Eldorado Gold Corporation · TSX:ELD
Eldorado Gold — Investor Presentation (November 2012)
53 slides from Eldorado Gold's investor presentation, November 2012
Slide 1: Focusing on Delivery – Investor Presentation
Focusing on Delivery Investor Presentation November 2012
Slide 2: Forward-looking statements
Certain of the statements made in this Presentation may contain forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities law. These forward-looking statemen
Slide 3: Investment highlights
> 650,000 oz gold producer with 20 years of international operating experience Leading low cost operator with solid margins and a strong balance sheet Experienced management team with a proven ability to build and operate mines Track record of value creation through successful exploration, d
Slide 4: Operations in highly prospective areas
Operations in highly prospective areas with well-established mining cultures Asset base is diversified across the mining lifecycle Pipeline of assets drives organic growth www.eldoradogold.com 4
Slide 5: By 2016, we aim to
By 2016, we aim to: Construct 5 new mines in 4 countries and expand Kisladag & Olympias Produce 1.7m ounces of gold (2012E: 660,000oz) Have cash operating costs of US$325-350/oz net of by-product (2012E: $465) Maintain balance sheet strength Distribute an attractive dividend to sharehold
Slide 6: Estimated Gold Production 2012-2016
Estimated Gold Production 2012-2016 We’re seeing: 2,000,000 2000 1800 1,750,000 Strong production 1600 growth (Average Annual 1,500,000 Growth Rate: 32%) with Gold Production (oz) 1400 decreasing cash costs 1,250,000 1200 US$/oz 1,000,000 1000 1.7 million oz of gold produced in 2016 750,000 80
Slide 7: Capital Required (US$ m)
5 Year Estimated Development & Expansion Capital 800 We’re investing ~US$2 billion in development & expansion 700 projects over the next 5 600 years: Capital Required (US$ m) 500 1. ~$820 million in Greece 400 2. ~$415 million in Turkey 300 3. ~$380 million in Brazil 200 100 0 2012 2013 2014 2015
Slide 8: Guidance vs Actual
Gold Production – Guidance vs Actual 800 700 600 Oz (thousands) Over the past 5 years we have: 500 400 300 Doubled Production 200 100 0 Increased Reserves & Resources 2007 2008 2009 2010 2011 Guidance Actual Cash Costs – Guidance vs Actual Delivered on expectations 500 400 300 ($/oz) 200 100
Slide 9: 2012 operational performance
Steady 2012 operational performance; 465,794* oz produced YTD at $475/oz cash operating costs ($549/oz total cash costs) On target to meet 2012 production and operating cost guidance Current operations provide solid base for development profile Gold Production Cash Operating Costs 700,000 900
Slide 10: Summarized Financial Results
To end Q3 To end Q3 Summarized Financial Results 2012 2011 Revenues (millions) $797.6 $799.1 Gold sold (ounces) 438,421 490,207 Average realized gold price ($/ounce) $1,665 $1,546 Cash operating costs ($/ounce sold) (1) $475 $401 Total cash cost ($/ounce sold) (1) $549 $467 Gross profit from gold mi
Slide 11: Upcoming milestones
Complete Feasibility Study at Tocantinzinho (TZ) Q4 2012 Receive EIA approval for Perama Hill Q4 2012 Declare commercial production from Efemcukuru Q4 2012 Make construction decisions on Perama Hill, TZ and Certej Q4 2012/Q1 2013 Submit Project Permit Approval (PPA) for Eastern Dragon Q4 2
Slide 12: Expansion, Construction and Development projects
These four projects account for 60% of Eldorado’s future production growth Kişladağ Olympias Skouries Perama Hill (Expansion) (Construction) (Construction) (Development) www.eldoradogold.com 12
Slide 13: Kişladağ Expansion Highlights
EXPANSION Highlights Current production rate 12.5 million tonnes / year (crushing, screening, stacking) Expanded production rate 25.0 million tonnes / year (crushing, screening, stacking) Expanded production rate, average 475,000 ounces / year LOM strip ratio 1.4:1 ROM ore treatment , average 8MT /
Slide 14: Kişladağ expansion: progress to date
EXPANSION Engineering Basic engineering package completed in October Procurement Major long lead mine and plant equipment ordered Construction Earthworks for crusher pad, plant and ancillary facilities underway Contracts Supply and install contract for ETL awarded Expediting contract New L
Slide 15: Kişladağ expansion: next steps
EXPANSION Leach Pad, Kişladağ Engineering Detailed engineering design initiated Procurement Continue procurement of major mining and process equipment Major fabrication initiated Construction Construction of Phase VI leach pad extension Installation of North Pad conveying system Initiate
Slide 16: Olympias development potential
Development Potential Projects within a 10km radius Fully-permitted Excellent infrastructure (roads, power, port access) Experienced & growing local teams Phased construction approach Strong government support www.eldoradogold.com 16
Slide 17: Olympias phased development plan
CONSTRUCTION Phase I (2012 – 2015) • Tailings treatment & re-processing • Mill re-commissioning (720 ktpa) • Underground refurbishment • Sale of AsPy concentrate (~50 koz payable Au/yr) Phase II (2016 – 2017) • Underground mining – existing infrastructure (400-500 ktpa) • Production of AsPy, Pb-Ag a
Slide 18: Olympias Project Highlights
CONSTRUCTION Deposit Type Replacement mixed sulphide Mine Life 22 years Initial Capex ~US $165 million to Phase II UG Production Mining Rate Phase I –Tailings – 720 ktpa Phase II – Underground – 400-500 ktpa Phase III – Underground Expansion – 850 ktpa Gold Phase I – Tailings – 50,000 oz/year Produc
Slide 19: Olympias mill refurbishment
CONSTRUCTION Mill Refurbishment (Complete) Flotation plant roof replaced and buildings refurbished a. Civil works completed Schist Amphibolite Gneiss New power substation installation complete Marble Intrusive Tanks and piping replaced New equipment installed (including filter presses and
Slide 20: Olympias underground workings
CONSTRUCTION Underground Workings Refurbishment of existing Schist Olympias Mine ramp 67% Amphibolite Gneiss complete with 2,337m of Marble 3,500m rehabilitated Intrusive Removal/refurbishment of steel arches and old timber support, rock-bolting and shotcreting (improving ventilation & support)
Slide 21: Skouries Project Highlights
CONSTRUCTION Deposit Type Gold-Copper Porphyry Mine Life 27 years Initial Capex ~US $340 million to plant production from Open Pit Schist Mining Rate 8 Mtpa Open Pit Amphibolite Gneiss 4.4 Mtpa Underground Marble Strip Ratio 0.7 : 1 Intrusive Gold ~140,000 oz Au, ~30,000 t Cu/year Open Pit Productio
Slide 22: Skouries work 2012 and 2013
CONSTRUCTION Work 2012 Site preparation – surface clearing Schist activities and earth moving Amphibolite Gneiss Marble Road access Intrusive Portal excavation Work 2013 Continue construction of Processing Plant Advance Underground development Test geological potential of nearby targets
Slide 23: Perama Hill Project Highlights
DEVELOPMENT Disseminated epithermal gold-silver Deposit Type vein deposit Mine Life 8 years Initial Capex ~US $189 million Mining Rate 1.25 Mtpa Open Pit Strip Ratio 0.35 : 1 Gold Production 110,000 oz/year Silver Production 85,000 oz/year Cash Costs $278/oz (by-product) Processing Conventional CIL
Slide 24: Perama Hill work 2012 and 2013
DEVELOPMENT Drilling at Perama Hill Work 2012 PEIA approved in February 2012 EIA submitted to Ministry of Environment (MoE) in March 2012 under Fast Track Legislation EIA approval anticipated in Q4 2012 Construction decision in Q4 2012/Q1 2013 Work 2013 Approve technical studies with MoE d
Slide 25: Exploration: Piavitsa, Certej, Tanjianshan, Efemcukuru
Piavitsa Certej Tanjianshan Efemcukuru (Greenfield) (Brownfield) (Near Mine) (Near Mine) www.eldoradogold.com 25
Slide 26: Piavitsa exploration potential
Exploration Potential Strategic land position Metallogenic belt with multiple deposit styles within 10km radius Untested targets provide excellent upside potential www.eldoradogold.com 26
Slide 27: Greenfield exploration upside
EXPLORATION - GREENFIELD Excellent upside potential (not in resources) 2012 program testing target horizon on 100m x 200m spaced grid 5 drills currently turning Historical drilling identified massive sulphide zones along Stratoni Fault www.eldoradogold.com 27
Slide 28: Exploration - Greenfield
EXPLORATION - GREENFIELD www.eldoradogold.com 28
Slide 29: Brownfield exploration at Certej
EXPLORATION - BROWNFIELD Over 1.5 million oz added to M&I resource base in 2012 2012 drill holes in Link Zone target cut high- grade gold mineralization West Pit target has high-grade epithermal veins Limited modern exploration in Romania but extensive historical exploration and mining data
Slide 30: Near-mine exploration: Tanjianshan
EXPLORATION – NEAR MINE Drilling programs at Qinglongtan North and Xijingou completed in Q3 Qinglongtan North (QN) Xijingou Several holes at QN intersected strong Several holes from step-out drilling mineralization at Xijingou intersected strong mineralization Possibility of a new high-grade
Slide 31: Near-mine exploration: Efemcukuru
EXPLORATION – NEAR MINE Q3 drilling focused on Kestani Beleni North West Ore Shoot (NWOS), South Ore Shoot (SOS) and Kokarpinar veins 32 drillholes (8,440 metres) were completed and results include: At NWOS: new shallowly northwest-plunging lower zone of mineralization (traced for ~400m along
Slide 32: Exploration - Near Mine
EXPLORATION – NEAR MINE www.eldoradogold.com 32
Slide 33: Background Information
Background Information www.eldoradogold.com 33
Slide 34: Five cornerstone gold mines
Five cornerstone gold mines: Kişladağ Efemçukuru Jinfeng Tanjianshan White Mountain www.eldoradogold.com 34
Slide 35: Kişladağ overview
PRODUCTION OVERVIEW Location Uşak Province, Western Turkey Deposit Gold porphyry Ownership 100% Eldorado Open pit Type Heap leach gold mine Expected Life of Mine 15-20 years Recovery 65% Overview Strip Ratio 1.3:1 Largest gold mine in Turkey Discovered by Eldorado; commercial production began in
Slide 36: Efemçukuru overview
PRODUCTION OVERVIEW Location Izmir Province, Western Turkey Deposit High grade epithermal gold vein Ownership 100% Eldorado Underground gold mine Type Flotation and Carbon in Leach Expected Life of Mine 12 years Recovery 87% Overview RESERVES AND RESOURCES (at Dec 31, 2011) Discovered by Eldorado;
Slide 37: Jinfeng overview
PRODUCTION OVERVIEW Location Guizhou Province, China Deposit Carlin type 82% Eldorado Ownership 18% Guizhou Lannigou Gold Mine Ltd Open pit and underground gold mine Type Biox and Carbon in Leach Expected Life of Mine 13 years Recovery 85% Overview Acquired by Eldorado from Sino Gold in 2009; comm
Slide 38: Tanjianshan overview
PRODUCTION OVERVIEW Location Qinghai Province, China Deposit Orogenic 90% Eldorado 5% First Institute of Geology and Ownership Mineral Exploration of Qinghai Province 5% Dachaidan Gold Mine Open pit gold mine Type Float roast Carbon in Leach Expected Life of Mine 5 years Recovery 81% Overview Strip
Slide 39: White Mountain overview
PRODUCTION OVERVIEW Location Jilin Province, China Deposit Orogenic 95% Eldorado Ownership 5% Jilin Tonghua Institute of Geology and Minerals Exploration and Development Underground gold mine Type Carbon in Leach plant Expected Life of 9 years Mine Overview Recovery 80% Acquired by Eldorado from S
Slide 40: Vila Nova iron ore overview
PRODUCTION OVERVIEW Location Amapa State, Brazil Ownership 100% Eldorado Type Open pit iron ore mine Expected Life of Mine 9 years RESERVES AND RESOURCES (at Dec 31, 2011) Overview Commercial production began in 2011 Proven + Probable Reserves 8.9 Mt @ 60.9% Fe 2012 Objectives Measured + Indicated
Slide 41: Stratoni overview
PRODUCTION OVERVIEW Location Chalkidiki Peninsula, Northern Greece Deposit Replacement mixed sulphide 95% Eldorado Ownership 5% Aktor SA Underground drift and fill Type Multi-stage flotation Expected Life of Mine 5 years RESERVES AND RESOURCES (Source: European Goldfields) 10 Moz Ag @ 177 g/t Proven
Slide 42: Six key development projects
Six key development projects: Olympias Skouries Perama Hill Eastern Dragon Certej Tocantinzinho www.eldoradogold.com 42
Slide 43: Olympias overview
CONSTRUCTION OVERVIEW Chalkidiki Peninsula, Location Northern Greece Polymetallic gold, silver, Deposit lead and zinc 95% Eldorado Ownership 5% Aktor SA Underground mine Type (previously mined using underground drift and fill) Estimated Development Capital US$207 million (2012-2016) Production (Tail
Slide 44: Skouries overview
CONSTRUCTION OVERVIEW Chalkidiki Peninsula, Northern Location Greece Deposit Gold-copper porphyry 95% Eldorado Ownership 5% Aktor SA Type Open pit and underground Strip Ratio (open pit) 0.7 : 1 Estimated Development US$415 million Capital (2012-2016) Overview Production Expected 2015 Environmental
Slide 45: Perama Hill overview
DEVELOPMENT OVERVIEW Eastern Thrace, northern Location Greece Epithermal gold-silver vein Deposit deposit Ownership 100% Eldorado Type Open pit gold mine Expected Life of Mine 8 years 90% (Gold) Expected Recovery 60% (Silver) Estimated Development Capital US$189 million (2012 – 2014) Production Expe
Slide 46: Eastern Dragon overview
DEVELOPMENT OVERVIEW Location Heilongjiang Province, China Deposit High-grade, epithermal, gold-silver vein 95% Eldorado Ownership 5% County (Daxinglanling Yihua Development Company Ltd) Open pit and underground gold mine, Type CIL plant under construction Expected Life of Mine 7 years Expected Reco
Slide 47: Certej overview
DEVELOPMENT OVERVIEW “Golden Quadrilateral” area Location of the Apuseni Mountains, Western Romania Epithermal gold-silver Deposit deposit Ownership 80% Eldorado Open pit Type (Previously mined via shallow open pit) Expected Life of Mine 12 years Estimated Development Capital US$270 million (2012-20
Slide 48: Tocantinzinho overview
DEVELOPMENT OVERVIEW Tapajos district, Para State, Location central Brazil Shallow, intrusion-hosted, Deposit non-refractory gold deposit Ownership 100% Eldorado Type Open pit gold mine Expected Life of Mine 11 years Estimated Development Capital US$383 million (2012 – 2016) Overview Production Expe
Slide 49: 2012 exploration budget
2012 Exploration budget: US$81 million; 190,000 meters of drilling Romania ($4m) 3 projects 14,000 meters Vancouver (Head Office) ($2.5m) Greece ($13m) 5 projects 48,000 meters Turkey ($15m) China ($28m) 8 projects 17 projects 34,000 meters 82,000 meters Brazil ($16m) 3 projects
Slide 50: Expanding Margins
Expanding Margins 1,800 Eldorado’s strategic focus is on 1,600 being a low-cost operator of high- 1,400 quality assets 1,200 (US$/oz) $1,165 1,000 $1,110 800 Maintained cash costs between $800 $658 600 $200 - $500/oz for past 10 years $279 $411 $587 400 200 This has returned healthy margins 0
Slide 51: Reserves and resources by project
Proven & Probable Measured & Indicated Inferred Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (x1000) (Au g/t) (x1000) (x1000) (Au g/t) (x1000) (x1000) (Au g/t) (x1000) Kisladag 459,870 0.71 10,516 579,860 0.65 12,055 380,760 0.40 4,921 Efemcukuru 5,023 9.13 1,475 5,426 9.57 1,670 2,52
Slide 52: Consensus Metal Price Forecasts
Consensus Metal Price Forecasts Metal Unit 2012 2013 2014 2015 2016 2017 Long-term Gold US$/oz 1,669 1,733 1,644 1,517 1,424 1,373 1,325 Silver US$/oz 35.30 33.13 28.21 25.88 25.62 21.75 21.75 Copper US$/lb 3.83 4.01 3.66 3.38 2.84 2.63 2.59 Lead US$/t 2,226 2,380 2,446 2,446 2,182 2,072 1,895 Zinc
Slide 53: Thank You
Thank You TSX: ELD NYSE: EGO Total shares outstanding (as at Sept 30, 2012): 713.6 M Investor Relations: Nancy Woo (604) 601-6650 ⋅ nancyw@eldoradogold.com www.eldoradogold.com 53