Integrated Wind Solutions Asa · DUS:9UG1

Integrated Wind Solutions Asa — Investor Presentation (March 2021)

30 slides from Integrated Wind Solutions Asa's investor presentation, March 2021

  1. Slide 1: Integrated Wind Solutions Investor Presentation

    Integrated Wind Solutions March 2021 | Investor Presentation Strictly Private & Confidential This document is for the use of the recipient only and should not be copied or distributed to any other person or entity. Please refer to important disclosures at the beginning of this presentation.

  2. Slide 2: Disclaimer and Important Information (I/II)

    DISCLAIMER AND IMPORTANT INFORMATION (I/II) This presentation (the "Presentation") has been prepared by Integrated Wind Solutions AS (the "Company" and together with its subsidiaries the "Group"), with the assistance of ABG Sundal Collier AS, Clarksons Platou Securities AS and Fearnley Securities AS

  3. Slide 3: Disclaimer and Important Information (II/II)

    DISCLAIMER AND IMPORTANT INFORMATION (II/II) This Presentation does not constitute an offer of, or an invitation to purchase, any of the shares in any jurisdiction in which such offer or sale would be unlawful. This Presentation does not constitute or form part of any public offer of securities and

  4. Slide 4: Today's Presenters

    TODAY’S PRESENTERS Lars Henrik Røren Christopher Andersen CEO Heidenreich COO 4

  5. Slide 5: Becoming the Leading Pure Play Offshore Wind Service Company

    BECOMING THE LEADING PURE PLAY OFFSHORE WIND SERVICE COMPANY Ordering two vessels with option to Strategic acquisitions and organic order four additional vessels growth of complementary services to targeting blue chip customers and construction and/or operations phase long-term contracts of windfarm

  6. Slide 6: Deal Structure and Use of Proceeds

    DEAL STRUCTURE AND USE OF PROCEEDS Key transaction details ▪ EUR ~20m of the proceeds from Order two purpose the private placement will be used Issuer ▪ Integrated Wind Solutions AS built offshore wind to fund two purpose built offshore service vessel wind service vessels with planned ▪ NOK ~750m, o

  7. Slide 7: Integrated Wind Solutions | To Be a Fully Integrated Provider of Offshore Wind Services

    INTEGRATED WIND SOLUTIONS | TO BE A FULLY INTEGRATED PROVIDER OF OFFSHORE WIND SERVICES Offshore wind is an essential part of ‒ Offshore wind is at the frontiers of the energy transition with expected installed capacity of ~250 GW by 1 the energy transition needed to achieve 2030 globally as leveliz

  8. Slide 8: Offshore Wind Needs to Grow Fast to Reach Green Deal Target of Net Zero

    OFFSHORE WIND NEEDS TO GROW FAST TO REACH GREEN DEAL TARGET OF NET ZERO BY 2050 Drivers European renewable generation1 Continued upward revisions of estimates2 The European energy mix is set for a TWh Offshore Wind, Cumulative Capacity (GW) ~5,750 significant change in the coming 300 decades in orde

  9. Slide 9: IWS Targeting Above 50% of a Windfarm's Value Chain

    IWS TARGETING ABOVE 50% OF A WINDFARM’S VALUE CHAIN Installation / Operations and Decommissioning Development Turbine supply Balance of Plant Commissioning maintenance ▪ Planning, engineering, ▪ Components and assembly ▪ All non-turbine ▪ All installation and ▪ Support the ongoing ▪ Decommissioning

  10. Slide 10: Operations and Maintenance Market Expected to Grow Significantly

    OPERATIONS AND MAINTENANCE MARKET EXPECTED TO GROW SIGNIFICANTLY – VESSEL HIRE ONLY A MINOR PART Annual O&M spending1,2 <(EURbn) Vessel hire only minor part of total O&M spending 3,4 8.0x Vessel hire Other O&M Spending 18.6 ~20% ~80% Integrated services 2.4 ~EUR 0.20bn turnover for each % market sha

  11. Slide 11: Offshore Services Compatible with Use of C/SOV

    OFFSHORE SERVICES COMPATIBLE WITH USE OF C/SOV Wind Turbine Generator • Mechanical/Electrical service • Blade inspections and repair (drone) • Tower inspection and repair Balance of Plant above water line • Utility systems inspections and repairs • Structural inspections • Corrosion protection • Saf

  12. Slide 12: Integrated Wind Solutions Positioned to Take Advantage of the Strong Market Backdrop

    INTEGRATED WIND SOLUTIONS POSITIONED TO TAKE ADVANTAGE OF THE STRONG MARKET BACKDROP Integrated Wind Solutions Vessels Services #1 #2 Option vessel #1 Option vessel #2 Option vessel #3 Option vessel #4 Potentially acquire or develop a firm providing engineering, manpower and services in the construc

  13. Slide 13: Perfect Timing for Entry to the C/SOV Market

    PERFECT TIMING FOR ENTRY TO THE C/SOV MARKET The market needs newbuilds… …as supply is restrained Tier 1 supply Total wind demand international (Europe, Taiwan, Rest of Apac ex. China) 160 Tier 2 supply • Need additional vessel to meet demand in near term future 151 134 137 • Difficult for large, tr

  14. Slide 14: Attractive Cash Flow Yield

    ATTRACTIVE CASH FLOW YIELD Annual net cash flow per vessel Day rates for large CSOV’s Tier 1 & 21 Annual EBITDA per vessel at various dayrates2 at various dayrates2, 3 Historic day rates Forecasted rates Implied EV/EBITDA per vessel Implied cash flow yield per vessel 39k 14.1x 9.1x 6.7x 5.3x 4.4x 3%

  15. Slide 15: Purpose Built Offshore Wind Newbuilds Offer a Multitude of Benefits

    PURPOSE BUILT OFFSHORE WIND NEWBUILDS OFFER A MULTITUDE OF BENEFITS COMPARED TO EXISTING VESSELS Several tangible benefits from purpose built… …resulting in significantly lower opex1 EUR/day ~19,500 New vessels with lower risk and cost of capital compared to older vessels with conversion risk and fu

  16. Slide 16: The Majority of Tier 1 Vessels Is Locked in on Long-Term Contracts

    THE MAJORITY OF TIER 1 VESSELS IS LOCKED IN ON LONG- TERM CONTRACTS 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Owner Status Vessel Name Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Bibby Marine Active Bibby Wavemaster

  17. Slide 17: Vessel Design Providing Flexibility with High Operability

    VESSEL DESIGN PROVIDING FLEXIBILITY WITH HIGH OPERABILITY The motion compensated gangway can be adjusted between A 12-30 meters in height to access all turbine platforms, both floating and bottom-fixed, and regardless of turbine size A Vessel Design Dedicated motion compensated 3d “colibri” crane fo

  18. Slide 18: Vessel Design Enabling Low-Carbon Footprint

    VESSEL DESIGN ENABLING LOW-CARBON FOOTPRINT Energy-saving technology Plug-in hybrid Optionality for zero-emission On-site charging ✓ Digital twin developed for improved ✓ Plug-in hybrid solution with batteries and ✓ Ready for all-electric operation using operational decision support combustion engin

  19. Slide 19: Building at a Reputable Yard with Robust Track-Record and at Attractive Terms

    BUILDING AT A REPUTABLE YARD WITH ROBUST TRACK- RECORD AND AT ATTRACTIVE TERMS Ordering from a reputable yard… …offering first-class vessels at competitive prices ▪ CMHI is the 4th largest shipyard group in EURm New build cost per vessel China, located in Haimen, Jiangsu 67 Background ▪ Extensive ex

  20. Slide 20: Clear Near-Term Contracting Focus and a Well-Established Strategy for the Future

    CLEAR NEAR-TERM CONTRACTING FOCUS AND A WELL- ESTABLISHED STRATEGY FOR THE FUTURE EBITDA Near-term contracting strategy ▪ Currently working on tenders for construction and commissioning phases ▪ Active dialogues with potential clients to secure contracting of tonnage B Services Longer-term strategy

  21. Slide 21: Coupling Decades of Maritime Heritage and Knowledge with Offshore Wind Competencies

    COUPLING DECADES OF MARITIME HERITAGE AND KNOWLEDGE WITH OFFSHORE WIND COMPETENCIES Long track-record within shipping and offshore + Strong in-house capabilities 1939 Awilco AS is established Extensive experience in successfully delivering on newbuild projects in Asia on time and cost with own site-

  22. Slide 22: Management Team with Extensive Experience Backed by a Board with Deep Industry Roots

    MANAGEMENT TEAM WITH EXTENSIVE EXPERIENCE BACKED BY A BOARD WITH DEEP INDUSTRY ROOTS Management team Board of Directors Lars-Henrik Røren – Chief Executive Officer Sigurd Einar Thorvildsen – Chairman of the Board ▪ +30 years of experience from the Investment Banking and Asset ▪ CEO of the Awilhelmse

  23. Slide 23: Company Structure

    COMPANY STRUCTURE Management agreement Awilhelmsen Integrated Wind for corporate services Management AS Solutions AS 100% Awilco Management agreement for technical services Technical Awind AS Services Services AS 100% 100% 100% 100% 97% 100% 3% Awind 1 AS Awind 2 AS Awind 3 AS Awind 4 AS Awind 5 AS

  24. Slide 24: Integrated Wind Solutions Aims to Deliver Highly Attractive and Sustainable Risk-Adjusted Returns

    INTEGRATED WIND SOLUTIONS AIMS TO DELIVER HIGHLY ATTRACTIVE AND SUSTAINABLE RISK-ADJUSTED RETURNS Ordering two vessels with option to Strategic acquisitions and organic order four additional vessels growth of complementary services to targeting blue chip customers and construction and/or operations

  25. Slide 25: Appendix

    = Integrated SWind 7 Solutions

  26. Slide 26: Vessel Specifications for the Vessels in Order

    VESSEL SPECIFICATIONS FOR THE VESSELS IN ORDER Overview of vessel specifications by category Vessel design ▪ Kongsberg Maritime 3D compensated ▪ Step/less approach from packing area to the wind turbine gangway ▪ Reach heigh min-max (m): 10 – 32 ▪ Max capacity (mT): 25 3D compensated ▪ AHC offshore c

  27. Slide 27: Vessel Definitions

    VESSEL DEFINITIONS SPECIALIZED WIND SERVICE VESSELS NON SPECIALIZED VESSELS Tier 1: CSOV / SOV CTV Tier 2: Converted offshore vessels Typical O&G subsea tonnage with SPS code • Vessels originally intended for O&G industry but converted by installing fixed gangways Construction Service Operation Serv

  28. Slide 28: Evolution of Offshore Wind Transportation

    EVOLUTION OF OFFSHORE WIND TRANSPORTATION Crew Transfer Vessel (CTV) Helicopter CTV + Moored floating hotel 1 2 3 Offshore vessel with temporary gangways (TIER 3) Offshore vessel with fixed gangway (TIER 2) Purpose built Walk-to-Work vessel (TIER 1) 4 5 6 28

  29. Slide 29: Offshore Wind Opportunities Is a Global Play, but Europe Is Leading

    OFFSHORE WIND OPPORTUNITIES IS A GLOBAL PLAY, BUT EUROPE IS LEADING Installed capacity Europe (GW) by 2030E >110 China >60 N. America Asia ex. China >15 >50 Oceania S. America >2 >3 29 Source: Rystad Energy ; The Company

  30. Slide 30: A Growing Installed Base Will Drive a Substantial Increase in Number of Turbines

    A GROWING INSTALLED BASE WILL DRIVE A SUBSTANTIAL INCREASE IN NUMBER OF TURBINES Number of offshore turbines Comment 40,000 +4.8x Currently ~7,300 offshore wind turbines installed on a 35,000 global basis • ~5,300 (~73%) in Europe 30,000 • ~2,300 (~32%) installed +40km from shore 25,000 Expected to

Integrated Wind Solutions — Investor Presentation (March 2021) on 6ix