Pantoro Gold Limited · ASX:PNR
Pantoro Gold — Pacific Niugini — Capello Conference, Los Angeles, January 2013
17 slides from Pantoro Gold's conference presentation, Jan 14, 2013
Slide 1: Focussed on Low Cost Gold Production
For personal use only Focussed on Low Cost Gold Production Capello Conference, Los Angeles, January 2013 ASX : PNR
Slide 2: Disclaimer
Disclaimer For personal use only General Disclaimer This presentation has been prepared by Pacific Niugini Limited (“Pacific Niugini” or the “Company”). It should not be considered as an offer or invitation or inducement to subscribe for or the purchase of any securities in the Company. This present
Slide 3: Who is Pacific Niugini
Who is Pacific Niugini For personal use only ASX listed developer and explorer with two clear focuses 1. Short term gold production through low cost gravity processing operations; 2. Discovery of world class gold and copper – gold deposits in Papua New Guinea Large scale gold bearing gravel deposits
Slide 4: Corporate Structure
Corporate Structure For personal use only Board: Peter Cook – Non-Executive Chairman. Highly successful Australian mining identity behind companies such as Hill 50 Gold Limited; Abelle Limited, and Metals X Limited; Paul Cmrlec – Managing Director. Mining engineer with strong operational and corpora
Slide 5: PNG Assets
PNG Assets For personal use only EL 1616/ML457 Bulolo – Near term production opportunity with infill program ahead of production recently completed and approvals documentation submitted; EL1614/EL2013 Garaina – Exciting exploration results throughout the past two years. Ready for significant dri
Slide 6: Bulolo – Morobe Province
Bulolo – Morobe Province For personal use only 6
Slide 7: Bulolo Gold Project
Bulolo Gold Project For personal use only PNG’s forgotten (and one of the most Raised terraces in prolific) goldfields the area are generally Historical production of 2.1 million gold bearing and un- ounces at average grade of 0.31g/m3 mined Large areas of gravel left un-mined in raised terraces
Slide 8: Garaina – Morobe Province
Garaina – Morobe Province For personal use only 8
Slide 9: Garaina “Advanced Exploration Prospect”
Garaina “Advanced Exploration Prospect” For personal use only Exploration success story Pure green fields exploration to advanced drill target in < 1 year. High grade surface outcrop results in trench samples at Kusi including: • 71m @ 4.96 g/t Au, 4.77 g/t Ag • 34m @ 3.29 g/t Au, 39.17 g/t Ag •
Slide 10: Expansion to Mexico
Expansion to Mexico Key requirements for expansion outside of existing projects For personal use only 1. Either in production, or ability to bring to production quickly, preferably in gold; 2. Projects complimentary to skill sets; 3. Low cost operating environments; 4. Countries with stable policy a
Slide 11: Caldera Gold Project
Caldera Gold Project For personal use only 300km South of USA Border 11
Slide 12: Caldera Gold Project
Caldera Gold Project For personal use only Sonora, Mexico – Major gold and silver producing county - +40 Moz Au, +10 Bn Carbo Oz Ag Caldera Project Hermosillo (approx 80Km from Caldera) Capital of Sonora, major mining service centre. Excellent availability of mining equipment and services, heavy
Slide 13: Caldera Gold Project
Caldera Gold Project For personal use only Exciting results reported by current owners* 950kg sample by Resource Developments Inc, Colorado returned 0.57 g/t Au; Trench sampling in 30 x 9m deep pits returned 0.375 g/t gold; 95% of gold is >125μm (favourable for simple gravity recovery) Low ris
Slide 14: Caldera Gold Project: Acquisition Details and Work Program
Caldera Gold Project For personal use only Acquisition Details and Work Program Due Diligence - Jan 13 Finalisation of formal agreements – Jan/Feb 13 Shipping test plant – Feb 13 Initial testing – Feb/March 13 Permitting, laboratory testing, project services and logistics planning – Q2/Q3 1
Slide 15: Production Plant
Production Plant For personal use only Major plant already owned with 750m3/hr (10 million tonne per annum) nameplate capacity.; Plant purchase secondhand in near new condition. Reconfigured for maximum operability by PNR. Approximately 3 months required for completion; Modular design makes tr
Slide 16: Low cost, high profitability
Low cost, high profitability For personal use only Project Development and Operating Costs* Plant Capital Cost – Approximately $5 million; Total Project Capital – variable between projects - $10 to $20 million for circa 10 million tonne per annum capacity; Operating cost range - $2.10 to $2.80
Slide 17: Summary
Summary For personal use only Production focused with bulk testing underway Extensive testing undertaken at Bulolo in PNG. Additional large scale placer deposits in PNG awaiting testing, with further lease applications being processed; Exciting opportunity at the Caldera Project in Mexico with e
Pacific Niugini — Capello Conference, Los Angeles, January 2013 on 6ix