Essar Shipping Limited. · NSE:ESSARSHPNG

Essar Shipping — Essar Oil — Q1 FY2012 Earnings Presentation

53 slides from Essar Shipping's earnings presentation, July 2011

  1. Slide 1: Essar Oil Limited Analyst Presentation

    Slide 1: Essar Oil Limited Analyst Presentation

    Essar Oil Limited Analyst Presentation Results for quarter ended 30th June, 2011

  2. Slide 2: Agenda of Presentation

    Slide 2: Agenda of Presentation

    Agenda of Presentation Performance Snapshot Industry Overview & Market Outlook Operations Projects Financials 1

  3. Slide 3: Performance Snapshot

    Slide 3: Performance Snapshot

    d ESSAR’ OIL & GAS Performance Snapshot

  4. Slide 4: Quarterly Highlights

    Slide 4: Quarterly Highlights

    Quarterly Highlights Strong operating performance of refinery with capacity utilization above 135%, throughput of 3.62 mmt. Revenue increased by 37% & EBIDTA increased by 124% % compared to corresponding previous quarter, demonstrating excellent financial performance. Profit after tax increased to R

  5. Slide 5: Industry Overview & Market Outlook

    Slide 5: Industry Overview & Market Outlook

    Industry Overview & Market Outlook 4

  6. Slide 6: Global Oil Demand

    Slide 6: Global Oil Demand

    Global Oil Demand 90.00 World Oil Demand (mbpd) 89.29 89.00 88.01 88.00 87.00 86.31 86.06 86.00 85.17 85.00 84.75 84.00 83.00 82.00 81.00 80.00 2006 2007 2008 2009 2010 2011 Estimated Source : IEA • 2010 annual oil demand growth was 2.84 mbpd- mbpd one of the highest in history • 2011 oil demand gro

  7. Slide 7: Cracks Outlook

    Slide 7: Cracks Outlook

    Cracks Outlook USD /bbl Gasoil FO Jet Gasoline $25 20.33 20.36 20.01 20.35 20.31 19.44 $20 14.26 19.43 18.33 18.58 $15 12.86 18.40 18.48 18.18 11.76 12.39 13.04 $10 11.34 11.66 11.81 10.48 7.40 8.69 8.5 $5 6.71 7.08 7.56 $0 (4.81) (6.69) (6.75) -$5 (8.69) (8.52) (8.23) (8.31) (9.04) (9.56) -$10 -$15

  8. Slide 8: Market Dynamics

    Slide 8: Market Dynamics

    Market Dynamics Widening the Gap between Crude Price ($/bbl) Difference between Light &Heavy Crude ($/bbl) Arab Light - Arab Heavy Arab Light - Norooz WTI Brent Dubai 16 125 123 13.67 120 14 11.89 115 114 114 115 116 12 10.25 9.99 110 104 108 108 10 109 7.91 105 110 8 101 97 103 6 5.08 100 100 4.20

  9. Slide 9: Operations

    Slide 9: Operations

    d ESSAR’ OIL & GAS Operations

  10. Slide 10: Vadinar Refinery

    Slide 10: Vadinar Refinery

    d ny ae . . ESSAR Vadinar Refinery OIL & GAS

  11. Slide 11: Operating Performance – Refinery: Crude Throughput and Mix

    Slide 11: Operating Performance – Refinery: Crude Throughput and Mix

    Operating Performance – Refinery Crude Throughput Crude Mix Light Heavy Ultra Heavy 16 14.76 100% 14 90% 12 80% 34% 35% 36% 34% Million Tonnes 10 70% 60% 8 50% 6 40% 47% 44% 45% 53% 3.68 3.65 3.62 30% 4 20% 2 10% 19% 20% 19% 13% - 0% Q1 FY11 FY11 Q4FY11 Q1 FY12 Q1 FY11 FY 11 Q4 FY11 Q1 FY12 Processe

  12. Slide 12: Operating Performance – Refinery: Product Mix

    Slide 12: Operating Performance – Refinery: Product Mix

    Operating Performance - Refinery Product Mix Light Middle Heavy 100% 28% 28% 29% 29% 80% 60% 46% 46% 46% 44% 40% 20% 26% 27% 25% 27% 0% Q1 FY11 FY11 Q4 FY11 Q1 FY12 Optimised production of middle & light distillates – High margin segment Heavy Distillates include positive margin Bitumen converted fr

  13. Slide 13: Operating Performance – Refinery: Sales Mix

    Slide 13: Operating Performance – Refinery: Sales Mix

    Operating Performance - Refinery Sales Mix 100% 90% Bulk PSUs Exports Retail 80% 70% 5% 2% 1% 8% 5% 7% 60% 6% 5% 60% 59% 61% 50% 57% 40% 30% 20% 32% 33% 32% 10% 27% 0% Q1 FY11 FY11 Q4 FY11 Q1 FY12 Continue to focus on domestic market due to better price realization of petro products Export products

  14. Slide 14: Retail

    Slide 14: Retail

    Retail Number of Retail Outlets Operational & under Surat construction has reached to 1639. Prices for HSD and MS, were maintained higher than PSUs across India, throughout the quarter, on the back of high product prices Duty cuts & revision in prices of MS & HSD announced by Govt recently, made pet

  15. Slide 15: Projects

    Slide 15: Projects

    d ESSAR’ OIL & GAS Projects 14

  16. Slide 16: Refining Expansion - Phase I

    Slide 16: Refining Expansion - Phase I

    Refining Expansion - Phase I Expansion to 18 MMTPA (Project Cost : Rs 8310 crore) Delayed Coker Unit Complexity to improve to 11.8 from 6.1 Overall progress : 92.37% Engineering : 99.90% Procurement :96% Construction : 87% All critical / major equipments erected at site Mechanical completion of numb

  17. Slide 17: Refining Optimization Project

    Slide 17: Refining Optimization Project

    Refining Optimization Project Expansion to 20 MMTPA Delayed Coker Unit Overall progress : 56% Optimization project to provide excellent economics due to maximum utilization of low priced Ultra Heavy Crude. Optimization Project to complete in minimum time & cost & provide an opportunity to optimize t

  18. Slide 18: Units Mechanically completed

    Slide 18: Units Mechanically completed

    Units Mechanically completed ISOM Unit (Isomerization Unit) Cooling Tower Natural Gas Station Natural Gas Station Desalination Plant 17

  19. Slide 19: Units Mechanically completed

    Slide 19: Units Mechanically completed

    Units Mechanically completed Air Generation Unit Raw Water Treatment Plant D M Plant 18

  20. Slide 20: Supporting Infrastructure: Commissioned

    Slide 20: Supporting Infrastructure: Commissioned

    Supporting Infrastructure: Commissioned Power Plant 380MW (Gas based) Power Plants (Owned by Essar Power) Existing Power Plant : 77 MW & steam @ 230 TPH & Commercial operation of Vadinar Phase – I Expansion of 380 MW completed; synchronized with Grid, ready to supply power to Refinery Expansion Proj

  21. Slide 21: Supporting Infrastructure Facilities

    Slide 21: Supporting Infrastructure Facilities

    Supporting Infrastructure Facilities Ports & Terminals (Owned by EPL) Current facilities 5 road & 1 rail gantry : 7 mmtpa 1 berth at Jetty for product evacuation : 7 mmtpa 1 SPM with crude intake capacity : 27 mmtpa Tankages, Pipelines & other facilities New Additional facilities 5.5 mmtpa tankages

  22. Slide 22: Upgradation of existing unit – CDU/VDU

    Slide 22: Upgradation of existing unit – CDU/VDU

    Upgradation of existing unit – CDU/VDU Overall Progress : 95.68% (93.87% - Mar.’2011 2011) 120 out of 126 equipments received Erection of all equipments completed Revamp will be completed during the Shutdown – Q3 CY2011 21

  23. Slide 23: VGO HT (Vacuum Gas Oil Hydrotreater Unit)

    Slide 23: VGO HT (Vacuum Gas Oil Hydrotreater Unit)

    VGO HT (Vacuum Gas Oil Hydrotreater Unit) March - 11 June - 11 Overall Progress : 93.86% (88.08% - March, 2011) VGO-HT Both Reactors erected; Weighing Approx 1400 MT; 58.4 Meter long; Diameter 5.5 mtrs. 165 out of 177 equipments received. Major equipments erected : Kerosene & Diesel Stripper, MP Med

  24. Slide 24: DCU (Delayed Coker Unit)

    Slide 24: DCU (Delayed Coker Unit)

    DCU (Delayed Coker Unit) March- 11 June - 11 Overall Progress : 86.05% (78.21% - Mar.’2011) All Six Coker drums including structural modules erected, piping in progress Major equipments erected : 6 Coke drums, Debutanizer, Absorber, Stripper, Light cycle & Heavy cycle gas oil stripper, Blow down tow

  25. Slide 25: DHDT Unit (Diesel Hydrotreater Unit)

    Slide 25: DHDT Unit (Diesel Hydrotreater Unit)

    DHDT Unit (Diesel Hydrotreater Unit) Mar- 11 June- 11 Overall Progress : 92.58% (85.15% - Mar.’2011) 110 equipments out of 122 equipments received. received Reactor erected Major equipments erected : Recycle gas compressor, Recycle gas scrubber, Stripper, Product fractionators, Feed surge drum, Recy

  26. Slide 26: HMU Unit (Hydrogen Manufacturing Unit)

    Slide 26: HMU Unit (Hydrogen Manufacturing Unit)

    HMU Unit (Hydrogen Manufacturing Unit) Unit March - 11 June - 11 Overall Progress : 91.34% (80.13% - Mar ’2011) 73 equipments out of 74 equipments received Major equipments erected : All 5 reactors erected, Process condensate stripper, Process gas boiler, Pre reformer, Common LPG Surge drum, Flare k

  27. Slide 27: Refinery Expansion Project

    Slide 27: Refinery Expansion Project

    Refinery Expansion Project Mechanical Completion of Units/ Facilities under Expansion Project 26

  28. Slide 28: Exploration & Production

    Slide 28: Exploration & Production

    d ESSAR’ OIL & GAS Exploration & Production 27

  29. Slide 29: Project Progress at Raniganj

    Slide 29: Project Progress at Raniganj

    Project Progress at Raniganj Present Production : 33000 scmd; has been kept at low level, pending statutory approval. Significant progress achieved in drilling surface holes & vertical wells Pipeline Construction from Raniganj to Durgapur completed (48 KM) Gas Gathering Station completed. Final pigg

  30. Slide 30: Financials

    Slide 30: Financials

    d ESSAR’ OIL & GAS Financials 29

  31. Slide 31: Refining and Marketing Financials

    Slide 31: Refining and Marketing Financials

    Refining and Marketing Financials Unaudited & Provisional Rs - crore Revenue EBITDA CP GRM1 5.79 Throughput 3.62 7.38 3.68 US$/bbl (mmt) 18,000 1,000 37% 16,478 913 16,000 900 +124% 14,000 800 Rs - Crore 12,048 Rs - Crore 700 12,000 600 10,000 500 407 8,000 400 6,000 300 4,000 200 2,000 100 - - Q1 F

  32. Slide 32: Financial Highlights

    Slide 32: Financial Highlights

    Financial Highlights Unaudited & Provisional Rs in Crore Net worth excludes FCCBs of US$ 262 Million ( Rs 1172 crore) issued to EEPLC Debt Includes Project Debt & FCCBs of Rs. 5874 cr. ( corresponding previous quarter Rs. 2841 cr.) 31

  33. Slide 33: Financial Results

    Slide 33: Financial Results

    Financial Results ( Rs in Crore) Unaudited & Provisional Particulars Q1 FY11 FY 11 Q4 FY 11 Q1 FY12 Throughput-Million Tones 3.68 14.76 3.65 3.62 INCOME Income from Operation 12,048 53,119 14,846 16,478 Less: Excise Duty & Taxes 1,517 6,131 1,531 1,532 Net Income from Operation 10,531 46,988 13,315

  34. Slide 34: Summary

    Slide 34: Summary

    Summary Strong Financial & Operating Performance Refinery Expansion nearing to completion Demand environment for petro products remains positive Raniganj commercialisation to provide boost to E&P strategy Capturing further growth opportunities ISOM : Unit Mechanical Completion 33 33 33

  35. Slide 35: Indian Growth Story to continue

    Slide 35: Indian Growth Story to continue

    Indian Growth Story to continue……. India has low GDP per capita ... ... is expected to drive among the fastest GDP growth rates in the world 2.8% 1.2% 4.0% 7.7% 10.3% 8.8% GDP per capita (PPP terms) – 46,085 9.75% 8.25% GDP Growth Rate 34,919 2010 (US$) (2010-15) 4.33% 4.09% 15,671 11,118 2.56% 2.46

  36. Slide 36: Major Units and Licensors

    Slide 36: Major Units and Licensors

    Major Units and Licensors CAPACITY CAPACITY LICENCER / DETAILED UNIT / FACILITY (MMTPA) Post OPTIMISATION TECHNOLOGY ENGG 10.5 (CDU) 18 (CDU) CDU / VDU 7.2 (VDU) 10.9 (VDU) VISBREAKER (VBU) 1.9 2.0 (CDU) NAPHTHA HYDROTREATER (NHT) 1.6 1.8 CONTINUOUS CATALYTIC REFORMER UNIT 0.9 1.1 (CCR) FLUID CATALY

  37. Slide 37: Product yield

    Slide 37: Product yield

    Expansion to provide crude as well as product flexibility 14 MMTPA 18 MMTPA 20 MMTPA Light Light Ultra- Light 11% 13% heavy 20% 28% Crude mix Heavy 25% Ultra- Heavy Ultra- Heavy 64% Heavy 52% 87% 14MT 18MT 20MT (current) (expected post phase 1 expansion) (expected post optimisation) Fuel loss Fuel l

  38. Slide 38: Yield to shift to higher grade products optimal for export markets

    Slide 38: Yield to shift to higher grade products optimal for export markets

    Yield to shift to higher grade products optimal for export markets Conversion of entire negative margin fuel oil into high value added products and pet coke Building higher flexibility between light and middle distillates Flexibility to produce petrochemical feed stock Euro IV & V grade at 55% in Ga

  39. Slide 39: Essar Oil – Refining

    Slide 39: Essar Oil – Refining

    Essar Oil – Refining Increasing capacity and complexity Key highlights Low cost, safe and efficient operations – refinery operating Capacity (MMTPA) 1 cost US$1-2 per barrel lower than global peers 38 20 2 Strategically located on the west coast of India 18 14 Increasing complexity from 6.1 to 11.8

  40. Slide 40: Cost-effective expansion and increased Complexity

    Slide 40: Cost-effective expansion and increased Complexity

    Cost-effective effective expansion and increased Complexity Moving up on the Complexity Front Along with expansion at low cost … Cost Cost Cost (USD/complex bbl) Capacity Compl (US$ Cost (USD/compl Refineries (mmtpa) exity mn) (USD/bbl) exity/ bbl) Year 2435 2417 2313 EOL, Existing 14 6.1 2800 10370

  41. Slide 41: Competitive gross refining margin

    Slide 41: Competitive gross refining margin

    Competitive gross refining margin Indian Complex Refinery Singapore Complex Margin 16.00 15.00 Average premium: US$ 5.11/bbl 14.00 11.60 12.20 12.00 US$ 7.34/bbl 10.00 8.40 8.00 6.60 7.66 6.00 6.11 5.79 5.20 4.00 2.00 3.49 - 2007 2008 2009 2010 2011 40

  42. Slide 42: Exploration and Production

    Slide 42: Exploration and Production

    Exploration and Production High impact E&P platform Key highlights 2500 Reserves & resources (mmboe)(a) 1 Diverse portfolio of offshore and onshore oil & gas blocks 971 2132 Oil Gas 40 2000 176 Developing as a leading CBM player - lower risk and with 2 significant demand and exciting growth profile

  43. Slide 43: Leading CBM Gas Player in India

    Slide 43: Leading CBM Gas Player in India

    Leading CBM Gas Player in India Best estimate Unrisked in- 2P/ 2C prospective place Total Details of CBM Block Place Ownership Acreage resources Remarks resources resource Bcf Bcf Bcf Bcf Raniganj (CBM) West Bengal 100% 500 Sq km 201 792 - 993 CPR by NSAI (2010) Rajmahal (CBM) Jharkhand 100% 1128 sq

  44. Slide 44: Details of Major E&P blocks with reserves and resource estimates

    Slide 44: Details of Major E&P blocks with reserves and resource estimates

    Details of Major E&P blocks with reserves and resource estimates Best estimate prospective Peak 2P/ 2C resources Opex Comments resources Prodn. Assets Ownership Oil Gas Total Oil Gas Total (US$ mn) mmbbl Bcf mmboe mmbbl Bcf mmboe $0.43/ Test production commenced. Raniganj (CBM) 100% 201 33 - 792 132

  45. Slide 45: Raniganj Production Profile

    Slide 45: Raniganj Production Profile

    RG(EAST)-CBM-2001/1 2001/1 (RANIGANJ) PRODUCTION PROFILE MMSCMD 4.000 3.500 3.000 2.500 2.000 1.500 1.000 0.500 0.000 1-Sep-13 13 1-Sep-18 18 1-Sep-23 23 1-Sep-28 28 1-Sep-33 33 1-Sep-38 38 1-Jul-09 09 1-Mar-11 11 1-Jul-14 14 1-Mar-16 16 1-Jul-19 19 1-Mar-21 21 1-Jul-24 24 1-Mar-26 26 1-Jul-29 29 1-

  46. Slide 46: Raniganj – low risk development to serve customers in Eastern India

    Slide 46: Raniganj – low risk development to serve customers in Eastern India

    Raniganj – low risk development to serve customers in Eastern India’s gas deficit industrial belt Field overview Onshore block, located in Damodar Valley coal field in the Raniganj region of West Bengal Resources 993bcf (165mmboe) of 2C and best estimate prospective resources (CBM gas), CPR by NSAI

  47. Slide 47: ISOM Unit Work Progress

    Slide 47: ISOM Unit Work Progress

    ISOMProgress- Work Unit Oil and Gas 46 46

  48. Slide 48: Raw Water Treatment Plant Work Progress

    Slide 48: Raw Water Treatment Plant Work Progress

    Work Progress- Oil and Gas Raw Water Treatment Plant 47 47

  49. Slide 49: D M Plant Work Progress

    Slide 49: D M Plant Work Progress

    Work D M Progress- Plant Oil and Gas 48 48

  50. Slide 50: Air Generation Unit Work Progress

    Slide 50: Air Generation Unit Work Progress

    Work Air Progress- Oil Unit Generation and Gas 49 49

  51. Slide 51: Cooling Tower Work Progress

    Slide 51: Cooling Tower Work Progress

    Work Progress- Cooling TowerOil Facility and Gas 50 50

  52. Slide 52: Desalination Plant

    Slide 52: Desalination Plant

    . . ESSAR Desalination Plant

  53. Slide 53: Natural Gas Station

    Slide 53: Natural Gas Station

    d ny a . ESSAR Natural Gas Station cILE GAS

Source: Internet Archive copy of essar.com

More decks from Essar Shipping Limited.

All 48 Essar Shipping decks