Cerro De Pasco Resources, Inc. · TSXV:CDPR

Cerro De Pasco Resources — Investor Presentation (September 2025)

18 slides from Cerro De Pasco Resources's investor presentation, September 2025

  1. Slide 1: Positioned to Unlock the Value of the World's Largest Above-Ground Metal Resource

    TSXV: CDPR OTC: GPPRF BVL: CDPR FRA: N8HP Positioned to Unlock the Value of the World’s Largest Above-Ground Metal Resource

  2. Slide 2: Forward-Looking Statements

    01 FORWARD-LOOKING STATEMENTS Certain statements contained in this presentation constitute “forward update or revise any forward-looking statement, whether as a result of economic viability, but do have reasonable prospects for economic looking information” or “forward-looking statements” under Cana

  3. Slide 3: El Metalurgista Concession & Social License

    02 EL METALURGISTA CONCESSION & SOCIAL LICENSE One of the Largest Above-Ground Metal Resources In the World TSXV: CDPR OTC: GPPRF BVL: CDPR FRA: N8HP 3

  4. Slide 4: El Metalurgista Concession & Social License

    02 EL METALURGISTA CONCESSION & SOCIAL LICENSE Excelsior Mineral Pile PROCESSING PLANTS 18K TPD permitted Not owned by CDPR Quiulacocha Tailings TSXV: CDPR OTC: GPPRF BVL: CDPR FRA: N8HP 4

  5. Slide 5: Quiulacocha Tailings

    03 QUIULACOCHA TAILINGS Historical Estimate AVERAGE HEAD GRADE AND RECOVERY Tonnes Mining Period (000s) Cu Pb Zn Ag Au Copper Era (1906-1965) 16,369 4.0% – – 200 g/t 3.0 g/t Gold Polymetallic Era (1952-1992) 58,299 – 3.3% 8.6% 98 g/t – 12% Average Recovery – 60% 60% 75% 60% 60% Silver ESTIMATED AVER

  6. Slide 6: Historic Easement

    04 HISTORIC EASEMENT Land Easement Secured In May 2024, Cerro de Pasco Resources received a Supreme Resolution granting access to the El Metalurgista Concession for a 40-hole drilling campaign. Formalities Completed On May 29, 2024, Cerro de Pasco Resources finalized necessary steps— including a pay

  7. Slide 7: Quiulacocha Tailings / Phase 1 Drilling

    05 QUIULACOCHA TAILINGS / PHASE 1 DRILLING Sonic Drill, provides continuous, high-quality samples with minimal disturbance and no water usage, reducing environmental impact, enhancing resource recovery, and improving data quality. TSXV: CDPR OTC: GPPRF BVL: CDPR FRA: N8HP 7

  8. Slide 8: Quiulacocha Tailings / Phase 1 Drilling

    05 QUIULACOCHA TAILINGS / PHASE 1 DRILLING Freezer truck on-site to preserve micro- structural integrity and prevent oxidation. TSXV: CDPR OTC: GPPRF BVL: CDPR FRA: N8HP 8

  9. Slide 9: Quiulacocha Tailings / Phase 1 Assay Results

    06 QUIULACOCHA TAILINGS / PHASE 1 ASSAY RESULTS Recent Drilling 40 out of 40 drillholes assayed. Average Grade per Metal Metal Avg. Grade Ag 1.66 oz/t Zn 1.47% Pb 0.89% 4.3 oz/t AgEq* 5.5 oz/t Cu 0.09% AgEq* Reported Drillholes Au 0.10 g/t Ag-Zn-Pb Tailings Ga 53.2 g/t Ag-Cu-Au Tailings In 19.9 g/t

  10. Slide 10: Why Gallium - Highlights

    07 WHY GALLIUM - HIGHLIGHTS A Critical Metal Powering Technology & the Energy Transition The U.S. is 100% reliant on foreign gallium imports. In 2023, China banned gallium exports, posing a serious risk to national security and U.S. economic resilience. Discovery of the largest above-ground gallium

  11. Slide 11: U.S. Department of Defense & Gallium

    08 U.S. DEPARTMENT OF DEFENSE & GALLIUM The Pentagon, which has reserves of germanium but not gallium, plans to use its authority under the Defense Production Act for “prioritizing awards” by Dec.31, “focusing on recovery of gallium from existing waste streams or other products,” spokesman Jeff Jurg

  12. Slide 12: Quiulacocha TSF Potential Economics

    09 QUIULACOCHA TSF Potential Economics Based on Internal Projections Metal Grade Price Value/Tonne Ag 1.86 oz/t $30 $56 Zn 1.15% $3,000 $34 Base Case Scenario 10k Tonnes/Day Pb 0.69% $2,000 $14 In-situ Value/Tonne 100% $169 NSR/Tonne (+) $49 Cu 0.42% $9,000 $38 Avg. Metal Recovery of 40% (x) 40% $68

  13. Slide 13: 2025 Catalysts

    10 2025 CATALYSTS 1. Phase 1 drillholes (completed) 2. Mineralogical studies (ongoing) 3. Metallurgical studies (ongoing) 4. Formalization of claim on surrounding tailings (ongoing) 5. Expanded Phase 2 drilling program on the Cu-Ag-Au tailings 6. Completion of various site scoping studies: Geotechni

  14. Slide 14: Moving Quiulacocha Tailings by Pump Pontoon

    11 MOVING QUIULACOCHA TAILINGS BY PUMP PONTOON How Submersible Pumps on Barges Extract Tailings Pump Setup: A submersible slurry pump is mounted under a floating barge and fully submerged in the tailings. Operation: The pump agitates and sucks up slurry (water + solids), pushing it through a floatin

  15. Slide 15: Cerro de Pasco Post Closure

    12 CERRO DE PASCO POST CLOSURE Artistic Rendering TSXV: CDPR OTC: GPPRF BVL: CDPR FRA: N8HP 15

  16. Slide 16: Corporate Overview

    13 CORPORATE OVERVIEW LEGEND 1. CDPR receives green light on Land easement. 2. Land easement officially granted. 3. Eric Sprott acquires a substantial stake in the company. 4. Historic authorization granted—drilling program begins. 5. Assay Results from 1st DHs. 6. Significant increase in Ga levels.

  17. Slide 17: Management Team & Board of Directors

    14 MANAGEMENT TEAM & BOARD OF DIRECTORS STEVEN ZADKA GUY GOULET MANUEL RODRIGUEZ JAMES CARDWELL EXECUTIVE CHAIRMAN EXECUTIVE DIRECTOR & CEO EXECUTIVE DIRECTOR & PRESIDENT CHIEF FINANCIAL OFFICER Founding partner of CDPR with over Over 30 years of investment More than 30 years of management CPA-crede

  18. Slide 18: www.pascoresources.com

    WA Pasco RESOURCES WWW.PASCORESOURCES.COM

Cerro de Pasco Resources — Investor Presentation (September 2025) on 6ix