  1. Slide 1: 2014 Annual General Meeting

    RAISE PRODUCTION? 2014 Annual General Meeting October 2, 2014

  2. Slide 2: Forward-looking statements disclaimer

    This written and accompanying oral presentation is being supplied to you solely for your information and may not be reproduced or forwarded to any other person, or published (in whole or in part) for any other purpose. This written and accompanying oral presentation contains certain forward-looking

  3. Slide 3: Key Milestones Achieved

    Key Milestones Achieved During the last year Raise made some material strides forward: • System Deployment / Retrieval: – 5 deployments and 3 retrievals of horizontal wellbore production system (“System”): • No running/retrieving issues experienced in close tolerance wellbores • Multiple pumps deplo

  4. Slide 4: Support For System Theory

    Support For System Theory Important information gathered from field deployments: • Demonstrated higher fluid levels • Higher shut in pressures • Visible water production • Encouraging short term intermittent flow rates • Quicker recovery of “load fluid” at higher than IP rates 4

  5. Slide 5: Challenges / Working on Solution

    Challenges Plan to be commercial in 2Q 2014 was delayed because of a component issue: • Last 4 System deployments experienced identical malfunctions • 3rd party component issue identified: – Path to identifying malfunctioning component was involved and required multiple deployments. Although time co

  6. Slide 6: New IP Added to Portfolio

    New IP Added to Portfolio • “Necessity is the mother of invention”: – Challenges experienced during first System deployment drove Raise to innovate 80 year old technology • Raise vertical lift solution: – Raise patent pending components designed to: • Function at high angles • Improve pump stroke ef

  7. Slide 7: Steps to Commercialization

    Steps to Commercialization • Hires : – Manufacturing Manager – Purchasing Agent – Assembly / Deployment Supervisor • Inventory control system • Lean manufacturing processes • Qualification of 3rd party machine shops and part vendors 7

  8. Slide 8: Upcoming priorities and milestones

    1. Overcome “Part Challenge” – Anticipate Oct/Nov 2014 2. Re-Deploy System in Wellbore #2 – Target Dec 2014 3. Commercialize Vertical Lift Business – Ongoing 4. Design & Testing of System Version 2.0 – Work already underway – Electric assisted activation – Higher cycle rates and more pumps – Targeti

  9. Slide 9: Contact details

    2620, 58th Ave SE Calgary, AB T2C 1G5 403-699-7675 raiseproduction.com Scott Riddell, VP Business Development Eric Laing, CEO Susan Scullion, CFO sriddell@raiseproduction.com elaing@raiseproduction.com sscullion@raiseproduction.com 9