Balfour Beatty Plc · LSE:BBY

Balfour Beatty — FY2012 Earnings Presentation

60 slides from Balfour Beatty's earnings presentation, Mar 7, 2013

  1. Slide 1: 2012 full-year results presentation

    2012 full-year results presentation 7 March 2013

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation may include certain forward-looking statements, beliefs or opinions, including statements with respect to Balfour Beatty plc9s business, financial condition and results of operations. These forward-looking statements can be identified by the use of forwar

  3. Slide 3: Ian Tyler, Chief Executive Officer

    IAN TYLER Chief Executive Officer

  4. Slide 4: Resilient underlying earnings performance

    Resilient underlying earnings performance Actual Constant FY 2012 FY 2011 growth currency Revenue* £10,896m £11,035m -1% -1% Profit from operations* £309m £331m -7% -7% Pre-tax profit* £310m £334m -7% Underlying EPS* 35.0p 35.5p -1% Full-year proposed dividend 14.1p 13.8p +2% Average (borrowings)/ca

  5. Slide 5: Segmental highlights

    Segmental highlights Professional Increasing margin towards target range Services Diversifying into a broadly based Infrastructure infrastructure business Investments Securing value from the disposal of mature assets Support 12% increase in order book underlies growth Services potential Construction

  6. Slide 6: Strategic highlights

    Strategic highlights Single-capability Economic markets infrastructure Share in order book 2012 37% 63% 2011 41% 59% 2009 57% 43% 6

  7. Slide 7: Duncan Magrath, Chief Financial Officer

    DUNCAN MAGRATH Chief Financial Officer

  8. Slide 8: Professional Services – FY 2012 by geography

    Professional Services – FY 2012 by geography Steady performance £bn UK RoW 12% 1.6 35% RoW £0.6bn £195m (down 3% v HY12) (down (up 7% v FY11) 5%) 1.2 £590m (up 9%) £3,182m US £0.7bn (down 6%) 0.8 (down 3% v HY12) (down 1% v FY11) £2,570m (up 8%) £883m 0.4 (down 2%) UK £0.3bn (up 51% v HY12) US (up 2

  9. Slide 9: Professional Services

    Professional Services Actual Constant FY 2012 FY 2011 growth currency Order book £1.6bn £1.6bn +5% +9% Revenue £1,668m £1,645m +1% +1% Profit* £98m £87m +13% +12% Margin % 5.9% 5.3% * before non-underlying items  Improved margin v FY 2011  Good profit performance in the US, particularly power and

  10. Slide 10: Construction Services – FY 2012 by geography

    Construction Services – FY 2012 by geography Revenue decline, particularly in second half £bn RoW 10 17% UK RoW £2.1bn (down 5% v HY12) £1,207m 46% 8 (up 3% v FY11) (down 6%) 6 £3,182m US £3.1bn (down 6%) (down 10% v HY12) 4 (down 17% v FY11) £2,570m (up 8%) 2 UK £2.8bn (up 4% v HY12) 0 (up 1% v FY1

  11. Slide 11: Construction order book coverage

    Construction order book coverage Stronger US coverage than UK 31 Dec 2012 Multiple of revenue 2012 Unexecuted revenue orders ABNC Total Orders Total US £2.6bn £3.1bn £2.9bn £6.0bn 1.2x 2.3x UK £3.2bn £2.8bn £1.1bn £3.9bn 0.9x 1.2x 11

  12. Slide 12: Construction Services

    Construction Services Actual Constant FY 2012 FY 2011 growth currency Order book £8.0bn £8.5bn -6% -4% Revenue £6,959m £7,050m -1% -1% Profit* £122m £169m -28% -28% Margin % 1.8% 2.4% * before non-underlying items  US revenues +9% from acquisitions, -1% organic, but margin down as anticipated  UK

  13. Slide 13: Support Services – FY 2012 by market

    Support Services – FY 2012 by market Expected increases in power £bn 6 Building Transport Building £1.4bn 31% (down 2% v HY12) 28% 5 (up 3% v FY11) £504m £459m Power £1.8bn (down 11%) 4 (up 6%) (up 90% v HY12) (up 65% v FY11) 3 Water £0.3bn (down 30% v HY12) £158m 2 (down (down 41% v FY11) £512m 12%

  14. Slide 14: Support Services

    Support Services Actual Constant FY 2012 FY 2011 growth currency Order book £5.7bn £5.1bn +12% +12% Revenue £1,633m £1,584m +3% +3% Profit* £52m £67m -22% -22% Margin % 3.2% 4.2% * before non-underlying items  Strong growth in order book, particularly power and local authority  Good revenue growth

  15. Slide 15: Order book position compared to a year ago

    Order book position compared to a year ago Resilient medium term, construction weakness near term £7.5bn Total at FY 2012 £15.3bn £1.3bn £6.7bn Total at FY 2011 £15.2bn £1.3bn £5.2bn £4.5bn £5.3bn £3.4bn £3.2bn £3.4bn £4.5bn £2.8bn £1.0bn £1.0bn £1.9bn £2.1bn £1.3bn £1.4bn £0.9bn £0.9bn £0.3bn £0.3b

  16. Slide 16: Infrastructure Investments

    Infrastructure Investments Strong earnings performance FY 2012 FY 2011 £m Group JVs & assoc Total Group JVs & assoc Total PPP UK/Singapore 2 35 37 1 37 38 PPP US 12 6 18 12 7 19 Infrastructure (3) (1) (4) (3) (1) (4) Bidding costs & overheads (34) - (34) (30) - (30) Pre-disposals operating profit* (

  17. Slide 17: Infrastructure Investments

    Infrastructure Investments  Achieved financial close on ● Waste facility in Essex ● Western Group military family housing for US Air Force ● Energy-from-waste facility in Gloucestershire (February 2013)  Appointed preferred bidder on ● Edinburgh University student accommodation ● Aberystwyth Unive

  18. Slide 18: Net interest income

    Net interest income £m FY 2012 FY 2011 PPP subordinated debt interest receivable 24 25 PPP interest on financial assets 31 PPP interest on bank loans and overdrafts (27) 4 3 Net finance costs – pension schemes* - (3) Other interest receivable 7 Other interest payable (22) (15) (10) Preference shares

  19. Slide 19: Impact of revised IAS19 standard

    Impact of revised IAS19 standard Original Revised est. for est. for 2011 2012 2013 2013 Expected return on pension plan assets 6.10% 5.20% 5.20% 5.10% Discount rate on obligations 5.45% 4.85% 4.80% 4.40% Difference 0.65% 0.35% 0.40% 0.70% Impact on reported pension net finance cost £17m £10m £13m £2

  20. Slide 20: Mainland European rail restructuring

    Mainland European rail restructuring  2012 revenue £465m  Not consistent with strategy of multiple market sectors within specific geographies  Divesting all Mainland European rail businesses over time – Spain sold March 2013  Goodwill written down from £156m to £61m  Restructuring costs of £9m

  21. Slide 21: Cost efficiency programme

    Cost efficiency programme  Targeting £80m annual savings by 2015  Shared service centres – expand UK, set up Lancaster, PA  Reorganisations ● UK construction into three business streams ● US construction into three regions  Additional procurement efficiencies, including global  Achieved £36m sa

  22. Slide 22: Other non-underlying items

    Other non-underlying items £m Post-acquisition integration, reorganisation and other costs (9) Write-down of investment in Exeter International Airport (12) Cost of implementing UK shared service centre (4) Other non-underlying items (25) Amortisation of acquired intangible assets (45) Other non-und

  23. Slide 23: Cash from operations – FY 2012

    Cash from operations – FY 2012 Working capital outflow from construction cycle £m FY 2012 FY 2011 Group operating profit* 212 256 Depreciation 64 70 Non-underlying items (83) (19) Gain on disposals of interests in PPP JVs (52) (20) Other items 11 7 152 294 Pension deficit payments (61) (58) Working

  24. Slide 24: Balance sheet elements

    Balance sheet elements Changing shape, remains in balance 743 Investments1 734 Working (1,085) capital (777) 340 Net cash2 35 (2) Aggregate3 (8) (275) Pension deficit (338) £(1,500)m £(1,000)m £(500)m £0m £500m £1,000m 1 Directors’ valuation of PPP concessions Dec 2011 Dec 2012 2 excluding net borro

  25. Slide 25: PPP portfolio valuation movements – FY 2012

    PPP portfolio valuation movements – FY 2012 Valuation stable, despite £114m net distributions £m Valuation as at December 2011 743 Cash invested 55 Cash received – distributions (85) – disposals (84) (169) Net cash received (114) Unwind of discount on NPV 75 New project wins 4 Disposal gains, operat

  26. Slide 26: Working capital – Group

    Working capital – Group Seasonal improvement offset by impact of volume reductions £(400)m 0 Dec 07 Jun 08 Dec 08 Jun 09 Dec 09 Jun 10 Dec 10 Jun 11 Dec 11 Jun 12 Dec 12 £(600)m -3% £(800)m -6% -7.9% £(1,000)m -8.3% -9% £(1,200)m -10.9% -12% £(1,400)m -13.1% -13.5% -13.5% £(1,600)m -14.2% -15% Perio

  27. Slide 27: Working capital – Construction Services

    Working capital – Construction Services In line with June, UK reduction offset by US increase £(400)m -5% Dec 07 Jun 08 Dec 08 Jun 09 Dec 09 Jun 10 Dec 10 Jun 11 Dec 11 Jun 12 Dec 12 -7% £(600)m -9% £(800)m -11.9% -11% £(1,000)m -12.1% -13% £(1,200)m -14.2% -15% -14.7% -15.4% £(1,400)m -17% -16.5% -

  28. Slide 28: Working capital – Construction Services UK

    Working capital – Construction Services UK Reduction from volume and mix £(300)m -5% Dec 07 Jun 08 Dec 08 Jun 09 Dec 09 Jun 10 Dec 10 Jun 11 Dec 11 Jun 12 Dec 12 -7% £(400)m -9% £(500)m -11% £(600)m -13% £(700)m -16.2% -15% -15.8% -17% £(800)m -16.5% -16.8% -19% -18.6% £(900)m -19.7% -21% -20.8% £(1

  29. Slide 29: Working capital – Construction Services US

    Working capital – Construction Services US Flattening out, ahead of UK cycle 0 0 Dec 07 Jun 08 Dec 08 Jun 09 Dec 09 Jun 10 Dec 10 Jun 11 Dec 11 Jun 12 Dec 12 £(50)m -2% £(100)m -4% £(150)m -6% £(200)m -8% -7.3% £(250)m -8.6% -10% £(300)m -10.1% -12% £(350)m -12.5% -14% -14.1% -14.4% £(400)m -16% -16

  30. Slide 30: Average net cash/(borrowings)

    Average net cash/(borrowings)† Impacted by working capital movements £600m £572m £500m £518m £500m £440m £394m £400m £340m £333m £436m £434m £292m £300m £342m £200m £296m £223m £256m £224m £100m £34m £35m £104m £0m £35m -£100m £(126)m -£200m Jun 08 Dec 08 Jun 09 Dec 09 Jun 10 Dec 10 Jun 11 Dec 11 Ju

  31. Slide 31: Pensions – balance sheet movement

    Pensions – balance sheet movement Increased deficit from reduction in real discount rate £586m Pension deficits, net of tax Deferred tax assets £166m £441m £120m £48m £194m £338m £52m £275m £10m £80m £420m £75m £321m £96m £73m £258m £286m £286m £200m Dec Dec Dec Service Company Actuarial Actuarial O

  32. Slide 32: Summary of 2012

    Summary of 2012  Order book up 1% at £15.3bn  Good margin performance in Professional Services  Crystallisation of investments value offsetting Construction and Support Services declines  Pre-tax profit down 7% and EPS down 1%  Final dividend maintained at 8.5p, total dividend up 2% 32

  33. Slide 33: Andrew McNaughton, Chief Operating Officer

    ANDREW MCNAUGHTON Chief Operating Officer

  34. Slide 34: Introduction

    Introduction Patapsco Wastewater  Update on our response to treatment plant, USA market conditions  Specific actions over next few months  Strategic initiatives we are implementing 34

  35. Slide 35: Construction markets

    Construction markets  Conditions deteriorated in UK Terminal 2B, London Heathrow construction in the second half of 2012 ● Expected to continue in 2013  Some improvement in the US order book since the start of the year ● Higher margins not to come through before 2014  Overall, we see a difficult

  36. Slide 36: Cost efficiency update

    Cost efficiency update Phase 2 £50m annual savings target by 2015  Good progress made in 2012  Rationalisation in UK construction  Unified operating model in US construction  Tactical cost reduction in Support Services 36

  37. Slide 37: Cost efficiency phasing

    Cost efficiency phasing Phases 1&2 £80m total annual savings target £80m £60m Achieved £40m £20m £0m 2012 2013 2014 2015 Procurement People Property and other 37

  38. Slide 38: Rail operations in Mainland Europe

    Rail operations in Mainland Europe  Successful businesses for the Gold Coast Light Rail, Australia Group in the past  Investment programmes have been curtailed  Having only rail operations in geographies is not consistent with Group strategy  Divesting all of our Mainland European rail businesse

  39. Slide 39: Rail business a key strength in strategy

    Rail business a key strength in strategy  Global rail market is large and growing  Key element of our future development  Major projects won ● Denver, Melbourne, Qatar Rail  Increasing opportunities to combine our capabilities from design to delivery  Major projects remain at the heart of globa

  40. Slide 40: Facilities management business

    Facilities management business  Exploring our options Kirkcaldy Victoria Hospital, Scotland  WorkPlace grown into a standalone business  May generate more value by selling and redeploying capital to support our strategy 40

  41. Slide 41: Strategy: Leveraging key strengths

    Strategy Leveraging key strengths Local presence in End to end asset Skills as an investor multiple geographies knowledge and developer 41

  42. Slide 42: Target geographies and market sectors

    Strategy Target geographies and market sectors Hong Kong/ UK US GCC SE Asia Transport (Roads, Rail, Aviation) Complex private building Social infrastructure Mining Power Water Australia / New Canada South Africa India Brazil Zealand = Target geographies and market sectors for additional growth 42

  43. Slide 43: Strategic developments: Local presence

    Strategic developments Local presence  Highways maintenance a core strength in the UK  Australia a target market  State government outsourcing of highways maintenance in Australia  Specialist team from the UK to join Parsons Brinckerhoff to target these opportunities 43

  44. Slide 44: Strategic developments: End to end asset knowledge

    Strategic developments End to end asset knowledge  Reorganising around customers in market sectors  Breaking down divisional structures  Creating the 8country model9  Arming our people with full extent of our expertise  Starting to deploy across our footprint 44

  45. Slide 45: Strategic developments: Skills as an investor and developer

    Strategic developments Skills as an investor and developer  Outstanding year for Investments business  Diversified into student accommodation, energy- from-waste and offshore transmission assets, reducing reliance on government PFI  Developed funds management business ● First close achieved ● Fir

  46. Slide 46: Summary

    Summary  Continue to see 2013 as a difficult year for Construction Services ● Responding with effective actions  Transition of the Group from construction to target geographies and market sectors ● Better growth dynamics and return characteristics ● Improving resilience  Focus on pace and momentu

  47. Slide 47: Appendix

    APPENDIX Balfour Beatty

  48. Slide 48: Order book

    Order book £16bn June Dec £14bn £12bn £10bn £8bn £6bn £4bn £2bn £0bn 2005 2006 2007 2008 2009 2010 2011 2012 48

  49. Slide 49: Performance by sector

    Performance by sector £m FY 2012 FY 2011 Professional Services 98 87 Construction Services 122 169 Support Services 52 67 Infrastructure Investments 69 43 Corporate costs (32) (35) Profit from operations* 309 331 Net interest income 1 3 Pre-tax profit* 310 334 * from continuing operations, before no

  50. Slide 50: Pensions charge

    Pensions charge £m FY 2012 FY 2011 Defined benefit schemes: P&L charge – service cost 48 52 P&L credit – past service credit (2) (2) Expected return on assets (137) (143) Interest cost on scheme liabilities 137 146 Net finance charge - 3 Net pension charge* 46 53 Defined contribution schemes: P&L ch

  51. Slide 51: Underlying effective tax rate

    Underlying effective tax rate , FY 2012 FY 2011 Tax rate Tax rate £m PBT Tax PAT (%) PBT Tax PAT (%) Group, excluding JVs & associates* 213 (70) 143 32.9 259 (91) 168 35.1 JVs & associates* 110 (13) 97 11.8 89 (14) 75 15.7 Aggregate* 323 (83) 240 25.7 348 (105) 243 30.2 * before non-underlying items

  52. Slide 52: Group balance sheet

    Group balance sheet £m Dec 2012 Dec 2011 Goodwill and intangible assets 1,372 1,518 Current assets# 2,047 2,154 Current liabilities and provisions# (2,824) (3,239) Working capital# (777) (1,085) Net cash (excluding PPP subsidiaries) 35 340 PPP subsidiaries – financial assets 542 457 PPP subsidiaries

  53. Slide 53: Balance sheet cash movement

    Balance sheet cash movement £m Dec 2012 Dec 2011 Opening net cash† 340 518 Cash (used in)/generated from operations† (218) 35 Dividends from JVs and associates (inc. Barking) 58 59 Capital expenditure and financial investment (9) (92) Acquisitions and disposals (net of net cash acquired) (4) (63) Di

  54. Slide 54: PPP portfolio over time

    PPP portfolio over time Cashflow and value Total cashflow in year Portfolio value £180m £1,000m £160m £140m £750m £120m £100m £500m £80m £60m £250m £40m £20m £0m £0m 2020 2030 2040 2050 2060 54

  55. Slide 55: Working capital – Professional Services

    Working capital – Professional Services Continuing on trend to 5% of revenue £110m 5% £90m 3.2% 3.5% 1.9% 0% £70m £50m -2.4% -5% -3.9% £30m -10% £10m -10.9% -15% £(10)m -20% £(30)m £(50)m -21.9% -25% Dec 07 Jun 08 Dec 08 Jun 09 Dec 09 Jun 10 Dec 10 Jun 11 Dec 11 Jun 12 Dec 12 Period end working capi

  56. Slide 56: Working capital – Support Services

    Working capital – Support Services Slightly negative – likely to be neutral to positive in 2013 0 4% Dec 07 Jun 08 Dec 08 Jun 09 Dec 09 Jun 10 Dec 10 Jun 11 Dec 11 Jun 12 Dec 12 3% £(20)m 2% 1% £(40)m 0% £(60)m -1% -2.5% -2% £(80)m -2.5% -3% -4% £(100)m -3.8% -3.7% -4.3% -4.0% -5% -4.8% £(120)m -6%

  57. Slide 57: Analysis of net cash balances

    Analysis of net cash balances† Mixture of available and restricted cash £800m £600m £400m £200m £0m £(200)m £(400)m £(600)m Jun 08 Dec 08 Jun 09 Dec 09 Jun 10 Dec 10 Jun 11 Dec 11 Jun 12 Dec 12 Available cash Restricted cash Borrowings Net cash † excluding net debt of PPP subsidiaries 57

  58. Slide 58: Available funds

    Available funds Maintaining headroom £1,000m £800m £600m £400m £200m £0m Jun 08 Dec 08 Jun 09 Dec 09 Jun 10 Dec 10 Jun 11 Dec 11 Jun 12 Dec 12 Available cash 58

  59. Slide 59: PPP portfolio valuation roll-forward – FY 2012

    PPP portfolio valuation roll-forward – FY 2012 £55m £743m £34m £742m £734m £75m £704m £4m £174m £85m £191m £8m £182m £183m £84m 743 713 706 £551m £551m £569m 629 629 £522m Dec Equity Distributions Disposal Unwind Rebased New Operational Dec FX Dec 2011 invested proceeds of project & disposal 2012 tr

  60. Slide 60: Dividends per share

    Dividends per share 15.0p 12.5p 10.0p 7.5p 5.0p 2.5p 0.0p 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Interim Final 60