  1. Slide 1: Pacific Drilling Alternate Scenario Analysis August 2020

    FRE 408 PROTECTED – SUBJECT TO NDA Pacific Drilling Alternate Scenario Analysis August 2020

  2. Slide 2: Disclaimer: Forward-Looking Statements

    FRE 408 PROTECTED – SUBJECT TO NDA 2 Disclaimer THIS PRESENTATION IS NOT AN OFFER OR INVITATION TO BUY OR SELL SECURITIES IN ANY JURISDICTION. Forward‐Looking Statements Certain statements and information contained in this presentation constitute “forward‐looking statements” within the meaning of th

  3. Slide 3: Disclaimer: Industry and Market Data

    FRE 408 PROTECTED – SUBJECT TO NDA 3 Disclaimer THIS PRESENTATION IS NOT AN OFFER OR INVITATION TO BUY OR SELL SECURITIES IN ANY JURISDICTION. Industry and Market Data This presentation has been prepared by the Company and includes market data and other statistical information from third‐party sourc

  4. Slide 4: Rig contract and activity timeline 2020-2023

    FRE 408 PROTECTED – SUBJECT TO NDA Jan‐20 Feb‐20 Mar‐20 Apr‐20 May‐20 Jun‐20 Jul‐20 Aug‐20 Sep‐20 Oct‐20 Nov‐20 Dec‐20 Jan‐21 Feb‐21 Mar‐21 Apr‐21 May‐21 Jun‐21 Jul‐21 Aug‐21 Sep‐21 Oct‐21 Nov‐21 Dec‐21 Jan‐22 Feb‐22 Mar‐22 Apr‐22 May‐22 Jun‐22 Jul‐22 Aug‐22 Sep‐22 Oct‐22 Nov‐22 Dec‐22 Jan‐23 Feb‐23

  5. Slide 5: Dayrate & utilization projections revised & extended through 2025

    FRE 408 PROTECTED – SUBJECT TO NDA Dayrate1 & utilization projections revised & extended through 2025 5 Firm Contracts Speculative Contracts Today Note: PACD 2020 historical average dayrates include contracts negotiated in 2018, while the Company was in bankruptcy, and in early 2019 before the marke

  6. Slide 6: Unrestricted cash balance projections – Alternate Scenario vs June Base Case

    FRE 408 PROTECTED – SUBJECT TO NDA Unrestricted cash balance projections – Alternate Scenario vs June Base Case 6 June Base Case Sep 2022 Alternate Scenario Mar 2023 Projected Low Points (in millions) Alternate Scenario projections result in: i. Increased cash balance at low balance timing of June B

  7. Slide 7: Free cash flow variances between Alternate Scenario & June Base Case

    FRE 408 PROTECTED – SUBJECT TO NDA ($ in millions) Total 2020 2021 2022 2023 Rig Cash Margin Forecast Update 21 8 11 4 (1) Impacts of major changes in rig assumptions Addition of Meltem Ramp‐up and Operations 12 ‐ ‐ (50) 62 Removal of Bora speculative contract margin (61) ‐ 1 (19) (43) Scrapping net

  8. Slide 8: Alternate Scenario – Dayrate & Utilization Sensitivities

    FRE 408 PROTECTED – SUBJECT TO NDA Alternate Scenario – Dayrate & Utilization Sensitivities 8 2021‐2023 Average Day Rate 2021‐2023 Average Utilization 2021‐2023 Average Day Rate Low Cash Balance or Liquidity Gap Timing of Positive Low Point Inflection or Zero Balance Note: Blue boxes indicate result

  9. Slide 9: Alternate Scenario – Meltem Ramp-up & Scirocco Retirement Sensitivities

    FRE 408 PROTECTED – SUBJECT TO NDA Alternate Scenario – Meltem Ramp‐up & Scirocco Retirement Sensitivities 9 Meltem Ramp‐up Scirocco Retirement Option Note: Blue boxes indicate results from Alternative Scenario

  10. Slide 10: Alternate Scenario would modestly enhance liquidity and high-grade fleet

    FRE 408 PROTECTED – SUBJECT TO NDA Alternate Scenario would modestly enhance liquidity and high‐grade fleet 10 Scenario for high‐grading the PACD drillship fleet If current opportunities do not yield results in 4Q20 the Company could: .. Retire the Mistral .. Retire the Bora Protection of low‐cost o