Patagonia Gold Corp · TSXV:PGDC

Patagonia Gold — Shareholder Meeting (June 2009)

23 slides from Patagonia Gold's shareholder meeting presentation, June 2009

  1. Slide 1: Patagonia Gold Plc

    Patagonia Gold Plc 2009 Updated June 2009

  2. Slide 2: Patagonia Gold - Voting

    Patagonia Gold ‐ VOTING ORDINARY SPECIAL Resolution 1 Resolution 2 Resolution 3 Resolution 4 Resolution 5 Resolution 6 Resolution 7 Approvall off Reaponitemnt i off Reappointment i Reappointment i Repricing i i off Allotment ll off Allotment ll off sec. up to William of Richard securities up to £ £

  3. Slide 3: Important Notice

    IMPORTANT NOTICE The information contained in these slides has been prepared by Patagonia Gold Plc ("the Company") in connection with a proposed placing of ordinary shares in the capital of the Company. The information in these slides is subject to updating, completion, revision, further verificatio

  4. Slide 4: Patagonia Gold Plc

    PATAGONIA GOLD PLC A precious metals exploration company y operating g in the southern Patagonia provinces of Argentina In February 2007 acquired highly prospective Santa Cruz exploration portfolio from Barrick Gold Excellent results from drilling and exploration in 2007 (Lomada de Leiva), 2008 and

  5. Slide 5: Area of Operation

    AREA OF OPERATION Patagonia Gold through its 100% subsidiary Patagonia Gold S.A. (PGSA) operates in four of the Argentine Provinces in Patagonia as well as Region XI in Chile Total held under license 6,899* km² Contained within ~190 properties *As at 31 May 2009 2009. Note: The numbers and areas of

  6. Slide 6: PGSA and Fomicruz in Santa Cruz

    PGSA and FOMICRUZ in SANTA CRUZ form strategic partnership on 14th April • PGSA will acquire a 90% interest and • Fomicruz SE. to contribute Fomicruz SE will acquire a 10% interest in approximately 100,000 ha, close to a NewCo PGSA´s El Tranquilo and La Manchuria block of properties. • PGSA to contr

  7. Slide 7: La Paloma Property

    La PALOMA PROPERTY LOMADA DE LEIVA PROJECT

  8. Slide 8: Lomada de Leiva

    LOMADA de LEIVA Long g section g gold g g/t x metres PLANNED COMPLETED BRECHA SOFIA PROSPECT Milestones •NI 43-101 for Lomada Resource Project. estimate • Drilling at 0.30 grams per tonne of gold cut off is: of 21 holes for 3,097Metres. •TrialMeasured Heap Leachand Indicated 161,346 construction, Q3

  9. Slide 9: Lomada de Leiva

    LOMADA de LEIVA Plan of Geology with drill holes Aerial view of proposed Leach Pads

  10. Slide 10: Leach columns – 1/2", 4" and 12"

    Leach columns – 1/2” 4” and 12”

  11. Slide 11: El Tranquilo Property Block

    EL TRANQUILO PROPERTY BLOCK

  12. Slide 12: El Tranquilo Property

    EL TRANQUILO PROPERTY CAP OESTE PROJECT EXPLORATION COMPLETED COMPLETED • 95 drill holes for initial resource •Reconnaissance exploration, mapping •NI 43-101 Resource estimate and trenching at 0.30 grams per tonne of gold cut off is: •Drilling of 6 prospects with 29 holes I di t d Indicated: f 2 for

  13. Slide 13: Cap Oeste

    CAP OESTE Long-section showing Au x metre based on 2008 / 9 drill results •NI NI 43 43-101 101 R Resource estimate ti t at 0.30 grams per tonne of gold cut off is: Indicated 149,842 , oz. gold g + 3,647,751 , , oz silver Inferred 154,257 oz. gold + 3,282,074 oz silver 400 350 oz gold equivalent 400,

  14. Slide 14: Cap Oeste Project

    CAP OESTE PROJECT

  15. Slide 15: Cap Oeste - Drill hole sections N 9950 / 10100

    CAP OESTE - Drill hole sections N 9950 / 10100 CO-54 7.0m @47.1g/t Au / 769g/t Ag Including 2.80m@115.9g/t Au /1,875g/t Ag CO-144 33m @5.77g/t Au / 182g/t Ag Including 5m@10 07g/t Au /150g/t Ag 5m@10.07g/t

  16. Slide 16: Cap Oeste Strike extension exploration

    CAP OESTE Strike extension exploration La Pampa drilling Zone of intersection of the Bonanza fault structure and the Don Pancho corridor. CX 038 ffrom 114m CX-038, 114 2.25m @ 5.71 g/t Au Cap p Oeste Resource Cap Oeste South Este (COSE) CSE- 002, from 134m 12m @ 2.53g/t Au Including: 3.00m @ 5.19g/t

  17. Slide 17: El Tranquilo Property Block Exploration

    El Tranquilo Property Block Exploration Don Pancho drilling DP-03 from 20m 5m @8.13g/t Au 138g/t Ag Open along strike / down dip. dip Vetas Norte – Laguna VN 001 from 35m VN-001 6m @ 0.84 g/t Au Felix drilling FLX-01-R from 19m 3m @ 21.7 g/t Au Breccia Valentina drilling BVA-002-D from 26m 12.5m @ 2

  18. Slide 18: La Manchuria

    La MANCHURIA COMPLETED •40 drill of holes for 8,099 metres on the Main Zone. •High grade gold and silver results in several intersections PLANNED • Geophysical survey • Assimilation A i il ti off exploration l ti and d drill results • Peripheral exploration • Follow up infill drill programme and to

  19. Slide 19: La Manchuria

    La MANCHURIA Significant results Drill hole location plan D ill Hole Drill H l No. N From F IInterval t l G d Grade G d Grade Metres Metres Au g/t Ag g/t LM-002-D 43.30 0.55 8.08 10 and 52.55 1.51 6.38 4,521 LM-005-D 22.00 0.65 3.17 1,445 LM-008-D 82.00 0.50 20.10 2,980 and 90.00 0.50 20.20 509 and

  20. Slide 20: Exploration in Santa Cruz

    Exploration in Santa Cruz Sarita prospect Lineaments from f the Mina Martha trend can be traced on satellite imagery into the Sarita property. Within the Sarita property several mineralised corridors have been identified that host quartz veins / breccia structures. Significant mineralization is host

  21. Slide 21: Programme for 2009

    PROGRAMME FOR 2009 • Lomada de Leiva – Complete Metallurgical testing, Environmental and Base-line Studies – Construct and load 50,000 tonne Trial heap Leach operation – Commence production of gold from Trial by Q4 2009. – Complete a Full Feasibility Study. • Cap Oeste – Continue drilling to Q2 2009

  22. Slide 22: Development Objectives

    DEVELOPMENT OBJECTIVES T b To become a gold ld producer d b by 2010 • Advancing the Lomada de Leiva low cost gold project through trial test work and full Feasibility-2009. Permitting and construction- 2009/10. Production 2010. Growth • Expansion of the Lomada de Leiva gold project through explorati

  23. Slide 23: Slide 23

Patagonia Gold — Shareholder Meeting (June 2009) on 6ix