  1. Slide 1: Corporate Presentation – September 2011

    Corporate Presentation – September 2011 Exploration & Development in Kurdistan

  2. Slide 2: A Lundin Group Company

    SHAMARAN petroleum corp A Lundin Group Company )))) ShaMaran Petroleum BlackPearl Resources Africa Oil SHAMARAN . A H. Etrion Lundin Petroleum petroleum | PLesndin_| 4” 4 4 LUNDIN GROUP Atacama Lucara Diamond Minerals Corp. See Lundin Mining TEX Lucara rSharecik Corp. lundin mining ATAS Sas Vv Vv Vv

  3. Slide 3: In the Heart of the Middle East: Kurdistan

    In the Heart of the Middle East: Kurdistan 3 Kurdistan » Over 55% of the World’s oil reserves are in the Middle East * » Kurdistan region is projected to have 70 billion barrels of oil reserves and 200 TCM of gas** » Kurdistan is the only region in the Middle East which is open to industry with good

  4. Slide 4: ShaMaran in the Land of the Giants

    ShaMaran in the Land of the Giants 4 Pursuing Exploration, Appraisal & Development Opportunities..... .....in one of the World’s most prolific petroleum provinces

  5. Slide 5: Kurdistan – Virtually Unexplored

    Kurdistan – Virtually Unexplored 5 » Less than 10 exploration wells drilled in Kurdistan prior to 2006 due to politics and predominance of Kirkuk » Prior drilling based on surface anticlines and seeps - no seismic KURDISTAN » 25 wells drilled in the last 5 years with over 70% success rate for findin

  6. Slide 6: Additional Industry Interest Imminent

    Additional Industry Interest Imminent 6 » Most of the prospective acreage has been taken up Kurdistan » Largest oil companies working in the south are not working in Kurdistan » Passing of the Oil & Gas Law would spark a significant additional interest in Kurdistan » New entrants will have to pay a

  7. Slide 7: Asset Summary

    Asset Summary 7 ShaMaran has one of the best acreage positions in Kurdistan: » Pulkhana oilfield appraisal / development » Atrush world class oil discovery » Two high potential exploration blocks ShaMaran Gross Block Working Partners Operator Acres Status Interest Map showing current and near future

  8. Slide 8: The Opportunity

    The Opportunity 8 » Previous discovery on block » Major new discovery with upside » Significant contingent resources + upside »Plans for an aggressive » Appraisal and workover drilling appraisal / programme including an EPS » Early production system (EPS) »3D seismic in progress being implemented »

  9. Slide 9: Atrush Block

    Atrush Block 9 » Between the significant Gulf Keystone Shaikan discovery and the Hillwood Swara Tika-1 discovery » Gross oil column of over 700 meters » 120 meters net matrix in the Jurassic Additional 140 meters potential net pay in Jurassic Butmah and Cretaceous (logged with good oil shows) » Atru

  10. Slide 10: Atrush-1 Jurassic Oil Discovery

    Atrush-1 Jurassic Oil Discovery 10 Atrush discovery Gross Prospective Resources* Low Best High (MMBO) (1C) (2C) (3C) Gross Volumetrics* (MMBO) Low Best High Cretaceous STOIIP 15 208 451 (1C) (2C) (3C) Jurassic STOIIP 125 220 416 Discovered Jurassic STOIIP 1075 1423 1891 Footwall STOIIP 9 59 196 Cont

  11. Slide 11: Aggressive Atrush Appraisal Programme

    Aggressive Atrush Appraisal Programme 11 »Appraisal plan submitted to KRG »3D seismic ( over 275 sq. kms ) underway »Appraisal drilling to commence in 2012 Bijeel Discovery »Considering Early Production System for long-term test »Generate early cash flow Shaikan Discovery Atrush-1 Mus Formation Test

  12. Slide 12: Pulkhana Oilfield

    Pulkhana Oilfield 12 » Legacy discovery (tested 2,950 bopd from two horizons in Pulkhana-5 in 1956). Kirkuk 26 BBO » Awarded as a field appraisal / development Jambur 1.2 BBO project. On trend to major fields in the area Pulkhana » One of the four PSC’s awarded prior to 1950 ‘s well tested >2,900 bo

  13. Slide 13: Pulkhana Drilling

    Pulkhana Drilling 13 NW Pulkhana Lead » Completed drilling of first appraisal well in 111 days » Testing ongoing – 6 DSTs. Results to be announced in late September Pulkhana » Plan for 3 wells (2 new + 1 legacy well) on Early Production Field during 2012, producing 8-10 kbopd (gross) Pulkhana-9 Pulk

  14. Slide 14: Arbat Prospect & Leads Summary

    Arbat Prospect & Leads Summary 14 » High potential exploration block (over 930 km2 with active petroleum system) » Two prospects (Potential PIIP 600 MMB): » Arbat-A: Main prospect (Arbat-1) E » Arbat-B: Shallow Cretaceous prospect (success could prove the shallow Cretaceous play in the block) F » Fo

  15. Slide 15: Arbat Structural Leads – Large Surface Anticlines

    Arbat Structural Leads – Large Surface Anticlines 15 3 large surface anticlines: » Lead E has closure in dip direction – Strike direction to be determined by new seismic » Lead F has closure in strike direction – Dip direction to be determined by new seismic » Possible closure in front of Lead E (si

  16. Slide 16: Taza (formerly Block K42)

    Taza (formerly Block K42) 16 A’ » Option agreement converted to PSC K42 » Acquired, processed & interpreted 232 line-kms of 2D seismic (vs. commitment A of 200 line-kms) » Significant drillable 4-way dip-closed prospect identified » Billion+ barrel potential. On trend to Jambur (1.2 BBO) K42 A Prosp

  17. Slide 17: Converting Resources to Reserves

    Converting Resources to Reserves 17 Aggressive Schedule: Subject to partner and Government approval

  18. Slide 18: Key Issues / Risks

    Key Issues / Risks 18 Politics: » Moving in the right direction. Petroleum Law in Parliament » Baghdad & Erbil working towards resolutions of issues » Cost recovery payments on exports from Kurdistan a major milestone Gas vs. Oil: » Two assets (Pulkhana & Atrush) are oil only » Increasing evidence t

  19. Slide 19: Building Value

    Building Value 19 Valuations are difficult due to lack of pure or publicised transactions Estimated value of Contingent Resources / 2P reserves in the range of $4- $8 per barrel

  20. Slide 20: Lundin Group Track Record for Shareholder Return

    Lundin Group Track Record for Shareholder Return 20 Company 2002 Present Notes Tanganyika $0.55/share $31.50/share Sold to Sinopec 2008 $13.5 million MC $1.9 billion MC Valkyries $0.45/share $16.00/share Sold to Lundin $4 million MC $750 million MC Petroleum 2006 Red Back $1.35/share (2000) $30.50/s

  21. Slide 21: Health, Safety & Environment (HSE)

    Health, Safety & Environment (HSE) 21 » Good working relationship with local authorities, communities in the area » Excellent Corporate HSE record - No Loss Time Incidents (LTIs) » No security incidents in the area of operations » Targeted CSR projects have created goodwill in the area

  22. Slide 22: Key Points

    Key Points 22 » One of the best acreage positions in one of most prospective areas in the world » Size potential of SNM’s projects similar to recent discoveries in Kurdistan » Cash >$ 50 million » Mean unrisked PIIP (gross) in excess of 3.3 billion barrels in four projects » Two discoveries and two

  23. Slide 23: Profile & Contacts

    Profile & Contacts 23 » Symbol TSX V: SNM www.shamaranpetroleum.com » Share Capital Issued and outstanding 680,483,860 shares Fully diluted 683,692,194 shares » Directors and Management » Keith Hill, Chairman of the Board » Pradeep Kabra, Director, President and CEO » J. Cameron Bailey, Director » B

  24. Slide 24: Cautionary Statements

    Cautionary Statements 24 This document contains statements about expected or anticipated future events and financial results that are forward-looking in nature and, as a result, are subject to certain risks and uncertainties, such as legal and political risk, civil unrest, general economic, market a