Manuka Resources Ltd · ASX:MKR

Manuka Resources — MiningNews Select – Sydney March 2026

14 slides from Manuka Resources's conference presentation, Mar 10, 2026

  1. Slide 1: MiningNews Select – Sydney March 2026

    10 March 2026 MiningNews Select – Sydney March 2026 For personal use only Commencing Operations (C&M completed)1 – MKR Precious Metals Presentation, targeting production Q2 2026 (completely unhedged) An ASX/NZX-listed Producer, Developer and Explorer with Precious Metals assets in the Cobar Basin 1.

  2. Slide 2: Disclaimer

    Disclaimer This disclaimer applies to this presentation and the information contained in it (the Presentation). By reading complete or that it contains all information about the Company that a prospective investor or purchaser may this disclaimer you agree to be bound by it. The Presentation has bee

  3. Slide 3: About Manuka Resources

    About Manuka Resources Phased Strategy to deliver Self-sustaining  ASX listed mine operator, Value Creation Longer Term developer and explorer Strategic Value For personal use only  Near-term production from Gold Near Term Cashflow Extending mine life and Silver assets located in the Cobar Basin 1

  4. Slide 4: Corporate Summary

    Corporate Summary Share Price History Capital Structure Shares Outstanding 1,477M Options/warrants Outstanding 232M For personal use only Share Price (5 March 2026) c/share 14c Market Capitalisation A$207M Cash (plus available liquidity) A$25.7M Debt Outstanding A$52.8M • A$42.8M - Senior Debt Facil

  5. Slide 5: Welcome to Cobar – a mining town through and through

    Welcome to Cobar – a mining town through and through since the 1860’s Cobar Basin, New South Wales For personal use only March 2026 5

  6. Slide 6: Manuka holds Exceptional Assets in a Tier-1 precious metals district

    Manuka holds Exceptional Assets in a very deep Tier -1 precious metals & base metals district 2025 US$1.03B acquisition of CSA Metals Acquisition Corp Endeavour Mine Current Market Cap = US$11.32B For personal use only 2023 acquisition of Endeavour Mine CSA Mine from CBH Resources Tritton Mines Coba

  7. Slide 7: Wonawinta Silver Mine

    Wonawinta Silver Mine (100% owned by Manuka) • Existing 1Mtpa CIL Processing Plant and For personal use only associated Infrastructure built by CCR in 2012 (replacement costs >A$200m). • Two existing and three planned Open Pits. • Manuka owns the land (crown lease) hosting the ML • Total 38.5Mt Reso

  8. Slide 8: Wonawinta Silver Mine Resource

    Wonawinta Silver Mine (100% Manuka) Wonawinta - in-ground Resource For personal use only Ag Ag Pb Pb Resource Mt (g/t) (Moz) (%) (kt) Measured 1.1 47.3 1.7 0.69 7.5 Indicated 12.3 45.5 18.0 0.83 102.8 Inferred 24.9 39.0 31.3 0.39 96.9 Total 38.3 41.3 50.9 0.54 207.2 Wonawinta - ROM Stockpiles Resour

  9. Slide 9: Mt Boppy Gold Mine

    Mt Boppy Gold Mine (100% Manuka) • Historically one of NSW’s richest gold For personal use only mines, having produced ~500,000 oz Gold at ~15 g/t Au. • Existing 48-bed mining camp and ancillary infrastructure located on site. • Total 2.6Mt Resource at 1.32g/t • Mt Boppy Open Pit Probable Ore Reserv

  10. Slide 10: Mt Boppy Gold Mine Deep Drilling

    Mt Boppy Gold Mine Deep Drilling Commenced Early December 2025 Mt Boppy (100% Manuka) Mt Boppy - in-ground Resource For personal use only Au Au Resource kt (g/t) (koz) Measured 167 4.01 22 Indicated 165 4.24 22 Total 333 4.12 44 Mt Boppy – Rock Dump, Tailings and Stockpiles Figure 1: Mt Boppy Long S

  11. Slide 11: Project Summary (updated pricing)

    Project Summary (updated pricing) • Restart operations have commenced at the Wonawinta Highlights Processing Plant; • 10 Year Mine Life • Adding a front-end deslime and dewatering circuit to enhance For personal use only • 10.9Mt Mine Production Target1,2 mill throughput and leach performance. • 13.

  12. Slide 12: Project Sensitivities (A$ NPV)

    Project Sensitivities (A$ NPV) Based on Cobar Basin PFS released on ASX 30 January 2026 A$ NPV Table (Sensitivities to US$ For personal use only silver & gold prices) Production is very leveraged to movements in the gold and silver price: • Every 5% move in silver price impacts project by A$60m • Ev

  13. Slide 13: Financial Forecast – Year Project

    Financial Forecast – 10 Year Project Key metrics 10yr Project EBITDA For personal use only A$1.265B Project generates: A$0.55/share NPV . project basis (Avg A$127M PA) (excludes reserve increases, production expansions, exploration upside) 10yr Project Net Cashflow A$1.196B (Avg A$120M PA) Silver Co

  14. Slide 14: Corporate Office

    For personal use only Corporate Office: Suite 405 Grafton Bond Building 201 Kent Street Sydney, NSW 2000 Australia Phone: 02 7253 2020 Email: admin@manukaresources.com.au 14

Manuka Resources — MiningNews Select – Sydney March 2026 on 6ix