Slide 1: NorthWestern Energy – ETAC Meeting
NorthWestern Energy – ETAC Meeting October 19, 2021 1. Intro and Welcome (1:00-1:10) 2. Price Forecasting (1:10-2:30) 3. Capacity Accreditation Update (2:30-3:00) • Updated ELCC Values • Break (5 min) 4. Resource Cost Update (3:05-3:35) 5. Portfolio Construction (3:35-4:15) • Stakeholder Requested P
Slide 2: Price Forecasts
Price Forecasts Western’
Slide 3: Price Forecast used in 2020 Supplement
Price Forecast used in 2020 Supplement 3
Slide 4: Power Price Forecast - Construction
Power Price Forecast - Construction • NorthWestern’s Power Price Forecast has 3 main components: 1. Futures Prices for power at Mid-C (source: ICE) 2. Long-term forecast of market heat rates (source: Ascend) 3. Forecast of natural gas prices (source: ICE, EIA) • These are combined for the full forec
Slide 5: Power Price Forecasts – updated Quarterly
Power Price Forecasts – updated Quarterly NWE Base Power Price Forecast (ATC) $45 $40 $35 $30 $/MWh $25 $20 $15 $10 $5 $- 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 2045 2019Q3 2019Q4 2020Q1 2020Q2 5 2020Q3 2020Q4 2021Q1 2021Q2
Slide 6: Power Price Forecasts – updated Quarterly
Power Price Forecasts – updated Quarterly NWE Base Price Forecast, by Forecast Vintage 20 year Levelized All-hours Price $45 $40 $35 $31.74 $32.77 $30.88 $30.29 $31.12 $31.33 $28.81 $29.94 $30 $25 $20 $15 $10 $5 $- 6 2019Q3 2019Q4 2020Q1 2020Q2 2020Q3 2020Q4 2021Q1 2021Q2
Slide 7: Price Forecasting Ascend Presentation
Price Forecasting Ascend Presentation 7
Slide 8: Capacity Accreditation
Capacity Accreditation Western’
Slide 9: E3 ELCCs from 2020 Supplement
E3 ELCCs from 2020 Supplement 9
Slide 10: Capacity Accreditation Review
Capacity Accreditation Review • ELCCs calculated by E3 with RECAP for 2020 Supplement • Refreshed by NorthWestern with RECAP in 2021 • Updated Portfolio and Load Forecast • Laurel Natural Gas (175 MW) • Powerex Contract (100 MW) • Expected QFs • 305 MW Wind (Teton, Pondera, Wheatland, Jawbone, CBC 2
Slide 11: 2021 Updated RECAP ELCCs
2021 Updated RECAP ELCCs Effective Capacity Provided by Different Resources, 2021 A B C D E Additional Nameplate Charging 25 MW 50 MW 100MW 200MW 300MW 400MW 500MW Capacity (MW) From Standalone 3hr Grid 63% 60% 53% 42% 35% 31% 28% Storage 4hr Grid 68% 65% 58% 48% 41% 35% 32% 6hr Grid 76% 73% 68% 59%
Slide 12: Incremental Effective Capacity
Incremental Effective Capacity Incremental Effective Capacity (MW) Additional Nameplate 100MW 200MW 300MW 400MW 500MW Capacity (MW) Incremental Nameplate +100MW +100MW +100MW +100MW +100MW Capacity (MW) Standalone 4-hr Storage 58 38 27 18 16 Standalone 10-hr Storage 76 66 46 33 26 Solar PV (Simulate
Slide 13: Cumulative Effective Capacity
Cumulative Effective Capacity Cumulative Effective Capacity (MW) Cumulative Nameplate 100MW 200MW 300MW 400MW 500MW Capacity (MW) Standalone 4-hr Storage 58 96 124 142 158 Standalone 10-hr Storage 76 142 188 221 247 Solar PV (Simulated) 10 15 18 20 21 Wind (Historical) 5 9 12 16 19 Cumulative ELCCs
Slide 14: 2021 Updated RECAP ELCCs
2021 Updated RECAP ELCCs Effective Capacity Provided by Different Resources, 2021 A B C D E 1. Saturation from Additional Nameplate Charging 25 MW 50 MW 100MW 200MW 300MW 400MW 500MW storage in base Capacity (MW) From portfolio moves Standalone 3hr Grid 63% 60% 53% 42% 35% 31% 28% down the curve. St
Slide 15: Diminishing ELCC of Storage Additions
Diminishing ELCC of Storage Additions 15
Slide 16: Diminishing ELCC Curve Flattens Eventually
Diminishing ELCC Curve Flattens Eventually 16
Slide 17: 2021 Updated RECAP ELCCs
2021 Updated RECAP ELCCs Effective Capacity Provided by Different Resources, 2021 A B C D E Additional Nameplate Charging 1. Synergistic 25 MW 50 MW 100MW 200MW 300MW 400MW 500MW Capacity (MW) From relationship with Standalone 3hr Grid 63% 60% 53% 42% 35% 31% 28% storage in base Storage 4hr Grid 68%
Slide 18: Resource Costs
Resource Costs Western’
Slide 19: Resource Costs –2022 Plan Update
Resource Costs –2022 Plan Update Costs information for portfolio modeling to be drawn from two sources: 1. NREL Annual Technology Baseline (ATB) 2. RFP Bids/Engineering Estimates Cost estimates are informational only. Actual resource acquisition decisions are made through actual offers. 19
Slide 20: Resource Types and Data Sources
Resource Types and Data Sources Data Source Resource Type NREL ATB RFP/Engineering Wind ● ● Solar ● ● Geothermal ● ● NG Combined Cycle ● ● NG Simple Cycle ● ● NG RICE ● Nuclear ● ● Battery Storage ● ● Pumped Hydro ● Solar + Storage Hybrid ● ● Wind + Storage Hybrid ● 20
Slide 21: 2021 ATB Cost Curve Update - Storage
2021 ATB Cost Curve Update - Storage 21
Slide 22: 2021 ATB Cost Curve Update - Solar
2021 ATB Cost Curve Update - Solar 22
Slide 23: 2021 ATB Cost Curve Update - Wind
2021 ATB Cost Curve Update - Wind 23
Slide 24: Portfolio Requests
Portfolio Requests Western’
Slide 25: Stakeholder Portfolio Requests
Stakeholder Portfolio Requests • Submit requests by Dec 1 using new feedback form (link here and below) • We will review and follow up with any questions (can discuss at Dec mtg) • Key factors to consider: • To be comparable, portfolios must have the same level of reliability (capacity contribution)
Slide 26: Portfolio Capacity
Portfolio Capacity Montana Portfolio Nameplate Capacity 30 m Solar 25 = Wind @ Battery 20 ™ Market Contracts @ Natural Gas 15 mCoal 10 Hydro mSolar o = Wind mw Battery 00 mt 7 af i a ae | = = @ Market Contracts Gw “0.5 @ Natural Gas Coal -1.0 Hydro 2022 2027 2032 2037 2042 NorthWestern Energy Delive
Slide 27: Portfolio Energy
27 Portfolio Energy Montana Portfolio Annual Energy Generation GWh 2022. 2024 2026 2028 2030 = 2032 8,000 7.00 ——__B- = alee 6,000 5,000 4,000 3,000 2,000 41,000 0 2034 2036 2038 2040 2042 2044 mmm Solar mmm Wind ME Battery mmm Market Contracts lms Natural Gas Mm Coal mms Hycro ee= load NorthWestern
Slide 28: Stakeholder Portfolio Requests
Stakeholder Portfolio Requests • Submit requests by Dec 1 using new feedback form (link here and below) • We will review and follow up with any questions (can discuss at Dec mtg) • Key factors to consider: • To be comparable, portfolios must have the same level of reliability (capacity contribution)
Slide 29: New Website
New Website • Supply Planning Website: • https://www.northwesternenergy.com/about-us/gas-electric/electric-supply- resource-procurement-plan • Please sign up for the email distribution list: • https://lp.constantcontactpages.com/su/XE0SdNG • Submit portfolio requests and other feedback via the new f
Slide 30: NorthWestern Energy – ETAC Meeting
NorthWestern Energy – ETAC Meeting August 4, 2021 Thank you. 30