Slide 1: Presentation to Investors
ABN 79 106 879 690 4 July 2011 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (32 pages by email) Dear Madam, Presentation to Investors I attached a PowerPoint presentation which is being delivered to investors. For further information, contact Grant Kensington, Managing Director
Slide 2: Augur Resources Ltd - Global Mines Presentation
AUGUR RESOURCES LTD ABN 79 106 879 690 GLOBAL MINES PRESENTATION July 2011 Justin Werner –Director ASX: AUK www.augur.com.au
Slide 3: Disclaimer
Disclaimer This material contains certain forecasts and forward‐looking information, including regarding possible or assumed future performance, costs, production levels or rates, prices, resources, or potential growth of Augur Resources Ltd (Augur), industry growth, or other trend projections. Such
Slide 4: Company Snapshot
Company Snapshot Directors Share Price – 52 Weeks Chairman Norman Seckold Managing Director Grant Kensington Director Peter Nightingale Director Justin Werner Capital Major Shareholders 177.2 Million Shares on Issue Permgold Pty Ltd 29.13% 2 Million Employee Options Rosignol Pty Ltd 6.77% 7 Million
Slide 5: Peer Group Comparison
Peer Group Comparison Company Major Projects Resource Gold Market Price 12 Month Listing oz Capital Price Exchange (M) Aus$ Range G Resources Martabe 138.6Mt 6.49 1019.3 0.57 Hong Kong Tujuh Bukit (80%) 990Mt @ 0.4% Cu 14.32 921.5 1.79 0.46‐2.40 ASX Intrepid and 0.45 g/t Au Archipelago Toka Tindung
Slide 6: Strategy
Strategy Commodity Focus: Gold ‐ Copper ‐ Nickel Area of Focus: Indonesia Strategy: Explore and rapidly develop advanced projects with shallow, mineable resources in areas with favourable infrastructure. ASX: AUK www.augur.com.au
Slide 7: Project Areas - Indonesia
Project Areas ‐ Indonesia ASX: AUK www.augur.com.au
Slide 8: Investment Highlights
Investment Highlights Advanced Projects (Rapid Development) • Wonogiri: 2,000m previous drilling; AUK 2,060m (10 holes) in 3 months (second rig mobilised) • Jampang: 32,000m previous drilling; AUK 16,297m (140 holes) in a little over a year. Excellent Logistics • Wonogiri: 1hr flight from Jakarta to
Slide 9: Wonogiri Project
WONOGIRI PROJECT ABN 79 106 879 690 GLOBAL MINES PRESENTATION July 2011 ASX: AUK www.augur.com.au
Slide 10: Wonogiri – Project Highlights
Wonogiri – Project Highlights • Advanced Exploration Project ‐ extensive database of recent work (2010) including: • geological mapping, geochemical sampling, ground magnetics and diamond drilling (5 holes) • Previous drilling (PT Oxindo) intercepted significant gold zones including: • Hole DHH1 ‐ 4
Slide 11: Wonogiri – Project Highlights
Wonogiri – Project Highlights • Rock chip sampling by Augur has confirmed the presence of a large scale gold and copper system. • 18 samples from 52 rock chip samples returning greater than 1 g/t Au with six samples returning greater than 7 g/t Au. • Maximum copper results of 2.89% Cu. • Surface roc
Slide 12: Wonogiri - Excellent Location
Wonogiri ‐ Excellent Location Erosion of Oligocene volcanic centres has resulting in the exposure of some near surface significant porphyry and epithermal systems in the Java to Sumbawa region ASX: AUK www.augur.com.au
Slide 13: Wonogiri – Cross Section
Wonogiri – Cross Section Shallow vertical gold-copper porphyry body at Randu Kuning ASX: AUK www.augur.com.au
Slide 14: Wonogiri – Cross Section
Wonogiri – Cross Section Recent drilling indicates widening with depth Cross section holes WDD003 and WDD007. ASX: AUK The mineralisation remains open in hole WDD007. www.augur.com.au
Slide 15: Wonogiri – Cross Section
Wonogiri – Cross Section Recent drilling indicates widening with depth Cross section holes WDD002 , WDD004 , WDD006 and WDD008. ASX: AUK www.augur.com.au
Slide 16: Wonogiri - Randu Kuning Porphyry
Wonogiri ‐ Randu Kuning Porphyry Wide zones of gold and copper mineralisation encountered 59.1m @ 1.31 g/t Au 48.0 m @ 1.45 g/t Au 60.0 m @ 0.85 g/t Au 105.5 m @ 0.95 g/t Au 215.0 m @ 0.48 g/t Au WDD008 218.5m at 0.97 g/t Au and 0.20% Cu ASX: AUK www.augur.com.au
Slide 17: Wonogiri - Ground Magnetics
Wonogiri ‐ Ground Magnetics Bukit Bukit Tumbu Piti Randu Kuning Deeper magnetic Gawe New target high (not tested) Bukit Gede Wide zone of quartz veining and Geblak Kepil stockworking New targets Jangglengan ASX: AUK www.augur.com.au
Slide 18: Wonogiri - Rockchips
Wonogiri ‐ Rockchips Epithermal Target Porphyr y Target Epithermal Target Epithermal Targets ASX: AUK www.augur.com.au
Slide 19: Jampang Project
JAMPANG PROJECT ABN 79 106 879 690 GLOBAL MINES PRESENTATION July 2011 ASX: AUK www.augur.com.au
Slide 20: Jampang - Location
Jampang ‐ Location ASX: AUK www.augur.com.au
Slide 21: Jampang Project - Highlights
Jampang Project ‐ Highlights • Advanced exploration project Mispec (Canadian listed company) undertook a significant drill program (+32,000m; 246 holes) between 1996‐1998 and came up with an internal resource of 660,000oz, all zones were still open and a number of anomalies were untested (pulled out
Slide 22: Jampang Project - Highlights
Jampang Project ‐ Highlights • Wide Intersections up to 40m width from shallow depths such as JADD40: • 43.0 metres at 1.62g/t gold and 0.84% copper from just 27m • The Lipi zone remains open to the North, South and at depth, current drilling over 600m in strike length, potential to increase to over
Slide 23: Jampang – Results
Jampang – Results HOLE From (m) To (m) Interval (m) Gold (g/t) Silver (g/t) Copper % JADD2 63 66 3 5.99 2.52 79 86 7 3.09 16.1 0.25 JADD8 73 83 10 7.47 6.4 JADD10 28.5 64.6 36 1.74 8.0 0.89 JADD11 71.5 91.7 20.2 1.43 5.2 0.21 JADD14 63.2 75.5 12.3 3.70 12.7 0.19 104.3 107.3 3 14.35 8.9 0.59 JADD19 1
Slide 24: Jampang – Geophysical Targets
Jampang – Geophysical Targets Puteran Simpang (includes from historical drilling) JRC183 133m @ 1.85 g/t Au JRC219 118m @ 3.16 g/t Au JRC91 28m @ 1.44 g/t Au Rock chip 3.5 g/t gold Lipi North Augur discovery 10m at 7.47 g/t Lipi East gold Only 1 hole drilled 3m @ 1.02 g/t gold Lipi West 8m @ 5.6 g/t
Slide 25: Jampang – Additional Targets
Jampang – Additional Targets • Gold mineralisation at Jampang is reported to be coincidental with geophysical anomalies. • Regional drill testing of geophysical targets underway. • Lipi West best results to date: • 14m at 1.18 g/t gold and 0.98% copper • 8m at 5.6 g/t gold • 6m at 3.75 g/t gold • No
Slide 26: Jampang – Cross Section
Jampang – Cross Section ASX: AUK www.augur.com.au
Slide 27: JAMPANG – Additional Targets
JAMPANG – Additional Targets ASX: AUK www.augur.com.au
Slide 28: Jampang – Deposit Area
Jampang – Deposit Area Near Surface (zones <10m from surface) Thick supergene gold mineralisation Copper credit expected Lipi Gold Zone No Forestry Issues Mining Licence covering Lipi in place ASX: AUK www.augur.com.au
Slide 29: Jampang – Deposit Area
Jampang – Deposit Area LIPI NORTH ZONE Gold bearing zone at surface Drilling near this zone JADD8 10m @ 7.47 g/t gold from 73m ASX: AUK www.augur.com.au
Slide 30: Jampang - Infrastructure
Jampang ‐ Infrastructure ASX: AUK www.augur.com.au
Slide 31: AUK – Moving Forward
AUK – Moving Forward WONOGIRI • 40% completion of a 17.19 km² geomagnetic survey targeting magnetic highs which may be indicative of further mineralisation • Second diamond drill rig mobilised to continue resource definition drilling at Randu Kuning prospect • RC program developed with aim of commen
Slide 32: AUK – Why Invest ?
AUK – Why Invest ? • Early entry into two advanced gold +/- copper projects in significant mineralised belt in Indonesia • Shallow mineralisation • Diversified projects • Actively advancing projects. Two drill rigs on Wonogiri and drilling additional targets at Jampang • Under the radar company with