Companhia Siderurgica Nacional · BMFBOVESPA:CSNA3
Companhia Siderurgica Nacional — National Steel — Corporate Update (May 2008)
32 slides from Companhia Siderurgica Nacional's corporate update, May 8, 2008

Slide 1: Companhia Siderúrgica Nacional

Slide 2: The Steel Industry

Slide 3: Mining

Slide 4: Cement

Slide 5: Logistics and Infrastructure
and Infrastructure

Slide 6: CSN Logistics Platform in Itaguaí
“CSN Logistics ‘Platform in Itaguai

Slide 7

Slide 8

Slide 9

Slide 10: CSN Logistics Platform in Itaguaí
eH CSN Logistics Platform Gcsn in Itaguai Expansion of Sepetiba Tecon Expansion of Tecar _Logistics Support Center jerth 301 Equalization + Berths 103/203 ‘Improvement of Berths 1 Stockyard 302/303 Lago da Pedra Private Port

Slide 11: World Transportation of Containers
100 T T 2001 | 2002! 2003! 200+ World Transportation of Containers [Trend of International Trade [World GDP 2005 2008! 2007! 2008! 2009! 201

Slide 12: Brazil Transportation of Containers
Brazil Transportation of Containers ‘Trend of International Trade Brazil GDP

Slide 13: CSN Logistics Platform in Itaguaí
CSN Logistics Platform in Itaguai

Slide 14: CSN Strategic Location
CSN Strategic Location cS ¥ Located in Itaguaj (RI State), in Sepetiba Bay ¥_ More than 60% of Brazilian GDP within an area of 300 miles ¥ No conflict with major urban centers ¥ Deep water area ¥_ Reduction in the number of transfers (container vessels) _é

Slide 15

Slide 16: Expansion of Sepetiba Tecon
nay CSN Logistics Platform CSN in Itaguai Expansion of SepetibaTecon __.

Slide 17: Characteristics
Characteristics Length of quays: 810 m • 2 berths in linked quays: 540m • 1 berth with access bridge: 270m Draught: 14,5 m Back storage area: 400 thousand sqm Present Capacity 600 thousand TEUs / year 2 Mtpy General Cargo / Steel Products

Slide 18: Characteristics
Characteristics •Length of continuous quay: 810 m •Draught: 14,5 m Investment US$ 63 million Quays: US$ 38 million Equipment: US$ 25 million Capacity 6 Mtpy General Cargo / Steel Products

Slide 19: Characteristics
Characteristics •Length of continuous quay: 1,070 m •Draught: 14,5 m •Enables 2 large vessels to be served simultaneously (8,000 TEUs) •Back storage area: + 50 thousand sqm Investment US$ 103 million Quays/ Back storage area: US$ 47 million Equipment: US$ 56 million Capacity 1,300 thousand TEUs/year

Slide 20: Expansion of Tecar
ey CSN Logistics Platform CSN in Itaguai Expansion of Tecar

Slide 21: Characteristics
Characteristics •Pier: + 424 m • Structurally prepared for vessels VLOC - 360,000 DWT •Back storage area: + 260 thousand sqm •Draught: 18.5 m Investment US$ 790 million * Capacity 100 Mtpy Iron Ore 8 Mtpy Coal / Other Products

Slide 22: Characteristics
Characteristics •Pier: + 424 m • Structurally prepared for vessels VLOC - 360,000 DWT •Back storage area: + 260 thousand sqm •Draught: 18.5 m Investment US$ 790 million * Capacity 100 Mtpy Iron Ore 8 Mtpy Coal / Other Products

Slide 23: Characteristics
Characteristics •Pier: + 424 m • Structurally prepared for vessels VLOC - 360,000 DWT •Back storage area: + 260 thousand sqm •Draught: 18.5 m Investment US$ 790 million * Capacity 100 Mtpy Iron Ore 8 Mtpy Coal / Other Products

Slide 24: Logistics Support Center
ney CSN Logistics Platform CSN in Itaguai Logistics Support Center =

Slide 25: Characteristics
Characteristics •Depot and storage of containers •Dedicated warehouses for: • Steel Products • Coffee • Reefer • Cotton • Sugar • Chemicals •Distribution centers •Vehicles and parts •Auxiliary services •Modular project (built to suit) Investment US$ 202 million Capacity 900 thousand TEUs/year

Slide 26: Characteristics
Characteristics •Depot and storage of containers •Dedicated warehouses for: • Steel Products • Coffee • Reefer • Cotton • Sugar • Chemicals •Distribution centers •Vehicles and parts •Auxiliary services •Modular project (built to suit) Investment US$ 202 million Capacity 900 thousand TEUs/year

Slide 27: Characteristics
Characteristics •Depot and storage of containers •Dedicated warehouses for: • Steel Products • Coffee • Reefer • Cotton • Sugar • Chemicals •Distribution centers •Vehicles and parts •Auxiliary services •Modular project (built to suit) Investment US$ 202 million Capacity 900 thousand TEUs/year

Slide 28: Lago da Pedra Private Port
men CSN Logistics Platform CSN in Itaguai Lago da Pedra Private Port =5

Slide 29: Characteristics
Characteristics •Private Cargo: • Iron Ore • Coal / Other Materials • Steel Products • Píer 1: • General Cargo / Steel Products • Containers • Píer 2: • Coal / Others • Iron Ore Investment US$ 791 million Capacity 60 Mtpy Iron Ore 12 Mtpy Coal / Other 1 thousand TEUs/year 11 Mtpy General Cargo / Ste

Slide 30: Characteristics
Characteristics •Stocking areas: 1.2 million sqm Iron Ore: 630 thousand sqm Coal/ other: 300 thousand sqm Containers: 140 thousand sqm General cargo: 120 thousand sqm •Support areas: • Gate • Corporate building • Warehouse • Administrative building • Cafeteria / Lockers Investment US$ 283 million Ca

Slide 31: Capacities
Capacities Total Iron Ore (Mtpy) Coal/Coke (Mtpy) Containers (thousand TEUs / year) 2.300 General Cargo/Steel Products (Mtpy) CAPEX US$ mi Total Expansion of Sepetiba Tecon Expansion of Tecar 790 * Logistics Support Center Lago da Pedra Private Port Private Port Storage Area Total 2.231 *US$ 236 mil

Slide 32: Signature
SIGNATURE Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. Date: May 07, 2008 COMPANHIA SIDERÚRGICA NACIONAL By: / S / Benjamin Steinbruch Benjamin Steinbruch Chie
Source: SEC EDGAR · 6-K filed May 8, 2008
More decks from Companhia Siderurgica Nacional
Q3 2026 Earnings Presentation25 slides · Nov 13, 2026
National Steel — Q3 2026 Earnings Presentation29 slides · Nov 13, 2026
Q2 2026 Earnings Presentation27 slides · Aug 13, 2026
National Steel — Q1 2026 Earnings Presentation29 slides · May 14, 2026
Q1 2026 Earnings Presentation24 slides · May 14, 2026
National Steel — Q4 2025 Earnings Presentation31 slides · Mar 12, 2026