Hulamin Limited · JSE:HLM
Hulamin — Investor Presentation (June 2007)
14 slides from Hulamin's investor presentation, June 2007
Slide 1: Presentation to analysts: Pietermaritzburg, June 2007
Presentation to analysts: Pietermaritzburg Date: June 2007
Slide 2: Hulamin Extrusions
Hulamin Extrusions 2 HULAMIN EXTRUSIONS
Slide 3: Aluminium Extrusions
Aluminium Extrusions 3 HULAMIN
Slide 4: Hulamin Extrusions
Hulamin Extrusions • 30% owned by Hydro Aluminium – Technical partner • 3 Extrusion Plants – Pietermaritzburg: 2 presses – Midrand: 2 presses – Cape Town: 1 press • Anodising, Powder Coating, Fabrication • Die Manufacturing and Remelt • 49% share in Almin, Zimbabwe – Extrusion press, casting, copper
Slide 5: 5 HULAMIN
5 HULAMIN EXTRUSIONS
Slide 6: 10" 3800 ton Pmb press
10” 3800 ton Pmb press 6 HULAMIN EXTRUSIONS
Slide 7: South African Extrusion Market
South African Extrusion Market 60,000 50,000 OTHER 40,000 AUTO ELEC tons 30,000 HEAVY ENG LIGHT ENG 20,000 CUST DURABLE ARCH 10,000 - 98 99 00 01 02 03 04 05 06 07 est 7
Slide 8: Market growth
Market growth 80,000 70,000 60,000 50,000 Light Eng / other to n s 40,000 Tpt/Auto 30,000 Arch 20,000 10,000 - 01 02 03 04 05 06 07 08 09 10 8
Slide 9: 9 HULAMIN
9 HULAMIN EXTRUSIONS
Slide 10: Market Development
Market Development • South African consumption 1kg / person • Developed economy 10kg/person • South Africa “underdeveloped” – Road transport – Rail • Building market well developed – Energy regulation will drive aluminium – Hulamin well positioned via Hulamin Building Systems – Opportunity to take s
Slide 11: Road Transport
Road Transport HULAMIN EXTRUSIONS
Slide 12: Extruded Aluminium Process
EXTRUDED ALUMINIUM PROCESS Billet from Smelter New Die Design & Manufacturing Billet Cutting Remelt Billet Casting Die Pretreatment Billet Preheating Process Scrap Die Extrusion Recycling Preheating Heat Treatment Finishing ( option) Pack and Ship to Customer Powder Coating Anodising Fabrication 12
Slide 13: Manufacturing success factors
Manufacturing success factors • Volume and mix • Key performance indicators – Kilograms/hour – Yield % - from billet to delivered order – Stopped die % – Die life • Key skill development – Die manufacturing and maintenance – Process technology (time, pressure, temperature) 13
Slide 14: Thank you
=) Oo > ¥ Cc 4) & — HULAMIN 14