  1. Slide 1: Amended Presentation – Moving the Sorby Hills Lead Silver Project Toward Production

    6 August 2024 Amended Presentation “Moving the Sorby Hills Lead Silver Project Toward Production” Boab Metals Limited (ASX: BML) (“Boab” or the “Company”) wishes to provide For personal use only shareholders with the attached amended presentation which amends the presentation released to the market

  2. Slide 2: Moving the Sorby Hills Lead-Silver Project Toward Production

    Moving the Sorby Hills Lead-Silver Project For personal use only Toward Production A near-term producer with a margin highly leveraged to the Silver Price boabmetals.com Corporate Presentation August 2024 Delivering metals for a sustainable future. Corporate Presentation August 2024

  3. Slide 3: Disclaimer

    2 Disclaimer Forward-Looking Statements Compliance Statement For personal use only Certain statements in the presentation are or may be “forward-looking statements” and The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore represent the Company’s intentions, projectio

  4. Slide 4: Boab Metals Corporate Summary

    3 Boab Metals Corporate Summary Share Price History 3.0 0.30 For personal use only Capital Structure (2 August 2024) 2.5 0.25 Share Price Debt Volume (M Shares) Share Price (A$/sh) 2.0 0.20 A$0.094 /share Nil 1.5 0.15 Shares on Issue Cash 1.0 0.10 234 million shares A$5.7 million1 30 June 2024 0.5 0

  5. Slide 5: A near term producer of Lead and Silver

    4 Sorby Hills Project A near term producer of Lead and Silver • Located 50km northeast of Kununurra in the East Kimberley Region For personal use only of Western Australia (Tier 1 Jurisdiction) • High quality 47.3Mt Mineral Resource1 • 1.5Mt contained Lead at 3.1% • 0.2Mt contained Zinc at 0.4% • 53

  6. Slide 6: Sorby Hills JV Partnership

    5 Sorby Hills JV Partnership Boab Metals Ltd (75% interest) Henan Yuguang Gold and Lead Co., Ltd For personal use only (25% contributing interest) • Yuguang Gold and Lead Co., Ltd (“Yuguang”) is Asia’s largest electrolytic lead producer and China’s largest Silver producer.1 • Initially invested in S

  7. Slide 7: High Quality Resource Estimate

    6 Sorby Hills Project High Quality Resource Estimate Grade Contained Metal Tonnes Deposit Pb Zn Ag PbEq1 Pb Zn Ag For personal use only (Mt) % % g/t % kt kt koz A 0.6 5.3% 0.1% 23 6.1% 31 6 427 B 2.7 3.6% 0.3% 20 4.3% 97 8 1,720 Omega 17.2 3.3% 0.4% 34 4.5% 566 71 18,948 Norton 21.1 2.8% 0.4% 34 4.0

  8. Slide 8: Low Risk Open Pit Ore Reserve

    7 Sorby Hills Project Low Risk Open Pit Ore Reserve FEED Study Production Target For personal use only Total Waste ROM Pb Ag PbEq Strip Pit (Mt) (Mt) (Mt) (%) (g/t) (%) Ratio Pit A 4.1 3.7 0.5 3.7 16.4 4.3% 8.1 Pit B 14.8 12.6 2.3 3.2 17.4 3.8% 5.5 Omega South 21.1 18.3 2.8 2.9 29.5 3.9% 6.5 Omega M

  9. Slide 9: FEED Study Highlights

    8 Sorby Hills Project FEED Study completed June 2024 FEED Study Highlights For personal use only Lead A$264m pre- C1 cash cost US$0.36/lb 546 thousand payable tonnes production Capex A$1,803 Million Revenue payable Pb underpinned 75% Incl. net Silver credit of by tendered pricing US$0.37/lb payable

  10. Slide 10: Confirmed Low-Cost producer

    9 Sorby Hills Project Confirmed Low-Cost producer Independently confirmed as a 1st Quartile Project on For personal use only the Global Lead cost curve 2027 Lead Cost Curve (ex-works basis) 1st Quartile 2nd Quartile 3rd Quartile 4th Quartile ▪ Low risk open cut mining and high process plant throughp

  11. Slide 11: Exposure to Silver Price

    10 Sorby Hills Project Exposure to Silver Price With a Resource containing 53 Moz of Silver, Sorby Hills is one of For personal use only the largest undeveloped Silver Deposits on the ASX US$/lb US$/oz ▪ Forecast Project 2.0 50 Operating Costs covered by a historically non- Sorby Hills AISC ex Lead

  12. Slide 12: Silver

    11 Silver The most conductive metal on earth • Silver‘s traditional role as a Strong demand for use in solar cells and the storer of wealth is For personal use only electronic components of electric vehicles complemented by its increasing industrial demand. • The use of Silver in solar cells has inc

  13. Slide 13: Supplying the proven Battery Metal

    12 Sorby Hills Project Supplying the proven Battery Metal Lead demand growth underpinned by mature and For personal use only emerging vehicle technologies 1. www.batteryinnovation.org/resources/lead-battery-market-data/ “…. low voltage 12V lead- Forecast Light Vehicles Sales versus Lead Demand1 base

  14. Slide 14: Development Ready

    13 Sorby Hills Project Development Ready ▪ GRES has recently completed For personal use only Primary Crusher FEED Workstreams. ▪ FEED output has resulted in: ▪ detailed plant design and; Flotation Circuit optimised site layout; ▪ the issue of tender packages for long-lead items; and Filter Press ▪ u

  15. Slide 15: Significant Intercepts post Mineral Resource Estimate

    Sorby Hills Project 14 Significant Intercepts post Mineral Resource Estimate 2021 Phase V – 15 holes not yet included in Mineral Resource Estimate For personal use only ▪ SHRC_123 (Beta): 27m @ 3.47% Pb & 37g/t Ag from 34m: ▪ Incl. 3m @ 7.04% Pb & 95g/t Ag from 35m; 5m @ 5.60% Pb & 44g/t Ag from 45m

  16. Slide 16: Keep Seismic Target

    15 Sorby Hills Project Keep Seismic Target Keep Seismic Target ▪ 1st drill hole indicates potential for a new discovery (2 km south of existing Sorby Discovery located 2km from the existing Hills Reserves). For personal use only Sorby Hills Reserves. ▪ New Zone located within favourable structural a

  17. Slide 17: Strategic Growth Opportunities

    16 Sorby Hills Project Strategic Growth Opportunities Manbarrum Zn-Pb-Ag Project Vision to establish a long-life presence in the east For personal use only ▪ located 25km east of the Sorby Hills Project. Kimberley Region ▪ Mineral Resources declared at two prospects which Figure: Location of the are

  18. Slide 18: Delivering Silver Exposure to Investors

    17 Sorby Hills Project Delivering Silver Exposure to Investors The Sorby Hills Project and Boab Metals offer rare For personal use only ASX exposure to Silver Price movements ▪ Boab’s share price has 9.0 BML Share Price vs AUD Silver Price 1.00 historically demonstrated a 8.0 strong correlation with

  19. Slide 19: Investment Opportunity

    18 Boab Metals Investment Opportunity For personal use only Near Term News Flow and Ongoing Activities ▪ Execute Offtake Agreement(s). 11% - FEED vs DFS NPV Based on same macroeconomic assumptions ▪ Assessing opportunities to further de-risk project execution and development timelines. Past 12 Month

  20. Slide 20: Thank You

    19 For personal use only Thank You Simon Noon – Managing Director & CEO info@BoabMetals.com www.BoabMetals.com www.linkedin.com/company/boab-metals

  21. Slide 21: Establishing Deep Roots within the Local Community

    20 Boab Metals Establishing Deep Roots within the Local Community For personal use only Boab is extremely proud to be the Naming Rights Sponsor of the Ord Valley Muster for 2023 and beyond. • Sense of community plays a key role in economic and social well-being of stakeholders across the east Kimber

  22. Slide 22: Board and Technical Team

    21 Board and For personal use only Technical Team Gary Comb Simon Noon Richard Monti Andrew Parker Chairman Managing Director Non-Exec. Director Non-Exec. Director and CEO Board and Management Engineer with over 30 Experienced mining Geologist with over 30 Lawyer with significant with a proven track

  23. Slide 23: Appendix

    22 Appendix For personal use only Appendix Boab Metals Limited ASX:BML 22

  24. Slide 24: Sorby Hills Feed Study Life of Mine Physicals

    23 Sorby Hills Feed Study Life of Mine Physicals PHYSICALS SUMMARY Unit Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 For personal use only ROM Mined Mt 18.3 - 0.4 2.1 2.3 2.4 2.5 2.3 2.0 1.1 3.0 0.3 - Waste Mined Mt 134.6 - 3.8 11.7 14.3 25.7 25.4 21.0 17.3 13.0 4.2 0.2 - % Meas

  25. Slide 25: Sorby Hills Feed Study Life of Mine Cashflows

    24 Sorby Hills Feed Study Life of Mine Cashflows FINACIAL SUMMARY Unit Total 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 For personal use only Lead Revenue A$M 1,803 - - 198 225 260 215 207 208 165 226 98 1,803 Silver Revenue A$M 693 - - 59 69 131 121 57 62 71 82 40 693 Total Revenue

  26. Slide 26: Capital Cost Breakdown

    25 Sorby Hills FEED Study Capital Cost Breakdown For personal use only Total upfront capital cost of A$264M Item Pre-Production Sustaining Total (A$M) (A$M) (A$M) including A$22.7M contingency EPC Contract 134.9 - 134.9 ~66% of capital costs underpinned by Site Ests/ Bulk Earthworks 31.9 4.9 36.9 te

  27. Slide 27: Operating Cost Breakdown

    26 Sorby Hills FEED Study Operating Cost Breakdown For personal use only Competitive C1 cash cost of US$0.36/lb Item Total Unit Costs (A$M) payable Pb (including Silver Credits). A$/t ore US$/lb payable Pb Logistics 117 6.4 0.07 ~80% of Mining Costs underpinned by Mining 547 30.0 0.31 tendered prici

  28. Slide 28: Resource Classification by Deposit

    27 Sorby Hills Project Resource Classification by Deposit Grade Contained Metal For personal use only Tonnes Deposit Classification Pb Zn Ag PbEq1 Pb Zn Ag (Mt) % % g/t % kt kt koz Inferred 0.6 5.3% 1.0% 23 6.1% 31 6 427 A Sub Total 0.6 5.3% 0.1% 23 6.1% 31 6 427 Measured 1.4 3.8% 0.3% 19 4.5% 52 4

  29. Slide 29: Metal Equivalent Calculations

    28 Metal Equivalent Calculations For personal use only The contained metal equivalence formula is based It is Boab’s opinion that all elements included in the metal equivalent calculation have a reasonable on the Sorby Hills FEED Study including: potential to be recovered and sold. The formula used