Albright Metals Ltd · ASX:ABR
Albright Metals — Investor Presentation (June 2026)
15 slides from Albright Metals's investor presentation, Jun 11, 2026
Slide 1: Corporate Presentation June 2026
For personal use only Gold production focus Antimony exploration upside Corporate Presentation June 2026 ASX: ABR
Slide 2: Disclaimer
DISCLAIMER Foreign Estimate and Competent Person Statements The Foreign Estimate of the deposit for the Golden Pike Gold Project referred to in this presentation was completed by Roscoe Postle Associates Inc for Portage Minerals Inc in 2011. The estimate was prepared in accordance with Canadian NI 4
Slide 3: Corporate Snapshot
CORPORATE SNAPSHOT 1.49B A$0.004 A$5.9M A$4.6M For personal use only SHARES ON ISSUE SHARE PRICE MARKET CAP ENTERPRISE VALUE (cash ~A$1.3M as at 31/3/2026) GREG HILL IAN STUART LESLIE INGRAHAM ASHLEY JONES GEMMA LEE Chief Executive Officer Non-Executive Chair Non-Executive Director Non-Executive Dir
Slide 4: Strategic Approach
STRATEGIC APPROACH For personal use only Albright Metals is developing: A high-grade gold production project which has antimony and gold exploration upside Approach: • Advance gold development project toward near term production revenue • Identify and unlock antimony mineralisation within the portfo
Slide 5: Gold and Antimony – Strategic Commodities
GOLD AND ANTIMONY – STRATEGIC COMMODITIES • The Golden Pike Project is located in southern New Brunswick. For personal use only • Government of New Brunswick is committed to developing a strong mining industry in the province. • Government of Canada’s Defence Industrial Strategy prioritises Canadian
Slide 6: Golden Pike Project – Au Sb
GOLDEN PIKE PROJECT – Au Sb • Albright Metals has optioned Mineral Claim 7616 which covers 3,292ha across the Annidale geological belt. For personal use only • Prior exploration has focused on gold and includes approximately 20,000m of diamond drilling on the Vail Road high-grade gold deposit. • Bon
Slide 7: High-Grade Gold
HIGH-GRADE GOLD • Drill program at the Vail Road Gold Deposit was completed in December 2025. • Key objectives included: For personal use only • Infill drilling to test continuity. • Replicate some historical holes as QA for an in- progress mineral resource estimation to be reported under the JORC c
Slide 8: High-Grade Gold
HIGH-GRADE GOLD • Results from the 2025 diamond drill program validate historical work and interpretation. • The Vail Road deposit remains open at depth. • Similar targets on untested areas of the claim occur east and south of the Vail Road gold deposit, indicated For personal use only by soil and b
Slide 9: High-Grade Gold
HIGH-GRADE GOLD • The Vail Road Gold deposit has a Foreign Estimate of 214.8kt @ 9.6g/t Au for 66,300 oz.1 • Foreign estimate was completed in 2015 when the gold price was circa USD1,500/oz and used a high cut- off grade of 5g/t Au. For personal use only Classification Zone Tonnes (‘000) Au (g/t) Oz
Slide 10: Gold Mine Development Pathway
GOLD MINE DEVELOPMENT PATHWAY • The Vail Road deposit is sub-vertical, with high-grade vein style mineralisation commencing at surface. For personal use only • Resource modelling has commenced, which will enable a preliminary mine plan to be developed. • Mine development concept is for an undergroun
Slide 11: High-Grade Antimony
HIGH-GRADE ANTIMONY The Bond Road prospect is similar to the Antimony Resources Bald Hill prospect located approximately 4km to the west, which has yielded multiple antimony drill intercepts including For personal use only internal zones >28% Sb along a NW trending vein (CSE: ATMY).1 Similarities in
Slide 12: High-Grade Antimony
HIGH-GRADE ANTIMONY • Bond Road is a high-grade antimony occurrence. • Soil sampling program has shown high Sb values For personal use only along a NW trending structure. • Recent boulder samples collected by Albright Metals yielded antimony values of 27.6% Sb and 57.0% Sb.1 • Exploration drilling c
Slide 13: Antimony Upside
ANTIMONY UPSIDE • Antimony is a strategic and critical metal. Antimony Uses in the Technology Age • Uses include batteries, flame retardants and For personal use only semiconductors • ~80 - 90% supply controlled by China and Russia • Yet 60% of industrial consumption is in USA and Europe • Important
Slide 14: Growth Path
GROWTH PATH For personal use only NEAR TERM MID TERM LONG TERM Gold mineral resource Economic studies and mine Gold production estimate development planning Antimony development Antimony and gold exploration Metallurgical work Portfolio expansion Strategic investor engagement Environmental and minin
Slide 15: Join our community
For personal use only Join our community Receive alerts for announcements, news Greg Hill and updates direct to your inbox and engage with the Albright Metals team Chief Executive Officer using the Q&A tool on our website. 191B Carr Place, Leederville Western Australia 6007 Telephone: +61 8 9321 000