Mondelez International, Inc. · NASDAQ:MDLZ

Mondelez International — Webinar 2: New Tier 0 Copacker Food Safety Requirements in the 2024 CPQE Update

94 slides from Mondelez International's conference presentation, April 2024

  1. Slide 1: Webinar: New Tier 0 Copacker Food Safety Requirements in the 2024 CPQE Update

    2 WEBINAR: NEW TIER 0 COPACKER FOOD SAFETY REQUIREMENTS IN THE 2024 CPQE UPDATE We will be providing a review of the new Food Safety Requirements for Tier 0 Co-Packers found in the 2024 Update. We will cover the following sections: • Extraneous Matter • Hygienic Zoning and PEM • Pest Control / Sanit

  2. Slide 2: Attendance Tracker

    ATTENDANCE TRACKER Co-Packer Quality Expectations 2024 Training Attendance Tracker

  3. Slide 3: Topics Covered in This Webinar

    TOPICS COVERED IN THIS WEBINAR Introductions & Webinar Agenda – Ellen Deogracias Extraneous Matter – Dave Lillie (30 mins) Hygienic Zoning and Environmental Monitoring – Chris Baylis (25 mins) Sanitation Control / Pest Control / GMP – Jitendra Rai (25 mins) Food Allergen Control – Marta Palac (10 mi

  4. Slide 4: Webinar List for CPQE 2024 Update – For MDLZ Employees Only

    WEBINAR LIST FOR CPQE 2024 UPDATE – FOR MDLZ EMPLOYEES ONLY March Introduction to Copacker Quality Expectation 2024 Updates (Calendar invites attached) S M T W T F S Description: 1 hour session covering general changes of the 2024 Update 1 2 Dates: Session 1: MEU – Tues March 19; 12 pm GMT, 7 am ET

  5. Slide 5: Webinar List for CPQE 2024 Update – For Co-Packer Attendees

    WEBINAR LIST FOR CPQE 2024 UPDATE – FOR CO-PACKER ATTENDEES March Introduction to Copacker Quality Expectation 2024 Updates S M T W T F S Description: 1 hour session covering general changes of the 2024 Update 1 2 Dates: Session 1: MEU – Tues March 26; 12 pm GMT/ 7 am ET Session 2: AMEA – Wed March

  6. Slide 6: Regional Contacts

    REGIONAL CONTACTS • Ellen Deogracias – Global External Quality • Andrea Marques – Global External Quality • Sue Bayley – Global Logistics Operations • Mariya Krepsova – MEU Quality • Guillermo Perez Arias – MEU CS&L • Daniela Bondarencu – amea quality • Gisele Marcondes – LA Commercial Quality • Bru

  7. Slide 7: Implementation Dates

    IMPLEMENTATION DATES 2025 march 1 • 6.10 Hygienic Zoning and Environmental Monitoring (For T0 only) 2024 July 1 • 6.10.2.1 All low moisture foods (Aw<0.6) now require PEM. • 6.10.4.1 New requirement for EB testing weekly, Zone 2 • 6.11 Food Allergen Control and Labelling − 6.11.1.4 All copacker tier

  8. Slide 8: Extraneous Matter Plan Focus on Co-Packers T-0

    EXTRANEOUS MATTER PLAN FOCUS ON CO-PACKERS T-0 Dave Lillie – SME Extraneous Matter

  9. Slide 9: What Has Changed?

    WHAT HAS CHANGED? - New requirement for an Extraneous Matter Control Plan based on risk assessment. - This covers all sources of foreign bodies throughout the entire process and goes beyond HACCP which is based on food safety. - New requirement for a list of all glass and plastic items in processing

  10. Slide 10: Extraneous Matter Control Plan Is an Overview of All Your Controls

    EXTRANEOUS MATTER CONTROL PLAN IS AN OVERVIEW OF ALL YOUR CONTROLS Prerequisite Programs GMP’s Preventive Maintenance EXTRANEOUS • Control of Wooden Pallets Program MATTER CONTROL • Control of Glass and Plastics • Gasket Controls PLAN • Maintenance activity line • Hair coverings… clearance • Uniform

  11. Slide 11: Extraneous Matter 2014 CPQR 7.5-02 vs New 2024

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 6.14 Extraneous Matter 1. Risk Assessment. • 6.14.1 - Establishment of the Extraneous Matter Control Plan 1.1 Each facility shall have a documented • 6.14.1.1 - Sites shall document an Extraneous Matter Control Plan program in place

  12. Slide 12: 6.14 Extraneous Matter Continued

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 6.14 Extraneous Matter Continued • 6.14.1.3 - The risk assessment shall cover all sources of foreign body through 1. Risk Assessment. the entire process (foreign body mapping) that could potentially get into finished product. The fo

  13. Slide 13: 6.14 Extraneous Matter Continued

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 6.14 Extraneous Matter Continued • 6.14.1.5 - The EMC plan shall define and document the monitoring and 1. Risk Assessment. verification frequency for all Extraneous Matter Control Devices in place (examples; Magnets, Metal Detector

  14. Slide 14: Steps of the Process for a Successful EMC Plan

    Steps of the Process for a successful EMC Plan So first conduct an extraneous body mapping exercise Who should be involved in this? It should be the site activity – each of the Identify different team’s members have a key input to this process So, our maintenance people will know about equipment? ye

  15. Slide 15: Identification

    IDENTIFICATION Let me take you through how you can do the Extraneous Matter Mapping • The sources of extraneous matter associated with the supply chain must be evaluated including: – Potential extraneous matter coming from ingredients – Potential extraneous matter coming from the line and equipment,

  16. Slide 16: Extraneous Matter Mapping

    EXTRANEOUS MATTER MAPPING These are some areas to think about • Pens Hair People • Plastic Gloves • Jewellery • Perspex Covers Identify Premises • Metal Racking • Damaged Walls • Nuts and Screws Prevent Plant • Maintenance tapes Contamination • Frayed Belt • String Packaging • Hard Plastic Crates El

  17. Slide 17: Prevent Contamination / Elimination and Reduction

    PREVENT CONTAMINATION / ELIMINATION AND REDUCTION Based on the mapping of extraneous matter sources, a critical evaluation shall be done to identify where changes in the process could be done to eliminate the generation and prevent the hazard to reach the product This shall consider hygienic equipme

  18. Slide 18: Prevent Contamination / Elimination and Reduction

    Plant: PREVENT CONTAMINATION / ELIMINATION AND REDUCTION Prepared by: Date: Foreign Body Mapping on the line Potential FB coming from Environment as identified Are controls in place to investigate/ eliminate / Are controls in place to eliminate / indicate FB from plant activities such as: Documented

  19. Slide 19: Prevent Contamination / Elimination and Reduction

    PREVENT CONTAMINATION / ELIMINATION AND REDUCTION

  20. Slide 20: Extraneous Matter 2014 vs 2024: Glass and Plastics

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 2. Light Fittings, Other Glass & Hard/Brittle Plastics 6.14 Extraneous Matter Continued 2.1 Glass components shall be avoided. If glass is • 6.14.1.6 - Production sites shall ensure all parts of new, modified, and/or used, a risk as

  21. Slide 21: Extraneous Matter 2014 vs 2024: Detection Devices

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 3. Usage and Placement of Extraneous Matter Detection Devices. • 6.14.2 Extraneous Matter Detection and Separation Control Devices These requirements are mandatory for line installations after 01 Jan 2008 and • 6.14.2.1 - Sites shal

  22. Slide 22: Extraneous Matter Detection Devices Continued

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 • 6.14.2 Extraneous Matter Detection and Separation Control Devices 3. Usage and Placement of Extraneous Matter Detection Devices. Cont. 3.3 For other extraneous matter risks, a documented risk assessment must be Continued performed

  23. Slide 23: Detection Capability and Operating Requirements

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 • 6.14.3 Validating and Executing the Extraneous Matter Control and 4. Extraneous Matter Detection Capability & Operating Requirements. 4.1 At minimum metal detection units shall be capable of detecting and rejecting Management Plan

  24. Slide 24: Detection Capability and Operating Requirements Cont.

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 • 6.14.3 Validating and Executing the Extraneous Matter Control and 4. Extraneous Matter Detection Capability & Operating Requirements. – Cont. 4.7 For end of line detection of packages, cartons and cases, the test pieces shall be M

  25. Slide 25: Detection Capability and Operating Requirements Cont.

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 • 6.14.3 Validating and Executing the Extraneous Matter Control and 4. Extraneous Matter Detection Capability & Operating Requirements. – Cont. Management Plan – Cont. Routine monitoring/verification of devices, shall take place at

  26. Slide 26: Detection Capability and Operating Requirements Cont.

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 • 6.14.3 Validating and Executing the Extraneous Matter Control and 4. Extraneous Matter Detection Capability & Operating Requirements. – Cont. Management Plan – Cont. • 6.14.3.3 -Where a reject mechanism is used, it shall divert 10

  27. Slide 27: Detection Capability and Operating Requirements Cont.

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 • 6.14.3 Validating and Executing the Extraneous Matter Control and 4. Extraneous Matter Detection Capability & Operating Requirements. – Cont. Management Plan – Cont. • 6.14.3.7 - Sites shall review the Extraneous Matter Control Pl

  28. Slide 28: New: Validating the Extraneous Devices, Metal Detectors and X-Ray

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 • NEW: Validating the Extraneous Devices, Metal Detectors and X-Ray None • The next few slides will review how this is performed to assure optimum capability for Mondelēz products that are packaged.

  29. Slide 29: MD and X-ray Validation

    MD and X ray Validation A validation is required for all metal detectors or X-ray devices. Lets go through it Can be used for single pack, bulk products, throat or gravity fall Metal Detectors and X-Ray Frequency : • Prior to first production/ commercialization, ideally during installation • Post ma

  30. Slide 30: Validation Protocol Part A: Establishing the Right Sensitivity

    VALIDATION PROTOCOL PART A : ESTABLISHING THE RIGHT SENSITIVITY ENSURE STEP 2 •10 passes are successful •If “No" is recorded when (= Yes), pass smaller test • Start with target pieces •Pass 10 times each test passing largest pieces, piece 10 times & evaluate Optimal settings for on which the device

  31. Slide 31: Filling the Format

    FILLING THE FORMAT Test piece type Ferrous Test piece type _Non Ferrous] Test piece type: SS Comments, if any la5mm [1.2mm [1.00mm [2.0mm [18mm [1.6mm First part of Validation protoco Second part of Validation protocol aR 25mm [2.0mm [1.8mm Yes = Detected& Rejected No= Detected & Not Rejected or Not

  32. Slide 32: Filling the Format

    ator Test piece type Ferrous Test piece type __NonFerrous| Test piece type: Comments, if any 25mm [1.2mm [1.00mm_ [2.0mm [18mm [1.6mm _ |2.5mm_ [2.0mm 8 1 Yes jc Yes Yes. Yes Yes Yes 3 2 ves Yes Yes Yes Yes Yes Yes FILLING THE a 3 Yes Yes Yes Yes Yes Yes Yes § 4 Yes Yes Yes ves [NNN ves Yes FO R M A

  33. Slide 33: Determining FRR & POD

    Determining FRR & POD Add a further 20 pieces from the smallest test contaminant, evenly distributed in X quantity of foreign body free product - Use standard line speed and product flow Determination of X : For bulk : Identify the finished product weight (gms or kg) in each SKU. Multiply FP product

  34. Slide 34: POD & FRR Calculations

    POD & FRR CALCULATIONS The POD limit is defined by the smallest dimension achieving a POD of 30/30 (detected & rejected) POD Calculation:- POD = 100 × Correctly Rejected Test Samples Total Test Samples w/ contaminants Inspected Measured during production by adding/ not adding known amount of contami

  35. Slide 35: POD & FRR Calculation Examples

    POD & FRR CALCULATION EXAMPLES The POD limit is defined by the smallest dimension achieving a POD of 30/30 (detected & rejected) POD Calculation:- POD = 100 × Correctly Rejected Test Samples Total Test Samples w/ contaminants Inspected # of rejected products 30 # of rejected products 20 # of correct

  36. Slide 36: POD & FRR Calculation Examples

    POD & FRR CALCULATION EXAMPLES Measured during production by adding/ not adding known amount of FRR contaminants with product amount equivalent to (200 – 2000 SKU). Evaluate each rejected product and classify it as a False Reject or not Recommended target: not more than 0.1% Calculation:- FRR= 100 ×

  37. Slide 37: System Functionality Verification

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 • 6.14.3 Validating and Executing the Extraneous Matter Control and 5. System Functionality Verification. Management Plan 5. System Functionality Verification. 5.1 Test piece sizes used for assessing the detection and rejection func

  38. Slide 38: System Functionality Verification Cont.

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 • 6.14.3 Validating and Executing the Extraneous Matter Control and 5. System Functionality Verification. – Cont. Management Plan 5.6 Functionality verification shall assure 100% detection and rejection of every pass of each of the

  39. Slide 39: Rejected Packages

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 • 6.14.3 Validating and Executing the Extraneous Matter Control and 6. Rejected Packages. Management Plan 6.1 - Where extraneous matter detection is a critical control point (CCP), refer to HACCP MODELs for specific details and inst

  40. Slide 40: Procedures for Detection & Control Devices

    SECTION TITLE – EXTRANEOUS MATTER 2014 CPQR 7.5-02 VS NEW 2014 2024 • 6.14.3 Validating and Executing the Extraneous Matter Control and 7. Procedures for Detection & Control Devices. Management Plan Written procedures and instructions shall be established and communicated for extraneous matter detec

  41. Slide 41: What Is Next? Key Actions Based on New Requirements

    WHAT IS NEXT? KEY ACTIONS BASED ON NEW REQUIREMENTS - Copackers to: - Perform their Risk Assessments to all materials and considering all foreign bodies - Ensure a list of all glass and plastic items in processing / packaging and storage areas - Define the EMC Plan based on RA - If new controls are

  42. Slide 42: Thank You! Q&A

    THANK YOU! Q&A Mondeléz, SNACKING MADE RIGHT

  43. Slide 43: Attendance Tracker

    ATTENDANCE TRACKER Co-Packer Quality Expectations 2024 Training Attendance Tracker

  44. Slide 44: Hygienic Zoning & PEM

    HYGIENIC ZONING & PEM Chris Baylis – Global Food Safety

  45. Slide 45: New Requirements Due March 1 2025

    NEW REQUIREMENTS DUE MARCH 1 2025 • 6.10 Hygienic Zoning and Environmental Monitoring (For T0 only) • 6.10.2.1 All low moisture foods (Aw<0.6) now require PEM. • 6.10.4.1 New requirement for EB testing weekly, Zone 2

  46. Slide 46: 6.10 Hygienic Zoning & PEM – Applicable to T0 Copackers Only

    6.10 HYGIENIC ZONING & PEM – APPLICABLE TO TZERO COPACKERS ONLY 2014 2024 1. Monitoring needs 6.10.1 Hygienic Zoning Assessment for T0 Copackers • For low moisture foods, which are non-sensitive, no PEM is required. 6.10.1.1 The site shall have a facility map which includes different zones. Facility

  47. Slide 47: 6.10 Hygienic Zoning & PEM – Applicable to T0 Copackers Only

    6.10 HYGIENIC ZONING & PEM – APPLICABLE TO TZERO COPACKERS ONLY 2014 2024 1. Monitoring needs 6.10.2.1 T0 only • For low moisture foods, which are non-sensitive, no PEM is required. For low-moisture foods (Water Activity (Aw < 0.6)) Salmonella PEM (Pathogenic • For low-moisture, sensitive foods Salm

  48. Slide 48: 6.10 Hygienic Zoning & PEM – Applicable to T0 Copackers Only

    6.10 HYGIENIC ZONING & PEM – APPLICABLE TO TZERO COPACKERS ONLY 2014 2024 2. PEM Program requirements & instructions No changes Requirements and instructions for the plant PEM program shall be documented, reviewed by Mondelēz International CP Quality Manager and available to those Requirements and i

  49. Slide 49: 6.10 Hygienic Zoning & PEM – Applicable to T0 Copackers Only

    6.10 HYGIENIC ZONING & PEM – APPLICABLE TO TZERO COPACKERS ONLY 2014 2024 Not applicable NEW! Environmental Monitoring Program - EB 6.10.4.1 for T0 only Sites shall have an Enterobacteriaceae monitoring program, with defined frequencies as per Table 8.

  50. Slide 50: More Details on EB Testing

    MORE DETAILS ON EB TESTING • EB testing is used as an indicator to supplement the PEM program in addition to the Salmonella and Listeria spp. monitoring. Finding Salmonella in the environment is a rare event and the EB monitoring acts as a indicator that environmental conditions are shifting toward

  51. Slide 51: 6.10 Hygienic Zoning & PEM – Applicable to T0 Copackers Only

    6.10 HYGIENIC ZONING & PEM – APPLICABLE TO TZERO COPACKERS ONLY 2014 2024 3. Sampling Locations Site specific sampling locations shall be selected to identify potential harbourage and niche sites, and the potential migration of pathogen(s) between zones. Zone definitions have not changed however fre

  52. Slide 52: 6.10 Hygienic Zoning & PEM – Applicable to T0 Copackers Only

    6.10 HYGIENIC ZONING & PEM – APPLICABLE TO TZERO COPACKERS ONLY 2014 2024 4. Testing and Sampling Procedures • No Changes • Testing methodologies and sampling procedures are available upon request from Mondelēz International CP Quality Managers. • Qualitative methods (to determine presence or absenc

  53. Slide 53: 6.10 Hygienic Zoning & PEM

    6.10 HYGIENIC ZONING & PEM 2014 2024 8. Special Circumstances: • No Changes Increased environmental control procedures and action steps shall be considered in cases of new plant construction, new equipment installation or modification, and facility infrastructure damage (e.g. overhead leak, drain ba

  54. Slide 54: Thank You! Q&A

    THANK YOU! Q&A Mondeléz, SNACKING MADE RIGHT

  55. Slide 55: Sanitation Controls

    SANITATION CONTROLS Jitendra Rai, Global Food Safety

  56. Slide 56: Sanitation Controls - General

    SANITATION CONTROLS - GENERAL 2024 2014 Added clarification and simplification. 6.6. Sanitation Controls 6.8.1 General 6.6.1. The facility shall have a documented sanitation/housekeeping program in place. The 6.8.1.1 The facility shall have a documented sanitation/housekeeping program in place. The

  57. Slide 57: Sanitation Controls – CPQR T0 / T1 Unsealed

    SANITATION CONTROLS – CPQR TO / T1 UNSEALED 2024 2014 More robust elements to the sanitation schedule 6.8.1.11 Cleaning and sanitation programs shall be established, documented, T0 / T1 implemented, and verified to ensure that the food processing equipment and CPQR 6.4-01 Sanitation: Unsealed enviro

  58. Slide 58: Sanitation Controls – CPQR T0 / T1 Unsealed

    SANITATION CONTROLS – CPQR TO / T1 UNSEALED 2014 2024 CPQR 6.4-01 Sanitation: Simplified requirements 2. Specific Criteria & Instructions 6.8.2 PIC and PEC Schedule and Routine Cleaning All facilities shall develop, implement and maintain a documented Period Cleaning Schedule (PCS) for the non- rout

  59. Slide 59: Sanitation Controls – CPQR T0 / T1 Unsealed

    SANITATION CONTROLS – CPQR TO / T1 UNSEALED 2024 2014 New Section. Included new details in blue. 6.8.3 Methods CPQR 6.4-01 Sanitation: 6.8.3.1 Documented methods for cleaning shall be available to persons responsible for T0 / T1 cleaning tasks, including reference to equipment disassembly and reasse

  60. Slide 60: Sanitation Controls – CPQR T0 / T1 Unsealed

    SANITATION CONTROLS – CPQR TO / T1 UNSEALED 2024 2014 Simplified. CPQR 6.4-01 Sanitation: 6.8.4 Drains 3. Floor Drain Cleaning A floor drain cleaning program must be implemented to maintain control of 6.8.4.1 All sites shall implement and maintain a formal, documented program microorganisms in the f

  61. Slide 61: Sanitation Controls – CPQR T0 / T1 Unsealed

    SANITATION CONTROLS – CPQR TO / T1 UNSEALED 2014 2024 CPQR 6.4-01 Sanitation: Simplified. 4. Sanitation Tool Control. • • All facilities shall establish a control program for cleaning and sanitizing tools to separate: Product contact tools, non-product contact and drain cleaning tools 6.8.5 Cleaning

  62. Slide 62: Sanitation Controls – CPQR T0 / T1 Unsealed

    SANITATION CONTROLS – CPQR TO / T1 UNSEALED 2014 2024 Repacker Quality Expectations: 6.6.4. A system for verifying the effectiveness of the sanitation program of the entire facility and the transportation vehicles In the 2014 version, verification was a requirement. shall be in place. CPQR 6.4-01 Sa

  63. Slide 63: CPQE Section 6.8.6 Verification

    CPQE SECTION 6.8.6 VERIFICATION 6.8.6 Verification T0 only 6.8.6.1 The effectiveness of cleaning and sanitation programs shall be monitored and verified at specified frequencies. All results shall be documented. Programs shall be updated as appropriate. 6.8.6.2 The effectiveness of cleaning and/or s

  64. Slide 64: CPQE Section 6.8.6 Verification

    CPQE SECTION 6.8.6 VERIFICATION New In establishing test result acceptance criteria, the following table shall be followed: *40 in2 equals 258 cm2 ; Therefore, the values above should be multiplied by 2.58 when sampling is performed using 40 in2 . 1 Note 1 - Enterobacteriaceae (EBs) are the preferre

  65. Slide 65: QP 7.1-07 Sanitation Programs

    QP 7.1-07 SANITATION PROGRAMS Section 9: Verification The effectiveness of cleaning and sanitation programs shall be monitored , verified and documented in Sanitation Monitoring and Verification Program Sanitation Monitoring and Verification Program shall be based on the sensitivity of product, the

  66. Slide 66: QP 7.1-07 Sanitation Programs

    QP 7.1-07 SANITATION PROGRAMS Section 9: Verification 1)Visual inspection • This shall be conducted post-cleaning / pre-operation . • Where possible, these shall be separated into two inspections (post-cleaning and pre-operational) conducted by separate people. • In case of shift change, pre-operati

  67. Slide 67: QP 7.1-07 Sanitation Programs

    QP 7.1-07 SANITATION PROGRAMS Section 9: Verification 3)Freedom from soil • The use of ATP or other rapid protein detection methods will depend upon the sensitivity of the product and type of cleaning carried out. • It shall be carried out where the impact of residual soil on finished product is ass

  68. Slide 68: Thank You! Q&A

    THANK YOU! Q&A Mondeléz, SNACKING MADE RIGHT

  69. Slide 69: Pest Control

    PEST CONTROL Jitendra Rai, Global Sanitation SME

  70. Slide 70: Pest Control - General

    PEST CONTROL- GENERAL This section is applicable to all Copackers 2024 Simplified. 2014 6.9.1 General 6.7. Pest Control 6.9.1.1 The facility shall have a Pest Management program in place and shall apply 6.7.1. General Program Requirements the principles of exclusion, restriction and destruction. i.

  71. Slide 71: Pest Control - General

    PEST CONTROL- GENERAL This section is applicable to all Copackers 2014 2024 6.7. Pest Control 6.7.1. General Program Requirements Expanded on escalation requirement. i. Escalation requirements, limits and their rationale shall be individually determined and 6.9.3 Incident Escalation documented for e

  72. Slide 72: CPQE Section 6.9 Pest Control

    CPQE SECTION 6.9 PEST CONTROL This section is applicable to all Copackers Table 3: Recommended Rodent Escalation Procedure and Action Limits Action Level 1 Action Level 2 New Level of Activity One rodent sighting or signs of rodent activity Continued signs of activity within the same area beyond 2 c

  73. Slide 73: CPQE Section 6.9 Pest Control

    CPQE SECTION 6.9 PEST CONTROL This section is applicable to all Copackers Table 4: Recommended Insect Escalation and Action Limits Pest Action Level 1 Action Level 2 New Level of Activity A single breach of the action limits (as defined by More than one breach of the action limits within the same th

  74. Slide 74: Pest Control - General

    PEST CONTROL- GENERAL This section is applicable to all Copackers 2014 2024 6.7.2. Documentation The following records shall be maintained, kept current and shall be available on site: Simplified. i. Reports of regular facility pest management inspections which shall include: a. Name of person makin

  75. Slide 75: Pest Control - General

    PEST CONTROL- GENERAL This section is applicable to all Copackers 2024 Simplified. 2014 6.9.4 Insect Control 6.9.4.1 The presence of targeted insects shall be monitored and the rationale for the placement and monitoring frequency of pest control devices shall be 6.7.3. Insect Control documented and

  76. Slide 76: Pest Control - General

    PEST CONTROL- GENERAL This section is applicable to all Copackers 2024 Simplified. 2014 6.9.5 6.9.5.1 Rodent Control Permanent and temporary bait stations or other rodent monitoring or control devices shall be appropriately located, secure and tamper proof and properly maintained to prevent the risk

  77. Slide 77: Pest Control - General

    PEST CONTROL- GENERAL This section is applicable to all Copackers 2024 Simplified. 2014 6.9.6 Bird Control 6.9.6.1 The pest control program shall include measures for preventing birds from entering 6.7.5. Bird Control buildings, roosting internally and externally including related cleaning activitie

  78. Slide 78: Pest Control - General

    PEST CONTROL- GENERAL This section is applicable to all Copackers 2014 2024 6.7.6. Contracted Services Simplified. i. The scope of contracted services shall be determined through a site assessment and documented. Mondelēz International Quality Contact may be consulted before a contract is 6.9.7 Cont

  79. Slide 79: Pest Control - General

    PEST CONTROL- GENERAL This section is applicable to all Copackers 2014 2024 6.7.7. Pesticides i. Pesticides shall be used only when meeting all the following criteria Simplified. a) Compliance with all applicable laws. b) Application methods follow label instructions. 6.9.8 Pesticide Control c) Suit

  80. Slide 80: Thank You! Q&A

    THANK YOU! Q&A Mondeléz, SNACKING MADE RIGHT

  81. Slide 81: GMP

    GMP

  82. Slide 82: GMP - General

    GMP - GENERAL This section is applicable to all Copackers 2014 2024 New 6.1.2 The following GMP requirements are applicable to T0/T1/T2 as noted: 6.1.2.1 As a minimum Tier 0 & Tier 1 Unsealed Co-packers shall define the food handling area T0 / T1 where Mondelēz International unwrapped products and p

  83. Slide 83: GMP - General

    GMP - GENERAL 2024 Expanded details on handwashing facility requirements. 2014 6.1.2.4 6.1.2.4.1 Personal Hygiene Personnel facilities (for staff, visitors, temporary workers and contractors) shall be adequate for the size of the site and sensitivity of the product and be located and maintained in h

  84. Slide 84: Thank You! Q&A

    THANK YOU! Q&A Mondeléz, SNACKING MADE RIGHT

  85. Slide 85: Food Allergen Control and Labelling

    FOOD ALLERGEN CONTROL AND LABELLING Marta Palac, Global Food Safety

  86. Slide 86: New Requirements Due for March 1 2025

    NEW REQUIREMENTS DUE FOR MARCH 1 2025 6.11 Food Allergen Control and Labelling − 6.11.1.4 All copacker tiers now have a responsibility to assess the presence and likelihood of undeclared allergens and MSI's including identification of potential routes of cross contact and document procedures for han

  87. Slide 87: Food Allergen Control and Labelling - General

    FOOD ALLERGEN CONTROL AND LABELLING - GENERAL 2014 2024 Simplified. Removed information about design and From CPQR 7.3-01 Allergen CL development of new product formulations as not relevant 1. Identification of Allergens and Materials which can cause to Co-Packers. Sensitivity or Intolerance [MSI] i

  88. Slide 88: Food Allergen Control and Labelling - General

    FOOD ALLERGEN CONTROL AND LABELLING - GENERAL 2024 2014 Simplified. Also removed information about design and From CPQR 7.3-01 Allergen CL development of new product formulations as not relevant 2.1 Identification of Unlabeled Allergens. Cases may occur where an allergen is identified to Co-Packers.

  89. Slide 89: MSI's

    MSI’S Materials of Sensitivity & Intolerance (MSI) MSI’s are not required to be managed in the same way as those on the Global Food Allergen List, but controls must be implemented to assure compliance with local regulatory requirements. Materials on the list given below when directly added to the pr

  90. Slide 90: Food Allergen Control and Labelling - General

    FOOD ALLERGEN CONTROL AND LABELLING - GENERAL 2014 2024 No change to allergen cleaning validation. From CPQR 7.3-01 Allergen CL 6.11.1.7 5. Allergen Cleaning Validation 5. Allergen Cleaning Validation • Allergen cleaning must be validated to demonstrate that a specific T0 only • Allergen cleaning mu

  91. Slide 91: Food Allergen Control and Labelling - General

    FOOD ALLERGEN CONTROL AND LABELLING - GENERAL 2014 2024 Simplified. Refresher training required every 3 years unless 9. Training. Allergen awareness training must be provided to a major change. Previously was annually. all new food handling employees during orientation. In depth Allergen training mu

  92. Slide 92: Thank You! Q&A

    THANK YOU! Q&A Mondeléz, SNACKING MADE RIGHT

  93. Slide 93: Conclusion and Next Steps

    CONCLUSION AND NEXT STEPS Remind Co-Packers to conduct a thorough review of the new CPQE 2024 against their current policies and procedures Stay engaged with your Co-Packer audit regional / BU Co-Packer checklist will be Quality Team for news ready by July 1st and updates Implementation Invitations

  94. Slide 94: Attendance Tracker

    ATTENDANCE TRACKER Co-Packer Quality Expectations 2024 Training Attendance Tracker

Mondelez International — Webinar 2: New Tier 0 Copacker Food Safety Requirements in the 2024 CPQE Update on 6ix