TransGlobe Energy Corporation

TransGlobe Energy — Q3 2014 Earnings Presentation

20 slides from TransGlobe Energy's earnings presentation, Nov 12, 2014

  1. Slide 1: Q3 2014 Results Conference Call

    Q3 2014 RESULTS CONFERENCE CALL NOVEMBER 12, 2014

  2. Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT This presentation may include certain statements that may be deemed to be “forward-looking statements” within the meaning of the U.S. Private Securities Litigation Reform Act of 1995. Such statements relate to possible future events. All statements other than statements of histo

  3. Slide 3: Q3 2014 Financial Highlights

    Q3 2014 FINANCIAL HIGHLIGHTS Funds flow of $28.9MM* ($0.35/share) Earnings of $19.2MM* ($0.18/share) Spent $25.5MM on Exploration and Development $77.9MM in cash and cash equivalents Positive working capital of $269MM $18.9MM collected from EGPC Dividend of $0.05 per share was paid on September 30th

  4. Slide 4: Oil Price Sensitivity 2014 YTD

    OIL PRICE SENSITIVITY 2014 YTD PSCs are resilient in a decreasing price environment: • Notionally, if Dated Brent had been $80 YTD: • Funds Flow would have been ~$68 million, versus ~$53 Realized Price million or $15 million less under a fixed government take * $93.36 Notional Realized Price ~$70.00

  5. Slide 5: EGPC Accounts Receivables

    EGPC ACCOUNTS RECEIVABLES AR outstanding vs Months outstanding • Total EGPC collections up to end of Q3 $250,000 12 were $93.4 million • Two Liftings scheduled for Q4 $200,000 10 • ½ cargo was lifted on October 27th ~$20 Million 8 • Full cargo to be lifted on $150,000 November 18th estimating ~$37 6

  6. Slide 6: Q3 Sales

    Q3 SALES Sales (Bopd) Q3 October West Gharib 9,092 8,421 West Bakr 5,148 6,114 East Ghazalat 658 581 Egypt Total 14,898 15,116 Yemen 234 223 Sales Total 15,132 15,339 Production 15,109 6

  7. Slide 7: Current Daily Production

    CURRENT DAILY PRODUCTION 25,000 20,000 PCP Failures/Declines Replacement Pumps 15,000 Oil Sales (bopd) 10,000 Block 32 Block S-1 5,000 East Ghazalat Reduced West Bakr Rotation Speeds West Gharib 0 Nov-13 Dec-13 Jan-14 Feb-14Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Q3 – 15,109 B

  8. Slide 8: Q4 Guidance

    Q4 GUIDANCE • Q1 + Q2 + Q3 ~ 16.4 MBopd • Q4 ~ 15.0 MBopd Production • West Gharib PCP pump replacements • West Bakr ~6.0 MBopd • Q4 at 15.0 Mbopd and $82.5 Brent • $122.5MM ($1.63/share) 2014 Funds Flow • $113.2MM excluding $9.3MM Caracal termination fee • $3.5MM ($0.05/share) Funds Flow sensitivit

  9. Slide 9: Egypt Assets: Eastern Desert

    EGYPT ASSETS: EASTERN DESERT 9

  10. Slide 10: West Gharib: 100% WI - Operated

    WEST GHARIB: 100% WI - OPERATED 2014 Plan • 9 wells • Waterflood optimization • Hoshia ASP flood simulation/lab work • Facility centralization and upgrades Q3 • 9,091 Bopd • Drilled 2 oil wells at Hana & Hana West YTD • Drilled 9 wells • 8 oil wells, 1 D&A October Production • 8,421 Bopd 10

  11. Slide 11: NW Gharib: 100% WI - Operated

    NW GHARIB: 100% WI - OPERATED YTD – 10 Wells Drilled 18 16 3 2 17 6 • 3 oil discoveries  #1, #3 & #5 15 11 13 12 9 7 14 • 1 successful appraisal 8 1 well - #16 4 • 5 D&A - #4, #6, #7, #10 & #17 5 • 1 suspended at #2  40% success rate overall  Three oil developments progressing toward first 10 pro

  12. Slide 12: West Bakr: 100% WI - Operated

    WEST BAKR: 100% WI - OPERATED 2014 Plan • 17 wells • Water flood optimization H • Facility upgrades and optimization Q3 M • 5,148 Bopd K • Drilled 3 oil wells YTD • Drilled 11 wells (9 oil, 1 injector) • K field, 3 oil wells, 1 abandoned • H field, 5 oil wells, 1 injector well • M field, 1 oil well

  13. Slide 13: Eastern Desert: 100% WI - Operated

    EASTERN DESERT: 100% WI - OPERATED Executing large seismic program for 2014/15 in NW Gharib Egypt • Total program ~ 1,400 km²  3-D & 300 km 2-D • Eastern Desert ~ 1,000 km²  3-D & 300 km 2-D • Western Desert ~ 400 km² 3-D NW Gharib • 3-D acquisition completed, processing underway • Concession area

  14. Slide 14: SE Gharib: 3-D Seismic Acquisition

    SE GHARIB: 3-D SEISMIC ACQUISITON 14

  15. Slide 15: Egypt Assets: Western Desert

    EGYPT ASSETS: WESTERN DESERT * *Pending Ratification 15

  16. Slide 16: South Alamein: 100% WI - Operated

    SOUTH ALAMEIN: 100% WI - OPERATED Acquired in 2012 2014 Plan • Contingent on Boraq access • Boraq #2 tested at 1,700 Bopd* • Exploration period  Clock stopped  20+ months from access approval  Retained 800 km 2 *The primary Cretaceous zone tested at a rate of 1,323 bopd of 34 API oil with no wate

  17. Slide 17: East Ghazalat: 50% WI - Non-Operated

    EAST GHAZALAT: 50% WI - NON-OPERATED 2014 Plan • 5 wells North Dabaa Dev Lease Safwa Field • N Dabaa Dev Q3 • 658 Bopd to TG • N. Dabaa appraisal well YTD • Drilled 4 wells • 2 Safwa oil wells • 1 N.Dabaa #2 tested Gas/Condensate well • 1 D&A Next Well • Safwa Horizontal Dev well, currently drilling

  18. Slide 18: NW Sitra & S. Ghazalat: 100% WI - Operated

    NW SITRA & S. GHAZALAT: 100% WI - OPERATED S. Ghazalat • Awarded in 2013 • 2015 Plan: 3-D seismic • 400 km2 3-D seismic planned S. Ghazalat N.W. Sitra* NW Sitra* • Awarded in 2014 • Waiting on ratification Total 2015 3-D Seismic • Combined Concession area of 3,829 km2 (945,500 acres) 18

  19. Slide 19: Q&A

    Q&A 19

  20. Slide 20: Q3 2014 Results Conference Call

    Q3 2014 RESULTS CONFERENCE CALL NOVEMBER 12, 2014