Vrx Silica Ltd. · ASX:VRX

Vrx Silica — Ventnor Resources — Investor Presentation (July 2011)

34 slides from Vrx Silica's investor presentation, Jul 12, 2011

  1. Slide 1: Ventnor Resources Limited July 2011

    For personal use only ACN 142 014 873 July 2011

  2. Slide 2: Disclaimer

    Disclaimer For personal use only This projects summary was prepared with due care and attention and is current at the date of the presentation. The summary is not an offer or recommendation to purchase or subscribe for securities in Ventnor Resources Limited or to retain any securities currently hel

  3. Slide 3: Exploration Projects

    Exploration Projects For personal use only • Thaduna/Green Dragon Copper Project, WA • Warrawanda/Nickel Hills Nickel Project, WA • Georgina Basin IOCG Project, QLD

  4. Slide 4: Project Location Map

    Project Location Map ® 1000 kilometres,

  5. Slide 5: Thaduna/Green Dragon

    Thaduna/Green Dragon For personal use only • 175 Kms Nth Meekatharra • 4PLs covering 604 Ha 2 ELs covering 17 blocks • Sandfire Resources De Grussa 40km west • Significant first pass drilling campaign results

  6. Slide 6: For personal use only

    V T \ nerve 119°30E N yh y ) As f lan -25°00'S—%, 7 | -25°00'S 2 Y | = Uf /} ‘ i Marymia Migun HS] V, Gold Mine \ iL ; {f Plutonic (2, SS Gold Mine ® ® Labouchere S Horseshoe Lights &) Gold Mine ®@ @ Gold Mine Fortnum ~ 2) oan” Bnenetee! caro / é i i} Ss ® Gold Mine f vecrussa @ \ 4 Project \ Bryah

  7. Slide 7: Regional geological map of the Thaduna-Degrussa area

    Regional geological map of the Thaduna ~Deprussa erea 2 = © @ D =) © ‘= S Q = @ a. = O LL

  8. Slide 8: Green Dragon Project

    For personal use only 760000mE Ventnor Resources Green Dragon Project 10 kilometres VRE

  9. Slide 9: Thaduna

    Thaduna • Historic mining and production completed For personal use only 1971 • Prior production 30,290 t @ 8.7% Cu • Historic drilling 9m @ 5.22% Cu from 80m • First pass includes 16m @ 3.47% Cu from 80m; 4m @ 4.37% Cu from 87m; 7m @ 5.70% Cu from 75m

  10. Slide 10: Thaduna Project, Regional Geology, Thaduna Open Pit Area

    UPPER GREYWACKE UNIT Solid outcrop Concealed outcrop UPPER SILTSTONE UNIT Solid outcrop I Concealed outcrop LOWER GREYWACKE UNIT Solid outcrop Coarse grained beds Concealed outcrop Lode | Disseminated zone Geological boundary- accurate Geological Boundary-concealed ‘Anticline axis with plunge ‘Synol

  11. Slide 11: Ventnor Resources Limited

    Ventnor Resources Limited

  12. Slide 12: Thaduna Project proposed drilling 2011

    For personal use only JTHRCT6 Previous drill hole with downhole mineralised intercepts projected to surface Proposed Drilling 2011 Thaduna Pit S. ra PSS VENTNOR RESOURCES LIMITED Thaduna Project June 2011 VRE

  13. Slide 13: Green Dragon

    Green Dragon For personal use only • Prior production 9,100 t @ 5.2% Cu • Historic drilling 10m @ 5.4% Cu from 97m • First pass drilling 3m @ 5.16% Cu from 64m, 5m @ 7.19% Cu from 44m, 2m @ 3.15% Cu from 79m, 5m @ 2.25% Cu from 85m

  14. Slide 14: Ventnor Resources Limited

    Ventnor Resources Limited

  15. Slide 15: Green Dragon Project Drillhole Location Plan

    774800mE 75000mE & 200 metres 7181200mN 7181000mN Green a Ne \oss \ vil VENTNOR RESOURCES LIMITED ; Green Dragon Project mincraliged intorcopts projected: Drillhole Location Plan to surface with 7 Planned Drillhole Locations Proposed Drilling 2011 June 2011 VRC

  16. Slide 16: Warrawanda

    Warrawanda For personal use only • 60 kms Sth of Newman • 10 Pl’s 1202 Ha; 1 EL 17 km2 • Previous shallow exploration • EM survey April 2011 targets selected • Drilling to commence July 2011

  17. Slide 17: For personal use only

    ey, PSL ( (ame mens —~ A) J) Zh omen = A, i) A> cd) iA mK is

  18. Slide 18: For personal use only

    For personal use only

  19. Slide 19: For personal use only

    Chrysophase — Pyrite + Cu ——» Chalcopyrite Pyrrhotite + Ni —-» Pentlandite Mag Sensitivity -

  20. Slide 20: Warrawanda TMI

    For personal use only Warrawanda TMI

  21. Slide 21: For personal use only

    For personal use only

  22. Slide 22: Warrawanda Drill Targets

    Warrawanda Drill Targets For personal use only

  23. Slide 23: Nickel Hills

    Nickel Hills For personal use only • 6 km Nth of Warrawanda • 2 EL’s 82km2 • Previous exploration occurrences of copper and nickel sulphides • EM and magnetic survey identified a magnetic anomaly associated with a Banded Iron Formation with a strike length of 7.5 kilometres

  24. Slide 24: For personal use only

    For personal use only Mt Whaleback Iron Ore Mine ) ® Newman Jimblebar Iron ° 12015

  25. Slide 25: For personal use only

    5} zu 2 £ S go 3 5 3 o 4 6 2 £ G =

  26. Slide 26: Nickel Hills TMI

    For personal use only Nickel Hills TMI

  27. Slide 27: Georgina Basin

    Georgina Basin For personal use only • 200 km SW Mt Isa • 8 EPM applications; 2034km2 • Mt Isa inlier well endowed with IOCG and massive sulphide deposits • Coincident magnetic and gravity anomalies • Surface phosphates and lead, zinc and silver occurrences in limestone

  28. Slide 28: Georgina Basin regional mineral deposits map

    MacArthur River Mines (current & Past) Resource Mineralised system @ ° ie) ™ Domain boundary «xm Buried Domain boundary QUEENSLAND 0 100 200km —_—————————— Tig) Horizontal Scale \ @ Ernest Henry (Cu, Au) Aa, Ai iY u) Mary Kathleen (U) @ Eloise (Cu, Au) O Mt Elliot (Cu, Au) 1X “@ Cannington (Pb, Zn,

  29. Slide 29: For personal use only

    For personal use only

  30. Slide 30: Georgina Basin Exploration

    Georgina Basin Exploration For personal use only • Collect higher resolution gravity, magnetic and radiometric data • Obtain a 3-D inversion of the gravity, magnetic and radiometric data from the survey and analyse for anomalies in 2011 • Follow up with targeted deep diamond orientation drilling in

  31. Slide 31: Board

    • Paul Boyatzis (Chairman) Board For personal use only 25 years experience in investment and equity markets Chairman of a number of ASX listed companies Member of the Australian Institute of Company Directors • Bruce Maluish (Managing Director) 30 years experience in set-up, management and developme

  32. Slide 32: Capital Structure

    Capital Structure For personal use only Issued Shares Options Total 50.0 M 23.2 M Cash on hand $4.5 M Market Cap @ 23c $11.5 M 10.6M Seed shares escrowed 24 months 4.3M Vendor shares escrowed 12 months 1.5M Vendor 20c options escrowed 12 months 20.0M Remaining 25c options escrowed 24 months

  33. Slide 33: Competent Persons Statement

    Competent Persons Statement For personal use only The information in this presentation that relates to Exploration Results is based on information compiled by Mr Stephen Denn who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM). Mr Denn is a contractor to Ventnor Resource

  34. Slide 34: Contact

    Contact For personal use only Bruce Maluish Managing Director Email: brucem@ventnorresources.com.au Mob: 0418 940 417 Ph: 08 9226 3780 Lvl 1, 6 Thelma Street West Perth WA 6005

Ventnor Resources — Investor Presentation (July 2011) on 6ix