Aurelia Metals Limited · ASX:AMI
Aurelia Metals — YTC Resources — Brisbane Mining Conference (October 2013)
30 slides from Aurelia Metals's conference presentation, October 2013
Slide 1: YTC Resources Ltd - Fully Funded High-Grade Development and Exploration Upside
YTC RESOURCES LTD ASX: YTC FULLY FUNDED HIGH-GRADE DEVELOPMENT AND EXPLORATION UPSIDE OCTOBER 2013 1
Slide 2: Disclaimer
DISCLAIMER • This presentation has been prepared by YTC Resources Limited (“YTC” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those securities. No
Slide 3: Hera and Nymagee Projects
HERA AND NYMAGEE PROJECTS FULLY FUNDED HIGH-GRADE Au-Pb-Zn-Ag-Cu DEVELOPMENT WITH MAJOR EXPLORATION UPSIDE STAGE 1: HERA DEPOSIT (YTC-100%) – DEVELOPMENT UNDERWAY • Near-term, high-grade gold-lead-zinc-silver development • Average annual production exceeds 50kozpa Au Eq. over initial mine life of 7.
Slide 4: Cobar Superbasin Deposits
COBAR SUPERBASIN DEPOSITS SCHEMATIC COBAR SUPERBASIN METAL INVENTORY 6.4Moz Au, 200Moz Ag, 2.2Mt Cu, 4Mt Zn, 3Mt Pb Australia NSW 4
Slide 5: Cobar Superbasin Deposits
COBAR SUPERBASIN DEPOSITS Pb-Zn-Ag rich COOLER HOTTER Cu rich 5
Slide 6: Corporate Snapshot
CORPORATE SNAPSHOT CORPORATE SUMMARY – GLENCORE PROJECT FINANCING *Put Option Cover represents an estimated 75% of gold doré production between April 2015 and July 2016 6
Slide 7: Hera Development Underway
HERA DEVELOPMENT UNDERWAY Hera Contractors area – looking south to TSF 7
Slide 8: Hera Development Underway
HERA DEVELOPMENT UNDERWAY Hera Boxcut and Portal 8
Slide 9: Hera Gold-Lead-Zinc Deposit
HERA GOLD-LEAD-ZINC DEPOSIT DEVELOPMENT AND DEPOSIT EXTENSIONS DECLINE POSITION 21ST OCT 1ST VENT DEVELOPMENT COMPLETE 200m ASL Selected Drill Holes outside the Hera HRD042W1 Resource North 11m @ 107g/t Ag, 20% Pb+Zn No Significant Results Strong Mineralisation 100m >40m% Pb+Zn HRD042W2 Selected Dri
Slide 10: Hera Development Key Metrics
HERA DEVELOPMENT KEY METRICS – STAGE 1 HERA DEVELOPMENT Resource 677,200 ounces Au Eq. at 8.6 g/t Au Eq.* Reserve 423,471 ounces Au Eq. at 7.0 g/t Au Eq.* Initial Mine Life 7.3 years Project Revenue (Stage 1 Only) >$510 million Average Annual Production >50,000oz Au Eq. Operating Costs (for 30,000oz
Slide 11: Modular Process Facility
HERA DEVELOPMENT MODULAR PROCESS FACILITY FLOTATION CIRCUIT 56% LEAD + ZINC BULK CONCENTRATE GRINDING AND GRAVITY MODULE 91% LEAD RECOVERY 60% GRAVITY GOLD RECOVERY 90% ZINC RECOVERY PRIMARY AND SECONDARY TERTIARY CRUSHING CRUSHING 120 TPH CONCENTRATE LEACH TANKS 34% GOLD RECOVERY (TOTAL 94%) 47% SI
Slide 12: Hera Development Underway
HERA DEVELOPMENT DEVELOPMENT UNDERWAY • Decline commenced January 2013 – Underground advance to ~1730m (at 21st Oct) • First Production Q3 2014 Quarter Mar-13 Jun-13 Sep-13 Dec-13 Mar-14 Jun-14 Sep-14 Dec-14 Mine Mine: Ore to the ROM Full Scale Ore Production Mill Mill Construction Mill Practical Co
Slide 13: Prospectivity
PROSPECTIVITY HERA-NYMAGEE CORRIDOR Nymagee North Target (strongest gravity • Hera-Nymagee corridor remains highly prospective response in region) • The Hera & Nymagee deposits are both marked by Nymagee Copper prominent gravity highs Deposit • Numerous gravity targets defined by detailed ground Gra
Slide 14: Nymagee Copper Deposit
NYMAGEE COPPER DEPOSIT 3D ISOMETRIC • Historical production ~ 420,000t @ 5.8% Cu • Maiden JORC Nymagee Resource in Dec 2011, after discovery of high grade copper in Oct 2010. • 8.1Mt @ 1.2% Cu, 0.3% Pb, 0.7% Zn and 9g/t Ag • Open to the north and at depth • Represents an analogue to the upper part o
Slide 15: Nymagee Copper Deposit vs CSA
NYMAGEE COPPER DEPOSIT vs CSA SCHEMATIC CROSS SECTION COMPARISON - LOOKING NORTH SHALLOW MAIN SHAFT COPPER ZONE • Nymagee evolving as Pb-Zn-Ag Lens (off section) the upper part of a ‘CSA’ MAIN LENS -200m -200m MAIN LENS style Cobar deposit MASSIVE SULPHIDE >2.5% Cu • CSA copper system Low-Grade Cu M
Slide 16: Nymagee Copper Deposit - Open to North and at Depth
NYMAGEE COPPER DEPOSIT OPEN TO NORTH AND AT DEPTH – NYMAGEE LONG SECTION NYMAGEE NYMAGEE NORTH North GRAVITY HIGH GRAVITY HIGH 200m NMRC090: 3m @ 2.75% Cu and 50g/t Ag NMD068: 14m @ 63g/t Ag, 2.7% Pb and 5.2% Zn from 207m 200m ASL NYMAGEE RESOURCE: 8.1Mt @ 1.2% Cu, 0.3% Pb, 0.7% Zn and 9g/t Ag NMD07
Slide 17: Nymagee North
NYMAGEE NORTH VERY STRONG CONDUCTORS – MAIN CONDUCTOR PLATE YET TO BE TESTED • Nymagee North proving broad copper-lead-zinc-silver NMD078 intersections 7m @ 1.2g/t Au, 25/t Ag, 0.8% Cu, 1.4% Pb+Zn, and 2m @ 90g/t Ag, 18.4% Pb+Zn • Consistent with upper part of Cobar ore system NMD075 18m @ 1g/t Au,
Slide 18: Hera-Nymagee Summary
HERA-NYMAGEE SUMMARY FULLY FUNDED HIGH-GRADE Au-Pb-Zn-Ag-Cu DEVELOPMENT WITH EXPLORATION UPSIDE • Full scale Hera Project development underway and set to deliver: • >$510 million in revenue in Stage 1 (Hera) • Operating Costs of ~A$400/ounce Au* after Pb-Zn credits • Initial Mine Life of 7.3 years •
Slide 19: Building a Mid-Tier Mining Company
GROWTH YTC Resources Limited ASX:YTC 2 Corporation Place ORANGE NSW 2800 T: +61 2 6361 4700 E: office@ytcresources.com www.ytcresources.com BUILDING A MID-TIER MINING COMPANY 19
Slide 20: Appendix 1: Resources and Reserves
APPENDIX 1: RESOURCES AND RESERVES MINERAL RESOURCE ESTIMATE- HERA DEPOSIT - JUNE 2011 NSR Cu Pb Zn Au Eq Contained Au Category Tonnes (A$) Au g/t Ag g/t % % % (g/t) Ozs Eq Indicated 2,113,000 243 4.2 17.0 0.2 2.8 3.9 9.2 Inferred 330,000 207 3.5 14 0.1 2.3 3.3 7.5 Total 2,444,000 238 4.1 16.7 0.2 2
Slide 21: Appendix 2: Other Projects - Kadungle Copper-Gold
APPENDIX 2: OTHER PROJECTS KADUNGLE COPPER-GOLD 560,200 mE 560,400 mE 560,600 mE PDH8 100m @ 0.2g/t Au & 0.11% Cu PL3: 34m @ 0.98g/t Au & 0.14% Cu Large scale, porphyry copper-gold target. Highlight 6,378,800 mN 6,378,800 mN intersections over +2km strike: KDD002 KDD013 12m @ 7.73g/t Au & 0.1% Cu KD
Slide 22: Appendix 2: Other Projects - Doradilla
APPENDIX 2: OTHER PROJECTS DORADILLA: TIN-COPPER-SILVER-LEAD-ZINC 16km skarn zone hosting large scale tin mineralisation with associated copper, silver, lead, zinc and indium. Recent Drill results: • DRAC004: 7m @ 0.93% Sn from 10m • DRAC006: 6m @ 0.61% Sn from 44m • DRAC009: 10m @ 1.09% Sn from 80m
Slide 23: Appendix 2: Other Projects - Tallebung Tin
APPENDIX 2: OTHER PROJECTS TALLEBUNG: TIN Outcropping Very large scale ‘porphyry’ tin target Tin Lodes remains untested. DDH11: Negotiations with Native Title 30.2m @ 0.12% Sn claimants continues. DDH11: DDH16: 12.8m @ 0.27% Sn 250m 30.2m @ 0.12% Sn Target Zone Interpreted Mineralising Granite Talle
Slide 24: Appendix 3: Gold Equivalent Calculations - Hera DFS
APPENDIX 3 GOLD EQUIVALENT CALCULATIONS – HERA DFS & HERA RESERVE This presentation makes references to the Hera Ore Reserve, DFS outputs and metal equivalents. It is the Company's opinion that all the elements included in the metal equivalents calculation have a reasonable potential to be recovered
Slide 25: Appendix 3: Gold Equivalent Calculations - Hera Resource
APPENDIX 3 GOLD EQUIVALENT CALCULATIONS – HERA RESOURCE This presentation makes a number of references to metal equivalents. These metal equivalent values refer to those included with Hera Resource Estimate released to the ASX on 2nd June 2011 It is the company's opinion that all the elements includ
Slide 26: Appendix 4: Board of Directors
APPENDIX 4 BOARD OF DIRECTORS Partner of PricewaterhouseCoopers Australia (Coopers & Lybrand) for 19 years specialising in the Anthony Wehby provision of corporate finance advice. Anthony is based in Sydney and maintains a consulting practice Non-Executive Chairman providing advice on mergers and ac
Slide 27: Appendix 5: Hera Development DFS
APPENDIX 5: HERA DEVELOPMENT DFS – SEPTEMBER 2011 HERA DFS 3D view of Hera Mine Design showing mine capital development, final Diluted Reserve (tonnes) 1,875,918 stope design and CRF fill. Diluted Reserve Grade g/t Au (on gold equivalent basis) 7g/t Au Eq. Net Smelter Return (NSR) $218 / tonne M
Slide 28: Appendix 6: YTC Senior Management
APPENDIX 6: YTC SENIOR MANAGEMENT BUILDING AN EXPERIENCED OPERATIONS TEAM Dean Fredericksen –Chief Operations Officer (COO) Dean has been closely involved on the assessment and Feasibility of the Hera and Nymagee Projects since 2009 and joined YTC as COO in March 2011. Dean brings over 20 years mine
Slide 29: Appendix 7: Funding Structure
APPENDIX 7: FUNDING STRUCTURE Placement Shares: 9,390,000 Amount A$2,946,582.00 Issue Price: $0.3138 per share (being a 25% premium to YTC’s 30 day VWAP) Glencore Position: The placement will increase Glencore’s total shareholding in YTC to 9.9% (undiluted) Facility A Limit: A$20 million Converting
Slide 30: Competent Persons Statements
COMPETENT PERSONS STATEMENTS Competent Persons Statement – Exploration Results The information in this presentation that relates to Exploration Results is based on information compiled by Rimas Kairaitis, who is a Member of the Australasian Institute of Mining and Metallurgy. Rimas Kairaitis has suf
YTC Resources — Brisbane Mining Conference (October 2013) on 6ix