Kutcho Copper Corp · TSXV:KC

Kutcho Copper — Investor Presentation (January 2023)

34 slides from Kutcho Copper's investor presentation, Jan 5, 2023

  1. Slide 1: Investor Presentation January 2023

    TSXV: KC | OTCQX: KCCFF Investor Presentation January 2023

  2. Slide 2: Forward looking statement

    2 | kutcho.ca TSXV:KC OTCQX:KCCFF Forward looking statement This presentation contains certain statements that may be considered “forward-looking statements” with respect to Kutcho The forward-looking information contained herein is expressly Copper Corp. (“Kutcho Copper” or the “Company”) within th

  3. Slide 3: Feasibility Study Headline Results

    3 | kutcho.ca TSXV:KC OTCQX:KCCFF 1 Metal prices: Cu US$4.00/lb, Zn US$1.15/lb, Ag US$20/oz. Au US$1,600/oz 2 Spot metal prices: Cu US$4.50/lb, Zn US$1.57/lb, Ag US$24/oz. Au US$1,788/oz Feasibility Study Headline Results 3 CuEq calculation based on base case metal prices 4 All-in sustaining cost es

  4. Slide 4: Significant Leverage to Rising Metal Prices

    4 | kutcho.ca TSXV:KC OTCQX:KCCFF Significant Leverage to Rising Metal Prices NPV and IRR Sensitivity to Metal Price NPV and IRR Sensitivity to Copper Price % Increase linked to Copper Price Only Zinc, Silver & Gold at Base Case Prices dddd * Values includes Wheaton Stream

  5. Slide 5: Kutcho Copper offers a strong share structure

    5 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho Copper offers a strong share structure Share Ownership Share Price Last 12 Months (TSX.V – C$) $1.00 Capital structure $0.75 Shares issued 125,699,697 $0.50 Stock options 6,745,000 Warrants 300,000 $0.25 Ticker TSXV:KC 8.5% Capstone OTCQX:KCCFF 14.2% Wheaton

  6. Slide 6: Wheaton provides over $100M financing package

    6 | kutcho.ca TSXV:KC OTCQX:KCCFF Wheaton provides over $100M financing package Metal % contribution Precious metals stream (US $87.8M) to revenue at base case ● US $15.8M towards project acquisition metal prices ● US $10.5M+ in equity participation ● US $7M provided to fund the feasibility study 65%

  7. Slide 7: A development-friendly region with a number of major projects

    7 | kutcho.ca TSXV:KC OTCQX:KCCFF N Kutcho A development-friendly Dease Lake Property with 120km region with a number of access road major projects in various Red Chris Kemess phases of development Galore Creek KSM & construction, with Mt Milligan Brucejack Port of Stewart local skilled workforce Ki

  8. Slide 8: First Nations – Tahltan & Kaska Dena

    8 | kutcho.ca TSXV:KC OTCQX:KCCFF First Nations – Tahltan & Kaska Dena Kutcho Copper executed a new Exploration Agreement with Tahltan Central Government in November 2021 and renewed their Communications Agreement in January 2021 Exploration Agreement signed with Kaska Dena Nation in February 2019 P

  9. Slide 9: Kutcho is an accessible project with on-site and nearby infrastructure

    9 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho is an accessible project with on-site and nearby infrastructure situated within moderate terrain Accessibility Port facilities Existing field camp First Nations 120 km of existing ground in Stewart ~400 km from with 900 m long gravel ongoing engagement with ac

  10. Slide 10: Efficient Infrastructure Layout

    Tailings 10 | kutcho.ca TSXV:KC OTCQX:KCCFF Management Facility Efficient Infrastructure Layout Stockpiles Open Pit Collection Pond Compact site footprint Waste rock dump temporary - backfilled to open pit during operations Underground Mill Complex Portal Tailings embankment: downstream Camp Accomodat

  11. Slide 11: Kutcho Project Mine Workings

    11 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho Project Mine Workings View to Northeast Main Main Open Pit Portal to Underground Mines Esso Underground Mine Esso Main Underground Mine Sumac Inferred Resource

  12. Slide 12: Kutcho Copper Development Timeline

    12 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho Copper Development Timeline Environmental permitting Feasibility Study: Completion November 2021 Construction Decision: Estimated Q2/Q3 2024 subject to only BC provincial 2021 2022 2023 2024 review process Feasibility Study The Company filed the Project Descr

  13. Slide 13: The Kutcho project covers 90% of the prospective Kutcho Formation rocks

    13 | kutcho.ca TSXV:KC OTCQX:KCCFF The Kutcho project covers 90% of the prospective Kutcho Formation rocks Kutcho Deposit SOUTH NORTH Andrea Creek Limestone Andrea Creek Limestone Nahlin King Salmon Andrea Thrust Fault The prospective volcanic rocks are Thrust Fault Creek Kutcho Limestone Fault fold

  14. Slide 14: Kutcho Copper: Strong upside potential

    14 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho Copper: Measured Strong upside potential Indicated Inferred Drillholes Near resource (brownfields) drill targets 1 Open Pit Shell: 459,000 tonnes Main deposit Inferred Mineral resources resides within the current open pit shell and are available for potential

  15. Slide 15: No significant exploration on the property since 1990

    15 | kutcho.ca TSXV:KC OTCQX:KCCFF No significant exploration N on the property since 1990 Esso Deposit Multiple repeated VMS sulphide horizons are under-explored Sumac Deposit Main Deposit Priority Targets The IRJ Northwest was first identified as a conductor IRJ Northeast. Three holes drilled in 1990

  16. Slide 16: Copper Developers: Feasibility Study Re-Rate Opportunity

    16 | kutcho.ca TSXV:KC OTCQX:KCCFF Copper Developers: Feasibility Study Re-Rate Opportunity dddd Based on Kutcho Copper’s closing price as of November 8, 2021 Source: Haywood Securities Inc., S&P Capital IQ Pro.

  17. Slide 17: Upcoming catalysts

    17 | kutcho.ca TSXV:KC OTCQX:KCCFF Regional Exploration Upcoming catalysts Planning for ongoing systematic exploration of several underexplored green fields targets - no significant Near Mine exploration done on the property since Opportunities Permitting Expansion 1990. High priority targets identifie

  18. Slide 18: Management team

    18 | kutcho.ca TSXV:KC OTCQX:KCCFF Management team Vince Sorace Andrew Sharp P.Eng Rob Duncan President & CEO, Director COO Senior Technical Consultant ● Over 30 years experience in ● 35 years experience in mine design, ● 26 years experience in mineral capital markets construction, operational mine

  19. Slide 19: Board of Directors & Advisory Board

    19 | kutcho.ca TSXV:KC OTCQX:KCCFF Board of Directors & Advisory Board Stephen Quin Bill Bennett Jay Sujir Mark Forsyth Director Director Director Director ● 40 years experience in mining ● Former BC gov’t MLA for 16 years ● Partner, Farris, Vaughan, ● Over 30 years’ with extended & corporate affair

  20. Slide 20: Kutcho Copper – a clear path to production

    20 | kutcho.ca TSXV:KC OTCQX:KCCFF Kutcho Copper – a clear path to production High Grade Copper Zinc development project with Permitting – Transparent and prescribed process, 22.8 Mt in the Measured and Indicated resources supportive First Nations, local stakeholders and category at 2.26% CuEq¹ repr

  21. Slide 21: Contact

    TSXV: KC | OTCQX: KCCFF +1 604-628-5623 info@kutcho.ca Kutcho.ca Suite 717 1030 West Georgia St. Tel Email Website Vancouver, BC Canada V6E 2Y3

  22. Slide 22: Appendix

    kutcho Appendix

  23. Slide 23: Technical information compliance with NI 43-101

    23 | kutcho.ca TSXV:KC OTCQX:KCCFF Technical information compliance with NI 43-101 The technical information in this presentation (the “Technical Information”) has been reviewed and approved by Mr. The Project will be subject to a number of federal, provincial and Garth Kirkham, P.Geo., Technical Ad

  24. Slide 24: Feasibility Study Overview

    24 | kutcho.ca TSXV:KC OTCQX:KCCFF Feasibility Study Overview Notes: ● Tonnages are reported in metric tonnes (t), copper and zinc in pounds (lbs), silver and gold reported in troy ounces (oz). ● "M" = million, "k" = thousand ● All tables report rounded figures and may not sum precisely. ● The financi

  25. Slide 25: Estimate of Mineral Resources

    25 | kutcho.ca TSXV:KC OTCQX:KCCFF Estimate of Mineral Resources Inclusive of Reserves (effective 30 July 2021) Notes: 1. The mineral resource estimates in the table above form coherent bodies of mineralisation that are considered amenable to a combination of open pit and underground extraction meth

  26. Slide 26: Mineral Reserve Estimate

    26 | kutcho.ca TSXV:KC OTCQX:KCCFF Mineral Reserve Estimate (effective 4 November 2021) See next page for Notes

  27. Slide 27: Mineral Reserve Estimate Notes

    27 | kutcho.ca TSXV:KC OTCQX:KCCFF Mineral Reserve Estimate (effective 4 November 2021) Notes: Underground Specific Notes: 1. CIM definitions were followed for Mineral Reserves. 10. Underground Mineral Reserve cut-off grade was C$129.45/t NSR. 2. Mineral Resources are reported inclusive of Mineral Res

  28. Slide 28: Ore by Source and NSR

    28 | kutcho.ca TSXV:KC OTCQX:KCCFF Ore by Source and NSR

  29. Slide 29: Open Pit and Underground Mining Statistics

    29 | kutcho.ca TSXV:KC OTCQX:KCCFF Open Pit and Underground Mining Statistics (Incl Pre-Production) Notes: 1. Includes 1.25 years for pre-production and stockpile rehandle periods 2. Mining operational costs and tonnages are inclusive of the pre-production period.

  30. Slide 30: Flotation Feed Grades

    30 | kutcho.ca TSXV:KC OTCQX:KCCFF Flotation Feed Grades

  31. Slide 31: Processing and Concentrate Production

    31 | kutcho.ca TSXV:KC OTCQX:KCCFF Processing and Concentrate Production Notes: 1. 10.75 years after pre-production, plus 0.25 years in pre-production start-up 2. 0.25 years for pre-production and 2.75 for stockpile rehandle periods 3. Metal recovery to concentrates compared to crusher head feed, an

  32. Slide 32: Capital Cost Summary

    32 | kutcho.ca TSXV:KC OTCQX:KCCFF Capital Cost Summary(1,2) Notes: 1. All values stated are undiscounted. 2. No inflation or depreciation of costs were applied; all costs are in 2021 money values. Major underground mobile equipment, all open pit mobile equipment and the power gensets are leased. 3.

  33. Slide 33: Operating Cost Summary Cash Costs and All-In Sustaining Costs

    33 | kutcho.ca TSXV:KC OTCQX:KCCFF Operating Cost Summary (Excluding Pre-Production(1)) Notes: 1. Pre-production tonnages and costs are not included in the Life-of-Mine operating cost summary (these are Years -2 and -1 and are capitalized). 2. Year 1 includes pro-rated adjustments for working capita

  34. Slide 34: Cash Flow Summary

    34 | kutcho.ca TSXV:KC OTCQX:KCCFF Cash Flow Summary

Kutcho Copper — Investor Presentation (January 2023) on 6ix