Hudbay Minerals Inc · TSX:HBM

Hudbay Minerals — Corporate Update (December 2009)

10 slides from Hudbay Minerals's corporate update, Dec 17, 2009

  1. Slide 1: HudBay Minerals – Lalor Project Update

    Strength to Build the Future HudBay Minerals – Lalor Project Update December 17, 2009 1

  2. Slide 2: Forward-looking statements

    Forward-looking statements All monetary amounts in Canadian dollars unless otherwise noted. Certain statements made at this meeting and in this presentation contain “forward-looking information”, within the meaning of applicable Canadian securities legislation. Forward-looking information includes,

  3. Slide 3: Lalor Project Update – December 17, 2009

    3 Lalor Project Update – December 17, 2009

  4. Slide 4: Lalor Project Update – December 17, 2009

    4 Lalor Project Update – December 17, 2009

  5. Slide 5: Lalor Project Update – December 17, 2009

    5 Lalor Project Update – December 17, 2009

  6. Slide 6: Lalor mineralization zones

    Zinc rich sulphide Hanging wall remobilized gold mineralization Footwall gold – copper lead mineralization Copper – gold mineralization 6 Lalor Project Update – December 17, 2009

  7. Slide 7: Lalor long section: base metal resource and gold potential

    500m 10 Zi Cl 750m 11 nc as R sic ich VM 31 S 20 Mi 30 ne Au ra +- liz Cu at 24 ion Pb Tr 21 Ri en ch d 1000m 25 Co 40 26 pp er -G Base Metal Resource 27 ol d Ri ch Gold Potential Mineralization 1250m 0m 250m Looking N70oW 7 Lalor Project Update – December 17, 2009

  8. Slide 8: Keys to future exploration success

    Keys to future exploration success • Exploration budget $41.7M with $6.8 for Chisel Basin. • Right place – Chisel Basin in Flin Flon Greenstone Belt • Exploration expertise and track record • Discovery of the Copper-Gold zone 8 Lalor Project Update – December 17, 2009

  9. Slide 9: Summary

    Summary • Copper Gold zone open down plunge. • Ramp development has begun from Chisel North to Lalor. • Pre-feasibility study is well underway. • Regional exploration activity will be increased for 2010. 9 Lalor Project Update – December 17, 2009

  10. Slide 10: Strength to Build the Future

    Strength to Build the Future For more information contact: John Vincic, VP of IR and Corporate Communications Tel: 416.362.0615 Email: john.vincic@hudbayminerals.com 10

HudBay Minerals — Corporate Update (December 2009) on 6ix