LPG export terminal LPG export terminal opportunity Illustrative shipping considerations • Global opportunity − Growing North American production and robust international market demand • Decrease of traditional markets − Eastern Canada and US expected to be supplied by growing US production • Canadi

  77. Slide 77: Assessing LPG West Coast Export Terminal Opportunity

    Assessing LPG West Coast Export Terminal Opportunity Watson Island  potential site highlights • Signed a non-binding letter of intent with the City of Prince Rupert • Site features sheltered berth, adequate existing dock infrastructure, and well- established rail connections between Redwater, AB an

  78. Slide 78: Proposed PDH/PP Facility Overview

    Proposed PDH/PP Facility Overview Proposed PDH/PP Facility Different grades of PP have different characteristics • Automotive • Pembina and PIC are progressing a proposed world-scale integrated • Housewares PDH/PP production facility to be located in Alberta's Industrial • Dairy containers • Housewa

  79. Slide 79: PDH/PP Uses/Supply/Demand

    PDH/PP Uses/Supply/Demand World Plastic Demand by Polymer(1) Canadian PP Demand(1) Polyethylene 700 PP 250 mmta derivatives account 600 for a combined 92 Volume ('000 MT) Other 26% 500 36% mmta (38%) with 400 PP having the 2nd 300 largest share at 63 200 PE mmta (26%) 100 38% worldwide - 2011 2012 2

  80. Slide 80: Project update: key developments since announcement

    Project update  key developments since announcement • Completed detailed feasibility study  reviewed target markets, preliminary engineering, logistics and cost-competitiveness • Executed 50/50 Joint Venture ("JV") agreements, including: − Formed Canada Kuwait Petrochemical Corporation ("CKPC") −

  81. Slide 81: Jordan Cove LNG overview

    Jordan Cove LNG overview Project Considerations Illustrative Site Layout Why Jordan Cove? Jordan Cove LNG Terminal Price competitive with USGC brownfield • 7.8 MMTPA(1) (~1.3 Bcf/d) greenfield on a delivered into Tokyo basis liquefied natural gas export facility Pacific Connector Pipeline 9 days shi

  82. Slide 82: Committed to maintaining our financial 'Guard Rails'

    Committed to maintaining our financial 'Guard Rails' Scott Burrows

  83. Slide 83: Financial 'Guard Rail' considerations

    Financial 'Guard Rail' considerations Pembina Pembina Combined (2015A) (pre-transaction) Maintain target of 80% fee-for-service ~84% ~87% 1 ~77% (2018 – 2022) (2018 – 2022) contribution to EBITDA ~16% >20% >20% 2 Maintain 'strong' BBB credit rating FFO/Debt(1) FFO/Debt(1) FFO/Debt(1) Target 75% cred

  84. Slide 84: Maintain target of 80% fee-for-service contribution to EBITDA

    Maintain target of 80% fee-for-service 1 contribution to EBITDA Contribution by contract type ($MM) Fee-based = Fee-based = Fee-based = Fee-based = Fee-based = 77% 77% 80% 83% 86% $3 ~4% $3 ~10% ~4% ~16% $2 ~5% ~13% $2 ~15% ~18% ~4% ~1% ~19% ~19% $1 ~22% ~70% ~13% ~33% ~65% $1 ~61% ~64% ~44% - 2015A

  85. Slide 85: Commitment to a strong 'BBB' credit rating

    2 Commitment to a strong 'BBB' credit rating (Managing toward target credit metrics) Considerations Debt/Adjusted EBITDA (2018 Forecast)(1) • Unwavering long-term financial strategy: 4.5x − Financing growth 50% debt/50% equity 4.0x 3.75x - 4.25x − Maintain 'strong' BBB rating 3.5x − Ensure ample liq

  86. Slide 86: Target 75% credit exposure from investment grade and secured counterparties

    Target 75% credit exposure from investment grade 3 and secured counterparties 60-day credit exposure(1,3) Credit considerations AA- to AA+ Non Investment Grade 20% • Pembina assesses all counterparties during on-boarding 20% process and actively monitors credit limits and exposures across the busine

  87. Slide 87: Target <100% payout of fee-for-service distributable cash flow by 2018

    Target <100% payout of fee-for-service 4 distributable cash flow by 2018 ALBERTA SASKATCHEWAN 015A 2016A 2017E Illustrative fee-for-service distributable cash flow analysis(1) 2018E (Combined) Considerations FFS Payout • Target = dividend and all corporate ~80% costs underpinned 100% by fee- for-ser

  88. Slide 88: Pembina is on a very strong growth trajectory

    5 Pembina is on a very strong growth trajectory Historical Adjusted EBITDA and 2018 Outlook ~$2.55 BB to ~$2.75 BB ~$1.8 BB to ~$1.9 BB $1,189 MM $983 MM $920 MM Contribution from growth projects Commodity prices (1) 2014 2015 2016 2018 2018 (2) (Combined) Pembina is delivering on its promise and cr

  89. Slide 89: Continuing financial strength and ability to access markets to fund growth

    Continuing financial strength and ability to access markets to fund growth Scott Burrows

  90. Slide 90: Larger and stronger together

    Larger and stronger together Total enterprise value ($BB)(1) Relative positioning (EV $BB)(1,2) $35 Veresen Pembina $33 Market Capitalization Net Debt $30 $106 $106 Pro Forma $23 $25 $20 ~45% $15 Increase $10 $5 - Current Combined 2018 Adjusted EBITDA ($BB) $3.0 Veresen Pembina $2.55 - $2.75 $40 $2.

  91. Slide 91: Commodity price considerations

    Commodity price considerations Sustained financial performance Long-term record of dividend growth Growing dividends and funding growth $1,600 $160 $2.00 $160 $1,200 $1,400 $140 $140 $1,000 $1.60 $1,200 $120 $120 $800 $1,000 $100 $100 $1.20 $US / Bbl $ / Share $US / Bbl $MM $MM $800 $80 $80 $600 $0.

  92. Slide 92: Capital expenditure and financing objectives

    Capital expenditure and financing objectives 20142015 2017 2016 Capital expenditure and funding 2017 (Standalone) 2018 (Combined) (Combined) Financing objectives $3.0 2017/2018 Capital  ~$3.5 BB • Finance growth ~50/50 debt/equity over the long term • Maintain 'strong' BBB rating with conservative

  93. Slide 93: Pembina's access to capital remains strong

    Pembina's access to capital remains strong Financing considerations Total capital raised  ~$7.6 billion (2013 – 2017 YTD) • ~$7.6 billion raised since 2013 (inclusive of DRIP(1) $3.5 proceeds) $3.1 • ~$3.1 billion of debt raised since 2013 $3.0 $3.0 − ~4.2% average coupon − Tenor of ~19 years $2.5

  94. Slide 94: Leverage comparison across industry

    Leverage comparison across industry Select Canadian and US energy infrastructure peer comparison 7.0x 6.0x 5.0x Debt / EBITDA (2018E) (Combined) 4.0x 3.0x 2.0x 1.0x - BBB A- A- BBB+ A BBB+ BBB+ BBB BBB BBB+ Ba2 NR Pembina continues to employ less leverage than its peers Source: CIBC World Markets, B

  95. Slide 95: Historical balance sheet review

    Historical balance sheet review Historical debt/trailing twelve month ("TTM") Adjusted EBITDA and capital expenditures 4.5x $800 4.0x $700 3.5x $600 3.0x Debt / TTM EBITDA (x) $500 2.5x $MM $400 2.0x $300 1.5x $200 1.0x 0.5x $100 - - Q1 2014 Q2 2014 Q3 2014 Q4 2014 Q1 2015 Q2 2015 Q3 2015 Q4 2015 Q1

  96. Slide 96: Long-dated debt maturity profile

    Long-dated debt maturity profile • Pembina's debt portfolio is more conservative Pembina's current debt maturity profile(1) $600 than its peer group: Senior Debt Convertible Debentures − Weighted average maturity of ~13 years $400 vs. peer group average of ~8 years $MM − Weighted average coupon of ~

  97. Slide 97: Conclusion

    Conclusion Mick Dilger

  98. Slide 98: We continue driving shareholder value

    We continue driving shareholder value (past 10 years) 5% Dividend growth rate(1) 8 - 10% 440% Total shareholder Target adjusted return(2) cash flow per share growth 18% $5.1 BB Average compound annual return(2) in dividends paid since inception(3) Proven long-term track record of shareholder value c

  99. Slide 99: Key deliverables for the next 12 months

    Key deliverables for the next 12 months Maintain exemplary safety and reliability record Deliver ~$6 billion of growth capital projects on time and on budget Successfully close and integrate the Veresen acquisition Deliver promised combined company synergies of $75-$100 MM annually File Jordon Cove

  100. Slide 100: Closing thoughts

    Closing thoughts Proven history of safe and reliable operations while developing enduring relationships with local communities Our long-term strategy remains unchanged and continues to create significant shareholder value The transaction significantly increases Pembina's size, diversification, and e

  101. Slide 101: Pembina Pipeline Corporation

    Contact Us: Pembina Pipeline Corporation Suite 4000, 585 8th Avenue S.W. Calgary, AB T2P 1G1 www.pembina.com investor-relations@pembina.com Toll Free: 1-855-880-7404 Phone: (403) 231-3156

  102. Slide 102: Appendix: Business segment review and update

    Appendix: Business segment review and update

  103. Slide 103: Conventional Pipelines

    Conventional Pipelines 350 field receipt 10K points kilometres of pipelines(1) 12 99% 2016 system unique reliability delivery points (1) Inclusive of expansion projects that are under construction. See "Forward-looking statements and information." 103

  104. Slide 104: Conventional Pipelines

    Conventional Pipelines • Pipeline operational excellence: 99% reliable (2016) ALBERTA • Proximal to prolific geology FORT • Q1 2017 revenue volumes: 691 mbpd (~3% increase from Q1 2016) MCMURRAY DUNVEGAN TAYLOR • 2016 revenue volumes: 650 mbpd (~6% increase from 2015) FORT ST JOHN • Connected to ref

  105. Slide 105: Conventional Pipelines update (2015 – 2017)

    Conventional Pipelines update (2015 – 2017) Operating and financial overview 2016 highlights and 2017 outlook Revenue volumes (mbpd) 2016 Highlights 660 Y-o-Y increase → 6% 650 • Record annual revenue volumes (650 mbpd) 640 97% of 620 614 2016 • Record operating margin ($494 MM) Budget 600 • Another

  106. Slide 106: Oil Sands & Heavy Oil

    Oil Sands & Heavy Oil 6 field receipt points 1.6K kilometres of pipelines 13 99% unique 2016 system delivery reliability points 106

  107. Slide 107: Oil Sands & Heavy Oil

    Oil Sands & Heavy Oil Syncrude Pipeline • Operational excellence Horizon Pipeline Cheecham Lateral − ~99% reliable (2016) Nipisi Pipeline Mitsue Pipeline Peace Pipeline • Diverse connectivity to various industry hubs for crude oil and condensate • Contracts are long-life with high credit worthy coun

  108. Slide 108: Oil Sands & Heavy Oil update (2015 – 2017)

    Oil Sands & Heavy Oil update (2015 – 2017) Operating and financial overview 2016 highlights + 2017 outlook Contracted capacity (mbpd) 2016 Highlights 1,000 975 • Contracted capacity increased to 975 mbpd in 2016 950 900 880 • Operating margin ($140 MM) remains steady 850 • Another year of safe and >

  109. Slide 109: Crude Oil Midstream

    Crude Oil Midstream 21 inbound pipeline 1.2 connections MMbpd pipeline 13 connectivity 1.3 MMbbls total outbound storage pipeline connections capacity(1) (1) Inclusive of expansion projects that are under construction. See "Forward-looking statements and information." 109

  110. Slide 110: Crude Oil Midstream

    Crude Oil Midstream • Develop and provide terminal, hub and storage ALBERTA services to support the energy industry FORT • ~900 mbbls of above ground crude oil and MCMURRAY TAYLOR condensate storage capacity • Access to approximately 1.2 MMbpd of crude oil and condensate supply through connected pip

  111. Slide 111: Crude Oil Midstream update (2015 – 2017)

    Crude Oil Midstream update (2015 – 2017) Operating and financial overview 2016 highlights + 2017 outlook Operating margin ($MM) 2016 Highlights $60 101% of 2015 Budget $125 • Operating margin ($162 MM) remains relatively strong despite tighter price $100 differentials $US / Bbl $40 $C MM $75 $50 • A

  112. Slide 112: Gas Services

    Gas Services 1.8 Bcf/d capacity(1) 500+ Kilometres gathering 4 capacity 92% operating 2016 complexes reliability (1) Inclusive of expansion projects that are under construction. See "Forward-looking statements and information." 112

  113. Slide 113: Gas Services

    Gas Services • Positioned in active and emerging NGL-rich plays ALBERTA • Provide gas gathering, compression and shallow/deep cut processing services • 618 MMcf/d shallow cut and 1,099 MMcf/d deep cut gas processing Fort McMurray capacity • Q1 2017 average revenue volumes: ‒ 1,024 MMcf/d (52% increa

  114. Slide 114: Gas Services update (2015 – 2017)

    Gas Services update (2015 – 2017) Operating and financial overview 2016 highlights + 2017 outlook Revenue volumes (MMcf/d) 2016 Highlights 1,000 Y-o-Y increase → 27% 836 • Record annual revenue volumes (836 MMcf/d) + operating margin ($195 MM) + 800 656 102% of 600 another year of safe operations ac

  115. Slide 115: Saturn Complex

    Saturn Complex Asset Highlights • 400 MMcf/d (net) of deep cut processing capacity with liquids production of ~26 mbpd − 2x 200 MMcf/d processing facilities • Saturn I was completed in 2013, with Saturn II completed in 2015 • Ortloff proprietary process achieves high ethane recoveries while managing

  116. Slide 116: Resthaven Complex

    Resthaven Complex Asset Highlights • 300 MMcf/d (gross) of deep cut processing capacity with liquids production of ~25 mbpd (C2+/C5+) − Pembina has ~71% ownership in the facility • Facility was completed in 2014 • Raw inlet gas to deep cut facility • Expansion in 2015/2016 extended the reach of the

  117. Slide 117: Cutbank Complex

    Cutbank Complex Asset Highlights • 773 MMcf/d (net) of shallow and deep cut processing capacity with liquids production of ~23 mbpd − 6 shallow cut trains (568 MMcf/d) − 1 deep cut train (205 MMcf/d) • Key members of Pembina's management team have a long history with the complex • Interconnections w

  118. Slide 118: NGL Midstream

    NGL Midstream 200 mbpd + RFS fractionation(1) 2.1 Bcf/d Empress 8.3 capacity 3k MMbbls finished rail cars(1) product storage (1) Inclusive of expansion projects that are under construction. See "Forward-looking statements and information." 118

  119. Slide 119: NGL Midstream

    NGL Midstream Gas Processing Plant Fractionator Redwater West: Midstream Storage Facility Truck Terminal • 155 mbpd of NGL fractionation capacity and 8.3 MMbbls of Rail Terminal Pembina Pipelines finished product cavern storage Third Party Pipelines • Industry-leading rail-based terminal (largest NG

  120. Slide 120: NGL Midstream update (2015 – 2017)

    NGL Midstream update (2015 – 2017) Operating and financial overview 2016 highlights + 2017 outlook NGL sales volumes (mbpd) 2016 Highlights 150 143 • Another year of safe, reliable operations across all facilities 140 97% of Y-o-Y 130 2016 116 change • Announced proposed PDH/PP Facility in Alberta's

  121. Slide 121: Redwater is Canada's premier fractionation complex

    Redwater is Canada's premier fractionation complex Rail Loading RFS I RFS II RFS III Operating & Under Construction Operating In service Under Construction Expanding facility to handle 250+ cars per 73,000 bpd C2+ fractionator ~73,000 bpd C2+ fractionator 55,000 bpd C3+ fractionator day. Ability to

  122. Slide 122: Empress Complex

    Empress Complex Asset Highlights • Pembina owns ~2.1 Bcf/d of extraction capacity across the Empress Complex − Pembina Facility  (77% ownership of 1.2 Bcf/d) − Plains Facility  (33% ownership of 2.7 Bcf/d) − Spectra Facility (12% ownership of 2.4 Bcf/d) • Well connected to major pipelines includi

  123. Slide 123: Corunna Facility

    Corunna Facility Asset Highlights • Pembina owned and operated storage and terminalling facility • 5.3 MMbbls of existing cavern storage and product drying facilities • 20 mbpd of local fractionation capacity through partial ownership of Plains' fractionation facility • LPG truck and rail terminalli

  124. Slide 124: Younger Facility

    Younger Facility Asset Highlights • 750 MMcf/day (gross) high efficiency NGL extraction straddle plant − 43% Pembina ownership − Large captive gathering footprint − Well connected to local gas production • 18 mbpd NGL Fractionation facility (Joint Venture) • Interconnected to Pembina's conventional

  125. Slide 125: Commodity sensitivities

    Commodity sensitivities

  126. Slide 126: Sensitivities (2017 EBITDA C$MM)

    Sensitivities (2017 EBITDA C$MM) (pre-combination) Conventional Pipelines Key variable Uncontracted volumes Volume ± 10,000 bpd ±$10 Gas Services Key variable Uncontracted volumes Volume ± 10 mmcf/d ±$2 NGL Midstream (1,2) Key variable AECO ± $0.25 CAD/gj ±$10 Propane ± $0.10 US/usg ±$40 Butane ± $0

  127. Slide 127: Non-GAAP measures

    Non-GAAP measures This presentation uses certain terms that are not defined by GAAP but are used by management of Pembina to evaluate Pembina's performance. Non-GAAP and additional GAAP financial measures do not have a standardized meaning prescribed by GAAP and are therefore unlikely to be comparab