Slide 3: There continue to be positive developments for DTE Energy
There continue to be positive developments for DTE Energy 3 • Reaffirming 2015 EPS guidance and 2016 EPS early outlook • Michigan energy policy reform ‒ Progress continues toward completion • Utility regulatory filings ‒ Expect constructive outcome for DTE Electric rate case later this month ‒ Recei
Slide 4: Overview, Long-Term Growth Update, Summary
4 • Overview • Long-Term Growth Update • Summary
Slide 5: DTE Energy's growth is driven by strong, stable utilities and complementary non-utility businesses
DTE Energy’s growth is driven by strong, stable utilities and complementary non-utility businesses 5 DTE Electric Electric generation and distribution DTE Gas Natural gas transmission, storage and distribution Complementary Non-Utility Businesses Strong, Stable and Growing Utilities Fully Regulated
Slide 6: Our system of priorities is fundamental to how we create value for shareholders
Our system of priorities is fundamental to how we create value for our shareholders 6 5% - 6% Annual EPS Growth Attractive Dividend Strong Balance Sheet 6
Slide 7: Engaged employees focusing on customers' experiences have led to strong satisfaction results
Engaged employees focusing on improving our customers’ experiences have led to strong satisfaction results J.D. Power Rank vs. Midwest Peers Note: DTE Energy received the highest numerical score in the Midwest in the proprietary J.D. Power 2015 Gas Utility Business Customer Satisfaction Study SM. Ba
Slide 8: DTE's continuous improvement capability has enabled us to lead the industry in cost management
DTE’s continuous improvement capability has enabled us to lead the industry in cost management * Source: SNL Financial, FERC Form 1; major US Electric Utilities with O&M > $800 million; excluding fuel and purchased power ** Source: SNL Financial, FERC Form 2; gas distribution companies with > 300,00
Slide 9: Our 2015 operating EPS guidance and 2016 early outlook provide solid growth
Our 2015 operating EPS* guidance and 2016 early outlook midpoints provide solid growth 9 * Reconciliation to GAAP reported earnings included in the appendix (dollars per share) $3.33 $3.64 $3.75 $3.94 $4.09 $4.60 $2.12 $2.24 $2.35 $2.48 $2.62 $2.76 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2
Slide 10: We are reaffirming our 2015 operating EPS guidance and 2016 early outlook
We are reaffirming our 2015 operating EPS* guidance and 2016 early outlook (millions, except EPS) 10 * Reconciliation to GAAP reported earnings included in the appendix ** Total DTE Energy excluding Energy Trading 2015 Guidance 2016 Early Outlook 3Q 2015 YTD DTE Electric DTE Gas Gas Storage & Pipeli
Slide 11: DTE has consistently delivered total shareholder return above the peer average
DTE has consistently delivered total shareholder return above the peer average Source: Bloomberg (as of 11/30/15) 11 Total Shareholder Return 49% • Total return in or near top quartile of S&P 500 Utilities for 3, 5 and 10 years 3-YR 121% 191% 10-YR 5-YR S&P 500 Utilities DTE Energy 40% 77% 127%
Slide 12: Strong growth opportunities coupled with contingency planning give confidence in 5% to 6% EPS growth
DTE Operating Earnings Growth Share Issuance Contingency DTE Operating EPS* Growth Non-Utilities 7% - 8% 5% - 6% * Reconciliation to GAAP reported earnings included in the appendix Strong growth opportunities coupled with contingency planning gives us confidence in our ability to deliver 5% to 6% op
Slide 13: Overview, Long-Term Growth Update, Summary
13 • Overview • Long-Term Growth Update • Summary
Slide 14: Our long-term plan will provide solid results for our stakeholders
Our long-term plan will provide solid results for our stakeholders 14 * 5 year CAGR DTE Electric DTE Gas Gas Storage & Pipelines (GSP) Power & Industrial Projects (P&I) DTE Energy Capital Expenditures ($ billions) Operating Earnings Growth* Rate Base Growth* Targeted Utility ROE / Non-utility IRR $8
Slide 15: We will invest ~$13 billion in capital projects to drive growth through 2020
We will invest ~$13 billion in capital projects to drive growth through 2020 15 (billions) ~$13 $8.2 Distribution infrastructure, maintenance, new generation $1.6 Base investments, infrastructure renewal, NEXUS related $2.0-$2.6 Gathering investments, NEXUS, pipeline expansions $0.6-$0.9 Cogeneratio
Slide 16: The EPA's Clean Power Plan has set significant carbon reduction goals
The EPA’s Clean Power Plan has set forth significant carbon reduction goals which will transform the electric industry The most transformational policy in the history of the electric industry Will cut CO2 emissions by 32% by 2030, compared to 2005 Initial compliance plans to be submitted by Septe
Slide 17: Our generation mix shifts from coal to natural gas and renewables
Our generation mix shifts from coal to natural gas and renewables as we address the EPA’s Clean Power Plan 32% Coal Retirements 2030 Scenario ~6.7 2015 Gas / Renewables Additions ~2.2 ~2.2 ~12.3 (~3.5) ~25% 15%-30% ~15% Nuclear / Other Gas Renewables Coal ~1.2 30%-45% DTE Electric Capacity (GW) Note
Slide 18: Lansing leaders are working toward constructive energy policy reform
Lansing leaders are working toward constructive energy policy reform 18 Clean 1 2 Reliable 4 Affordable 3 Flexible Governor Rick Snyder Valerie Brader Executive Director for the Michigan Agency for Energy Senator Mike Nofs Energy and Technology Committee Chair Representative Aric Nesbitt Energy Poli
Slide 19: Energy legislation is in final stages of development
Energy legislation is in final stages of development and near-term approval is expected 19 • House and Senate closely aligned • Key elements focus on: Retail open access and capacity requirements Integrated resource planning Renewable energy and energy efficiency Oct/Nov Jan Jan/Feb Revisions of
Slide 20: Electric generation and infrastructure renewal will significantly increase investment
Electric generation and infrastructure renewal will significantly increase investment in the decade ahead 32% DTE Electric Total Investment ~$8.2 ~$9.7 2016-2020 2021-2025 ~$7.1 2011-2015 New generation (billions) Distribution infrastructure 20 Maintenance and other projects
Slide 21: Plan to invest $6.6 billion to $10.6 billion in distribution infrastructure
Over the next 10 years we plan to invest $6.6 billion to $10.6 billion in distribution infrastructure 32% 2016-2025 (billions) ~$18 Maintenance and other projects New generation Distribution infrastructure DTE Electric Total Investment Base Case Potential Investment Base Infrastructure renewal Infra
Slide 22: We enter this period of heavy investment with sharp declines in business rates
We enter this period of heavy investment with sharp declines in business rates 22 15%* Large Industrial Customers 9%* Commercial Customers • $600 million of surcharge reductions in 2014 and 2015 • Business cost of service rates implemented in 2015 • These reductions are after $230 million July self-
Slide 23: Investment in our gas utility will increase significantly over the next 5 years
Investment in our gas utility will increase significantly over the next 5 years 23 2011-2015 2016-2020 ~$1.1 ~$1.6 DTE Gas Total Investment (billions) Base infrastructure Infrastructure renewal NEXUS related
Slide 24: The DTE Gas system will be expanded to support the NEXUS interconnection
The DTE Gas system will be expanded to support the NEXUS interconnection • $200 million of NEXUS related investment at DTE Gas through 2017 • Spend primarily for additional compression • Supported by long-term transport agreement with NEXUS DTE Gas service area NEXUS DTE Gas 24
Slide 25: We received approval to expand our main replacement program
We received approval to expand our main replacement program ~$80 Investment (millions) Miles ~80 miles ~$130 ~160 miles Previous Gas Renewal Plan (50 years) Approved Gas Renewal Plan (25 years) Investment* (millions) Miles * Consists of main replacement, meter move-out and pipeline integrity 25 • MP
Slide 26: Gas Storage & Pipelines is developing an asset portfolio with multiple growth platforms
Gas Storage & Pipelines is developing an asset portfolio with multiple growth platforms 26 NEXUS Pipeline DTE Gas DTE Storage Marcellus Shale Utica Shale Bluestone Pipeline Bluestone Gathering System Michigan Gathering
Slide 27: NEXUS project is on track; FERC filing completed in November
NEXUS project is on track; FERC filing completed in November 27 Right of way, field work, design, planning • 50% ownership with Spectra Energy • 1.5 Bcf/d pipeline • ~250 miles of pipe • DTE expected investment of $1 billion 2014 2015 2016 2017 2018 Construction Commercial operation Contracted for p
Slide 28: The Ohio market has provided strong support on the NEXUS path
The Ohio market has provided strong support on the NEXUS path 28 Interconnect agreements with local distribution companies, industrials and power generators in Ohio – 1.4 Bcf/d of opportunity Close proximity to significant additional power generation load
Slide 29: Gas Storage & Pipelines is targeting operating earnings of $170 million by 2020
2014A 2015E 2016E 2017E 2018E 2019E 2020E * Reconciliation to GAAP reported earnings included in the appendix Pipeline Platform** Gathering Platform Storage Platform New Project Development (Other gathering and pipeline expansions) ~$170 $85 $45 $15 $25 ** Includes NEXUS at 50% ownership $82 $95 - $
Slide 30: Power & Industrial Projects operates within three distinct business lines
Power & Industrial Projects (P&I) operates within three distinct business lines DTW Airport, Michigan Gallia Fuels Project, Ohio Mt. Poso Waste Wood Project, California • On-site utility services for industrial and commercial customers • Coke and pulverized coal for steel customers • Wood-fired powe
Slide 31: P&I serves its customers from sites in states
P&I serves its customers from 69 sites in 17 states 31 Industrial Energy Services Renewable Energy Reduced Emissions Fuel
Slide 32: P&I's targeted new project growth of 15% to 20% will offset reduced emissions fuel expirations
P&I’s targeted new project growth of 15% to 20% will offset reduced emissions fuel expirations in 2020 2014A 2015E 2016E 2017E 2018E 2019E 2020E ~$105 $30 $50 $60 ($65) $30 New Project Development / Acquisitions Renewable Energy Reduced Emissions Fuel Industrial Energy Services Corporate allocations
Slide 33: Overview, Long-Term Growth Update, Summary
33 • Overview • Long-Term Growth Update • Summary
Slide 34: Summary
• Proven track record of premium returns • Targeting 5% to 6% operating EPS* growth and parallel dividend growth – Our 2016 early outlook midpoint of $4.93 EPS* represents 7% growth from original 2015 guidance midpoint – This year we increased our annual dividend 16 cents to $2.92 per share, a 5.8%
Slide 35: Detroit is in the midst of a revitalization
Detroit is in the midst of a revitalization 35 DTE Energy Investor Relations www.dteenergy.com/investors (313) 235-8030 DTE Energy Investor Relations www.dteenergy.com/investors (313) 235-8030
Slide 36: DTE Energy
DTE Energy
Slide 37: We are confident our growth plan will deliver value to our shareholders
We are confident our growth plan will deliver value to our shareholders 37 ** Compared to S&P 500 utilities. Source: Bloomberg 2015 operating EPS Guidance midpoint $4.78 total DTE $4.69 growth segments 2016 operating EPS early outlook midpoint $4.93 Providing 5% - 6% growth Significant capital inves
Slide 38: 2015 cash flow and capital expenditures guidance
2015 cash flow and capital expenditures guidance 38 * Includes impact of ~$200 million of equity issued for employee benefit programs in 2015 (billions) (millions) ** Includes Main renewal / Meter Move-out / Pipeline Integrity Cash Flow Summary Capital Expenditures Summary 2014 Actual 2015 Guidance
Slide 39: A strong balance sheet remains a key priority and supports our growth
A strong balance sheet remains a key priority and supports our growth 39 * Debt excludes securitization, a portion of DTE Gas’ short-term debt, and considers 50% of the Junior Subordinated Notes as equity ** FFO (Funds from Operations) is calculated using operating earnings 25% 21% 2014 2015E 2016-2
Slide 40: Michigan's economy continues to improve
Michigan’s economy continues to improve 40 Source: IHS 8.5% 7.1% 5.5% 5.4% 5.3% 2013 2014 2015E 2016E 2017E 15.1 15.8 17.6 19.7 21.9 2013 2014 2015E 2016E 2017E Unemployment Rate Housing Start Ups (000s) Detroit Metro #8 in number of new or expansion projects* Lowest Michigan unemployment since 2001
Slide 41: The Michigan Public Service Commission is the state regulator
The Michigan Public Service Commission (MPSC) is the state regulator for electric and gas utilities Sally Talberg Commissioner Appointed: 7/3/13 Term Ends: 7/2/19 Norm Saari Commissioner Appointed: 8/2/15 Term Ends: 7/2/21 Source: State of Michigan website - www.michigan.gov/ • The MPSC establishes
Slide 42: DTE regulatory filing timeline
DTE regulatory filing timeline DTE Gas • Filed expanded Infrastructure Recovery Mechanism (IRM) 2015 • Filed cost of service rates and general rate case DTE Electric 2014 2016 • Business cost of service rates implemented 3Q • Self implement general rates 3Q • Final rate order 4Q • Expect rate case f
Slide 43: Coal retirements will commence in the five year window and then accelerate after 2020
Coal retirements will commence in the 5 year window and then accelerate after 2020 32% 2015 2016 - 2020 2021 - 2025 ~1,825 MW ~125 MW ~550 MW 2026 - 2030 ~1,000 MW DTE Coal Retirement Timeline (Scenario*) * Estimated amounts. Timing and mix of generation impacted by MISO capacity requirements and Mi
Slide 44: DTE Electric plans $8.2 billion of investments over the next 5 years
DTE Electric plans $8.2 billion of investments over the next 5 years 2015E 2016E 2017E 2018E 2019E 2020E Distribution infrastructure New generation Maintenance and other projects* 2016E - 2020E Total ~$14.5B ~$19.4B YE Rate Base** ~$663M ~$888M Depreciation * Includes power reliability, existing gen
Slide 45: DTE Gas plans $1.6 billion of investments over the next 5 years
DTE Gas plans $1.6 billion of investments over the next 5 years 2015E 2016E 2017E 2018E 2019E 2020E 2016E - 2020E Total Base infrastructure Infrastructure renewal* NEXUS related $1,600 $200 $640 $760 ~$3.3B ~$4.5B - $4.6B YE Rate Base** ~$102M ~$136M Depreciation ** Includes working capital (million
Slide 46: Gas Storage & Pipelines operates projects within asset platforms
Gas Storage & Pipelines operates projects within 3 asset platforms • Bluestone Pipeline • Millennium Pipeline ‒ Valley Lateral • Vector Pipeline • NEXUS Pipeline ‒ FERC filing completed • Bluestone Gathering • Michigan Gathering • 91 Bcf of working capacity • Strategically located between Chicago an
Slide 47: Contractual commitments materially expand the Millennium pipeline
Contractual commitments materially expand the Millennium pipeline • Millennium Expansion – 200+ MMcf/day – In-service expected 4Q 2018 • Valley Lateral: ~130 MMcf/day on new 8 mile lateral – FERC filing complete November 2015; in-service expected April 2017 • Working with interested parties on addit
Slide 48: Gas Storage & Pipelines assets have expansion opportunities
Gas Storage & Pipelines assets have expansion opportunities to accommodate increased demand Pipeline Assets Capacity Bcf/ d In-Service Millennium Pipeline 0.8 Expansion #1 0.2+ 4Q 2018 Total Planned Capacity ~1.0 Bluestone Pipeline (bi-directional)* 0.9 Expansion #3 0.1 2Q 2016 Total Planned Capacit
Slide 49: Third Quarter 2015 and September YTD Reconciliation of Reported to Operating Earnings
Third Quarter 2015 and September YTD Reconciliation of Reported to Operating Earnings 49 Use of Operating Earnings Information – DTE Energy management believes that operating earnings provide a more meaningful representation of the company’s earnings from ongoing operations and uses operating earnin
Slide 50: 2009 – 2014 Full Year Reconciliation of Reported to Operating Earnings
2009 – 2014 Full Year Reconciliation of Reported to Operating Earnings Use of Operating Earnings Information – DTE Energy management believes that operating earnings provide a more meaningful representation of the company’s earnings from ongoing operations and uses operating earnings as the primary
Slide 51: Use of Operating Earnings Information
Use of Operating Earnings Information – DTE Energy management believes that operating earnings provide a more meaningful representation of the company’s earnings from ongoing operations and uses operating earnings as the primary performance measurement for external communications with analysts and i