  1. Slide 1: Hermosa Site Visit

    14 September 2026 South32 Limited (Incorporated in Australia under the Corporations Act 2001 (Cth)) (ACN 093 732 597) ASX / LSE / JSE Share Code: S32 ADR: SOUHY ISIN: AU000000S320 south32.net HERMOSA SITE VISIT South32 Limited (ASX, LSE, JSE: S32; ADR: SOUHY) (South32) will today host an equity anal

  2. Slide 2: Hermosa Site Tour Presentation

    HERMOSA SITE TOUR PRESENTATION 14 September 2026

  3. Slide 3: Important Notices

    IMPORTANT NOTICES FORWARD-LOOKING STATEMENTS This presentation contains forward-looking statements, including statements about trends in commodity prices and currency exchange rates; demand for commodities; production forecasts; plans, strategies and objectives of management; capital costs and sched

  4. Slide 4: Hermosa Highlights

    HERMOSA HIGHLIGHTS Large-scale, long-life base and precious metals project in Arizona, USA Taylor zinc-lead-silver project Taylor project on track for Federal permitting under expected to deliver attractive first production in H2 FY28 FAST-41 complete returns over initial ~33-year life(a) Taylor pro

  5. Slide 5: Taylor Project Highlights

    TAYLOR PROJECT HIGHLIGHTS Large-scale, long-life zinc-lead-silver underground mine Key Highlights Globally significant zinc Autonomous, digitally Dual shaft design Plant debottlenecking Zn-Pb-Ag mine plus ~8Moz p.a. silver enabled mine plus decline access studies underway Sulphide deposit ~33 years

  6. Slide 6: Taylor Capital Expenditure

    TAYLOR CAPITAL EXPENDITURE Investing in underground and surface infrastructure to deliver first production in H2 FY28 ~80% of growth capital invested, Shaft sinking now at unit rates, process ~US$230M of contingency contracted or subject to final pricing plant on maximum guaranteed price remains ava

  7. Slide 7: Fully Permitted for Development

    FULLY PERMITTED FOR DEVELOPMENT Federal permitting completed under FAST-41 Hermosa permitting timeline Sep-26 Notice to Proceed issued Federal permits received in two years under the FAST-41 program Jul-26 Final Record of Decision received • First mining project added to FAST-41 Mar-26 Final Environ

  8. Slide 8: Sustainable Development

    SUSTAINABLE DEVELOPMENT Aligned with our purpose to make a difference by developing natural resources, improving people’s lives now and for generations to come • Largest private investment in Southern Arizona • Located in Santa Cruz County, where ~20% of residents currently live below Economic impac

  9. Slide 9: Taylor Project

    TAYLOR PROJECT

  10. Slide 10: Taylor Mineral Resource and Ore Reserve

    TAYLOR MINERAL RESOURCE AND ORE RESERVE A large orebody expected to support high productivity and throughput Taylor geology and mineralisation (looking southwest) Ore Reserve of 99Mt at 11.38% ZnEq(a), supporting initial reserve life of 25 years Shafts Mineral Resource of 169Mt at 10.44% ZnEq(a), re

  11. Slide 11: Taylor Near-Mine Exploration

    TAYLOR NEAR-MINE EXPLORATION Federal permitting expands drill access to test near-mine extensions Taylor orebody (looking southwest) N Taylor orebody remains open at depth and laterally Potential for continued mineralisation down dip and along strike Extension drill targets to be tested following No

  12. Slide 12: Taylor Mine Design

    TAYLOR MINE DESIGN Conventional mining methods delivering high productivity from multiple faces Taylor underground mine design Dual shaft access with nameplate capacity of 4.3Mtpa Longhole open stoping with paste backfill, similar to Cannington Ore mined in an optimised sequence across four independ

  13. Slide 13: Decline Access

    DECLINE ACCESS Decline access to deliver first ore for plant commissioning and increase ore handling capacity by ~25% Enhanced operational flexibility Exploration decline for the Clark Decline Decline being being extended extended to to provide provide Enables first production with additional ventil

  14. Slide 14: Decline Progress

    DECLINE PROGRESS First ore mined from Taylor via the decline is expected in mid-FY28 Decline entrance Decline development SLIDE 13

  15. Slide 15: Shaft Progress

    SHAFT PROGRESS Both shafts progressing towards the primary production level, representing major de-risking milestones Ventilation shaft Ventilation shaft is expected to reach the primary production level in October 2026 Main shaft expected to reach the primary production level in Q2 FY27 Shaft sinki

  16. Slide 16: Underground Infrastructure

    UNDERGROUND INFRASTRUCTURE Underground infrastructure to be installed following shaft sinking Main shaft development Lateral development at the first mining level completed Underground infrastructure, including primary crusher, ore storage and hoisting systems, to be installed at primary production

  17. Slide 17: Taylor Processing Plant

    TAYLOR PROCESSING PLANT Conventional processing plant design with 4.3Mtpa nameplate capacity, enhanced with proven technology Taylor concentrator Automated process controls operated remotely from Nogales operations centre Grinding All Jameson cell circuit to reduce footprint, Coarse Flotation improv

  18. Slide 18: Plant and Surface Infrastructure Construction

    PLANT AND SURFACE INFRASTRUCTURE CONSTRUCTION Surface construction advancing in line with plan Taylor process plant construction (looking north) FY26 milestones • Major process plant transformers installed • Primary and secondary mills installed • All flotation cells installed • Substation for the 1

  19. Slide 19: Plant Debottlenecking

    PLANT DEBOTTLENECKING Plant debottlenecking opportunity to support potential expansion to 5Mtpa Flotation circuit (looking north) Capacity in comminution, flotation and concentrate filtration Additional materials handling infrastructure and pumping capacity required to reach 5Mtpa Expansion expected

  20. Slide 20: Peake Deposit

    PEAKE DEPOSIT

  21. Slide 21: Peake Highlights

    PEAKE HIGHLIGHTS Potential source of future copper production and mine life extension Peake deposit (looking east) Copper-rich deposit located south of Taylor Potentially continuous mineralised system connecting Peake and Taylor Mineral Resource has grown ~10x since the initial 2023 estimate(c) Mine

  22. Slide 22: Peake Drill Results

    PEAKE DRILL RESULTS Successful drill results support the potential for further resource growth Peake deposit (looking east) Shafts Continued exploration momentum(a) (In progress) • ~15,000m drilled over the past 12-months, including further Clark deposit high-grade copper and polymetallic intercepts

  23. Slide 23: Integration with Taylor

    INTEGRATION WITH TAYLOR Assessing the potential to integrate with Taylor Taylor deposit and Peake deposit (looking east) Peake would be accessed via Taylor’s shaft infrastructure Embedded flexibility in process plant design to add a copper circuit Plant modification estimated at ~US$50M Taylor stope

  24. Slide 24: Regional Exploration

    REGIONAL ' Te a RORATION . - eee

  25. Slide 25: Regional Land Package

    REGIONAL LAND PACKAGE Highly prospective land package with regional growth potential Hermosa land package Patented Unpatented Original land package More than doubled our land tenure in the most prospective areas South32 private land Prospects Deposits High-priority corridor identified utilising data

  26. Slide 26: Flux Prospect

    FLUX PROSPECT Successful exploration at Flux demonstrates the potential for future discoveries Flux prospect (looking south) Located downdip of a historic mining area with the potential to host Taylor-like mineralisation Flux historic mining area reported production of 850kt @ 8% Zn, 5% Pb, 2.5% Cu,

  27. Slide 27: Priority Regional Targets

    PRIORITY REGIONAL TARGETS Drilling priority prospects adjacent to patented lands as permits are issued Hermosa high-priority corridor Strategy to systematically permit, drill and assess high-priority targets World’s Fair Lead Queen Taylor TSF2 Patented Unpatented Targets located downdip of historic

  28. Slide 28: Summary and Outlook

    SUMMARY AND OUTLOOK Long-life, large-scale, high margin base metals project advancing to first production Decline development Both shafts nearing primary Surface infrastructure progressing towards first ore production level, de-risking construction progressing for plant commissioning critical path s

  29. Slide 29: South32

    SOUTH32

  30. Slide 30: Annexure 1: JORC Code Table 1: Peake deposit

    Annexure 1: JORC Code Table 1: Peake deposit The following tables provide a summary of important assessment and reporting criteria used for the reporting of Exploration Results for the Peake deposit, which forms part of the Hermosa project located in South Arizona, USA (Figure 1). Sections 1 and 2 b

  31. Slide 31: JORC Table 1: Sampling and logging criteria

    Criteria Commentary recovery is observed at intersections of the carbonates with a major thrust structure, or when locally natural karstic voids have been encountered alongside shallow historic workings. Logging • The entire length of core is photographed and logged for lithology, alteration, struct

  32. Slide 32: JORC Table 1: Assay quality control

    Criteria Commentary • The performance of ALS internal QA/QC samples is continuously monitored. In the event of a blank failure, the entire batch is reprocessed from the crushing stage. If one CRM fails, data reviewers internal to ALS examine the location of the failure in the batch and determine how

  33. Slide 33: JORC Table 1: Sample security and tenure

    Criteria Commentary Sample security • Samples are tracked and reconciled through a sample numbering and dispatch system from site to the ALS sample distribution and preparation facility in Tucson or other ALS preparation facilities as needed. The ALS LIMS assay management system provides an addition

  34. Slide 34: JORC Table 1: Geology and mineralisation

    Criteria Commentary stratigraphy are a result of late-Precambrian to early-Palaeozoic rifting, subsequent widespread sedimentary aerial, and shallow marine deposition through the Palaeozoic Era, followed by Mesozoic volcanism and late batholitic intrusions of the Laramide Orogeny. Mineral deposits a

  35. Slide 35: JORC Table 1: Relationship between mineralisation widths and intercept lengths

    Criteria Commentary Relationship • The intersection length can be approximately 30% longer than true width when drilling between intersects the low-to-moderately dipping (30°) stratigraphy. mineralisation widths and intercept lengths Diagrams • Relevant maps and sections are included with this annou

  36. Slide 36: Figure 1: Regional location plan

    Figure 1: Regional location plan HERMOSA SITE TOUR PRESENTATION – PEAKE EXPLORATION RESULTS

  37. Slide 37: Figure 2: Hermosa project regional geology

    Figure 2: Hermosa project regional geology HERMOSA SITE TOUR PRESENTATION – PEAKE EXPLORATION RESULTS

  38. Slide 38: Figure 3: Peake deposit local geology and collar locations

    Figure 3: Peake deposit local geology and Exploration Results collar locations HERMOSA SITE TOUR PRESENTATION – PEAKE EXPLORATION RESULTS

  39. Slide 39: Figures 4 and 5: Peake Mineral Resource plan and cross-section

    Figure 4: Plan view of the Peake Mineral Resource and favourable setting with newly reported exploration drill holes shown as circles where the holes intersected. Figure 5: Cross-section through the Taylor and Clark mineral domains (unsliced), and Peake mineral resource shapes showing Exploration Re

  40. Slide 40: Table 1: Peake drill hole collar details

    Table 1: Hole ID, collar location, dip, azimuth, and drill depth of new drill holes from the Peake deposit East North Elevation Wedge Hole ID Dip Azimuth TD Depth (m) (UTM) (UTM) (m) Depth (m) HDS-689-B 525963 3479775 1666 649 -69 288 1695 HDS-690 525964 3479774 1666 N/A -76 238 1336 HDS-690-A 52596

  41. Slide 41: Table 2: Significant intersections – Peake deposit

    Table 2: Significant intersections – Peake deposit Exploration Results From To Cut Off Width Zinc Lead Silver Copper Molybdenum CuEq ZnEq Hole ID (m) (m) (m) (%) (%) (ppm) (%) (%) (%) (%) 1225.9 1246.9 2% ZnEq 21.0 6.41 6.14 283 1.53 0.001 26.58 1355.9 1425.4 0.2% Cu 69.5 0.25 0.55 37 0.61 0.006 1.5