Swiss Re AG · SIX:SREN
Swiss Re — Technical Presentation (October 2021)
22 slides from Swiss Re's technical presentation, Oct 5, 2021
Slide 1: Robotic fabrication of timber assemblies
Robotic fabrication of timber assemblies Dr. Aleksandra Anna Apolinarska 05.10.2021 Swiss Re, Rüschlikon | Tomorrow’s Timber
Slide 2: The Sequential Roof, Future Tree, DFAB HOUSE, Spatial Timber Assemblies
The Sequential Roof Future Tree DFAB HOUSE Spatial Timber Assemblies Portal robot / ERNE AG Holzbau Robotic cell / ERNE AG Holzbau Robotic Fabrication Lab / ETH Zürich
Slide 3: Arch_Tec_Lab
Arch_Tec_Lab / ETH Zurich Campus Hönngerberg (Fot.: A.Diglas) Arch_Tec_Lab
Slide 4: The Sequential Roof
The'Sequential Roof ETH zurich
Slide 5: The Sequential Roof / Early prototypes (2011)
The Sequential Roof / Early prototypes (2011)
Slide 6: (c) ERNE AG Holzbau
(c) ERNE AG Holzbau
Slide 7: The Sequential Roof / Layer-by-layer connections using nails
The Sequential Roof / Layer-by-layer connections using nails
Slide 8: Automated documentation of the nailed connections
The Sequential Roof / Automated documentation of the nailed connections (ROB Technologies)
Slide 9: Final model color-coded by slat cross-sections
Total wood volume: Optimized design: 385 m3 Uniform model (180mm): 539 m3 (+40%) 180 mm 140 mm 115 mm The Sequential Roof / Final model color-coded by slat cross-sections
Slide 10: Data, Processing, Fabrication
Data Processing Fabrication Data ., Fabrication = Structural Analysi: 3/21-22/13 Nai] 3/20-21/236_nat | 3/20-21/23a Nal Is 3/20-21/226 Nal 1s 3/20-21/22a Nal 15: 3/20-21/21b Nal Is 3/20-21/91a Nats: 3/20-21/206_Nat 15: 3/20-21/20a Nal 1s: 3/20-21/195_Nat 15: 3/20-21/19a Nal 1s 3/20-21/18b Nal 1s: 3/
Slide 11: Future Tree / Basler & Hofmann office courtyard
Future Tree / Basler & Hofmann office courtyard in Esslingen, Switzerland
Slide 12: Concrete column and timber elements
concrete column 107 m2 ca. 10x10m 380 timber elements cantilevering corner 12
Slide 13: Future Tree
Future Tree
Slide 14: Fabrication setup / ERNE AG Holzbau
Fabrication setup / ERNE AG Holzbau 1. Cut at both ends 2. Pre-drill screw holes 3. Hold at target position
Slide 15: FutureTree / Robotically prefabricated segments
FutureTree / Robotically prefabricated segments
Slide 16: DFAB HOUSE / Dübendorf CH
DFAB HOUSE / Dübendorf CH (Fot.: R. Keller)
Slide 17: DFAB HOUSE / Spatial Timber Assemblies
DFAB HOUSE / Spatial Timber Assemblies / Robotic Fabrication Lab ETH Zürich
Slide 18: Deep Timber / Gramazio Kohler Research + Autodesk Robotics Lab
Deep Timber / Gramazio Kohler Research + Autodesk Robotics Lab AUTODESK ROBOTICS LAB
Slide 19: Augmented Acoustics / incon.ai
Augmented Acoustics / with: T. Sandy (incon.ai), Basler&Hofmann, ERNE AG Holzbau incon.ai
Slide 20: Augmented Acoustic / Human-led assembly using augmented reality
Augmented Acoustic / Human-led assembly using an augmented reality system
Slide 21: Robotic fabrication of timber assemblies
Robotic fabrication of timber assemblies Dr. Aleksandra Anna Apolinarska 05.10.2021 Swiss Re, Rüschlikon | Tomorrow’s Timber
Slide 22: Basic Copyright Notice & Disclaimer
Basic Copyright Notice & Disclaimer © 2021 This presentation is copyright protected. All rights reserved. You may download or print out a hard copy for your private or internal use. You are not permitted to create any modifications or derivatives of this presentation without the prior written permis