Piedmont Lithium — Investor Presentation (May 2019)
28 slides from Piedmont Lithium's investor presentation, May 28, 2019
Slide 1: USA's Only Conventional Lithium Project
USA’s Only Conventional Lithium Project Corporate Presentation – May 2019 ASX: PLL NASDAQ: PLL ABN 50 002 664 495
Slide 2: USA's Only Conventional Lithium Project
INTEGRATED BUSINESS Integrated spodumene-to-hydroxide business modelOne of four such large projects globally IDEAL LOCATION Abundant infrastructure and lithium talent pool50+ years of lithium processing in North Carolina LOW COSTS 1st quartile operating costsUS$888mm NPV on initial 13-year mine life
Slide 3: Strong EV Demand Expected to Lead to Lithium Shortages
Strong EV Demand Expected to Lead to Lithium Shortages Source: Benchmark Minerals Intelligence Source: EV Reports.com Source: Green Car Reports New Supply Needed to Support Growth in EV Demand 3
Slide 4: World #1 Car Company VW is All-In on Electric Vehicles
World #1 Car Company VW is All-In on Electric Vehicles Audi e-tron (2019) Tesla Model 3 (2018) 4 Porsche Taycan (2019) Complete Dedication to EVs$80bb capital investmentJoint commitment to lithium-ion with BMW and DaimlerFocus on hydroxide from spodumene“Mining is considered the future-proof solutio
Slide 5: The American Mineral Security Act
The American Mineral Security Act 5 “I think It’s Really Important for our National Security” NC10 Rep Patrick McHenry “Our nation’s mineral security is a significant, urgent, and often ignored challenge…our reliance on China and other nations for critical minerals costs us jobs…and leaves us at a g
Slide 6: Piedmont Ideally Located in North Carolina
Piedmont Ideally Located in North Carolina # 1 State for Business Forbes Magazine 0%State Mining Royalties 23%Corporate Tax Rate ~100%Historic Lithium Production 6
Slide 7: North Carolina Cost Advantage
North Carolina Cost Advantage Source: Public filings, Primero and Company estimates Location drives 1st quartile cost position 7
Slide 8: Projected to be a 1st Quartile LiOH Producer
Projected to be a 1st Quartile LiOH Producer Source: Roskill, Refined production cost includes all direct and indirect operating costs related directly to the physical activity of producing a refined lithium compounds, including feedstock costs (either from internal sources measured using the all-in
Slide 9: Exceptional Economics
$235mmRun-rate EBITDA $888mmAfter-tax NPV 46%After-tax IRR 13Year Mine Life Exceptional Economics 9 PHASE TWO – 2023+Chemical Plant22,700 tpy lithium hydroxide$340mm capex funded partially by concentrate cash flowSteady-state EBITDA - $235mm PHASE ONE – 2020-2022Mine & Concentrator170,000 tpy 6% con
Slide 10: Aggressive Land Consolidation Strategy
Aggressive Land Consolidation Strategy 10 Initial Options415 Acres 2017903 Acres 20181,383 Acres Current2,105 Acres Numerous Prospective Targets to Drive Resource and Mine Life
Slide 11: 2019 Catalysts Should Drive Re-Rating
11 2019 Catalysts Should Drive Re-Rating Market Cap (US$mm) Resource of 16.6Mt @ 1.16% in March 2015 2018E LCE Production of 20,000t Next 90 DaysPhase 4 Drill ResultsDMS testworkMineral Resource updatePFS-level metallurgyScoping Study updateH2 2019PermittingReserve declarationDefinitive Feasibility
Slide 12: M&A Deals Imply Substantial Upside for PLL Shares
M&A Deals Imply Substantial Upside for PLL Shares 12 Lithium M&A Activity AcceleratingWesfarmers US$545mm bid for KidmanALB US$1.15bb bid for 50% of WodginaPilbara and Nemaska have hired advisorsPosco’s acquisition of Galaxy propertiesPluspetrol acquisition of LSC LithiumM&A Valuations Imply Upside
Slide 13: Corporate Snapshot
Corporate Snapshot Piedmont Lithium Limited Shares / ADRs (1 ADR = 100 Shares) 670.4 mm 6.70 mm Price (@ 5/24/19) A$0.16 US$12.19 Market cap A$107.3 US$74.4 mm Cash (@ 3/31/19) A$10.3 mm US$7.1 mm 90-day ADTV (45% Nasdaq, 55% ASX) ~A$167,000 ~US$106,000 Key Shareholders AustralianSuper Pty Ltd 13.2%
Slide 14: Background Materials
Background Materials PIEDMONT
Slide 15: Superior Strategic Position
Superior Strategic Position 15 + 85% recoveries+ Superior infrastructure+ Local by-product markets+ Short transport distances+ Low-cost power and gas+ Local labor force+ Zero state royalties+ Low corporate taxes+ Favorable climate- 13-Year Mine Life Spider Chart Highlights Piedmont’s Potential
Slide 16: High-Grade Maiden Resource
High-Grade Maiden Resource 19.0 Mt @ 1.15% Li2O542,000 tonnes of contained LCEShallow open pit – >80% of resource within 100m of surfaceOpen along strike and at depthExploration Target of 6.5-8.0Mt @ 1.1%-1.3%. The potential quantity and grade of this Exploration Target is conceptual in nature. Ther
Slide 17: Strong Metallurgy
Strong Metallurgy Resource Grade Recovered Grade Competitive Resource Grade…1.15% Resource Grade …and Positive Met Recoveries…85% recoveries…based on bench scale tests and North Carolina precedent …Lead to Strong Recovered GradeDriving strong project economics 17 PFS-Level Met Program Underway at SG
Slide 18: Positive Impact of By-Products
Positive Impact of By-Products By-products were a large business for past lithium producers in NCStrong local markets for quartz, feldspar and micaImports represent large market share due to US mine depletionsInitial offtake conversations underway with leading market participants By-product Annual V
Slide 19: 2019 Project Timeline
2019 Project Timeline 19 A shovel-ready project by year-end
Slide 20: Highly-Experienced Project Team
Technical Consultants Scoping Study Lead(Australia & Canada) Resource Geology(Australia & Canada) Metallurgy(Canada) Permitting(North Carolina) Mine Planning(Virginia) Analytical Testwork(North Carolina) Analytical Test Work(Colorado) Blast Studies(North Carolina) Highly-Experienced Project Team Man
Slide 21: Location, Team, Budget, Timeline, Alignment
LOCATION NC the #7 mining state in USA50 years of lithium processing experience in TSB3mm population within 30 milesNo fly-in / fly-out campsWeather conducive to year-round activity TEAM Core team has extensive project development experienceLead engineer Primero integral to recent successful start-u
Slide 22: Superior Profitability Index vs. Other Mining Projects
22 Superior Profitability Index vs. Other Mining Projects Profitability Index Measures NPV vs. Initial Capex Piedmont Trilogy Sabina Corvus Osisko CleanTeQ General Moly Midas Western Copper eCobalt Seabridge Northern Dynasty Polymet Project Piedmont Arctic Back River North Bullfrog Windfall Sunrise
Slide 23: Cost Parity Has Arrived
Cost Parity Has Arrived Tesla Model 3 Tesla Model 3 CATEGORY Luxury sport sedan Luxury sport sedan 0-60 MPH 4.6 seconds 4.6 seconds RANGE 310 miles ~400 miles PRICE $53,000 $55,000 5-YEAR FUEL 1 $2,549 $10,194 5-YEAR MAINTENANCE 1 $3,018 $9,551 5-YEAR INSURANCE 1 $4,430 $4,513 TAX INCENTIVE 2 ~$7,26
Slide 24: Supply Growth Consistently Over-Estimated
Supply Growth Consistently Over-Estimated 24 Source: Goldman Sachs / Orocobre Limited
Slide 25: LCE Prices Returning to 'New Normal'
LCE Prices Returning to ‘New Normal’ “…contract prices in 2021 and 2025 are equal to or greater than the 2018 sales price with opportunities for price increases” – Luke Kissam, Albemarle CEO“…our average price could decrease during the second half of this year to an average of $11,000-$12,000 per me
Slide 26: Current Lithium Prices Consistent with Piedmont Projections
Current Lithium Prices Consistent with Piedmont Projections 26 Hydroxide premium of $2,500 /t -$3,00 /t, consistent with historic precedentLiOH prices $14,000/t - $15,500/t vs. Scoping Study estimate of $14,000
Slide 27: Disclaimers
Disclaimers Cautionary Statements and Important InformationThis presentation does not constitute or form part of any offer to sell, or solicitation of any offer to buy, any securities in the United States or any other country. This presentation may not form the basis of any contract or commitment wh
Slide 28: America's Only Conventional Lithium Project
America’s Only Conventional Lithium Project Piedmont Lithium Limited Corporate Presentation – May 2019 Keith D. Phillips – President and CEO +1 973 809 0505 kphillips@piedmontlithium.com Exploration Office5706 Dallas-Cherryville Hwy. 279 | Bessemer City | NC 28016| USA www.piedmontlithium.com Regist