Provenance Gold Corp. · CSE:PAU
Provenance Gold — Investor Presentation (February 2026)
26 slides from Provenance Gold's investor presentation, February 2026
Slide 1: Exploring the Next Major Gold System in Eastern Oregon
CSE OTCQB PAU PVGDF EXPLORING THE NEXT MAJOR GOLD SYSTEM IN EASTERN OREGON
Slide 2: Overview - Eldorado Project
Overview ELDORADO PROJECT The Eldorado Project is a district-scale land position totaling 7,915 acres (32.03 km2) located 60 kilometres (38 miles) northwest of Vale in Malheur County, Oregon. The project benefits from excellent nearby infrastructure, road accessibility, and local and federal support
Slide 3: Eldorado Project Highlights
Eldorado East Highlights ▪ Historical open-ended resource estimates at Sunday Hill**: ELDORADO PROJECT 154,000 oz+ at 23.15 g/t gold 50,000 oz+ at 9 g/t gold ▪ Recently acquired 5,867 acres ▪ Ground-work, sampling and drill permitting underway ▪ Expected to be drill-ready by Summer 2026 **The refere
Slide 4: Proven Metallurgy: De-risking the Path to Production
Proven Metallurgy 2023 Recovery Results from Gravity and Flotation Tests DE-RISKING THE PATH TO PRODUCTION* Head Au Assay (ppm) Recovery Sample Back Calc From Ore Types Positive metallurgical testing from both modern and historical Direct (50g) (%) Test (3kg) work confirms the gold at Eldorado is am
Slide 5: Eldorado West
Eldorado West ELDORADO PROJECT The 2,048-acre property hosts a large diorite intrusion-related gold system, with pervasive mineralization localized within and around diorite contacts and fault-related fracture zones — the likely pathways for bulk tonnage, high-grade gold deposition. Historic mining,
Slide 6: Tyee Area
Tyee Area ASSAYS PENDING ED-21 ED-26 HOLE COMPLETE 2025 RC DRILLING* ED-23 Intersected gold mineralization has confirmed broad, coherent, pervasive zones extending the open-ended mineralization from ED-34 ED-22 east to west over 800 meters, with new mineralization identified ED-16 between Zones 2, 3
Slide 7: Herman Area
ASSAYS PENDING HOLE COMPLETE Herman Area 2025 DRILLING* Drill holes ED-27, ED-28 and ED-29 intersected broad gold mineralization from surface and identified a new mineralized contact zone between the diorite intrusive complex and the host metasedimentary rocks. Drill holes EC-04 and EC-05 confirmed
Slide 8: Tyee Area, SW – NE Section (Looking NW)
Tyee Area, SW – NE Section (Looking NW) ELDORADO WEST A A’ 1 Km Zone 4 Zone 3 Zone 2 Zone 1 Gold g/t A’ ED-22 > 1.00 ED-33 ED-17 ED-26 ED-21 0.75 – 1.00 ED-34 ED-31 ED-30 ED-13 A ED-12 ED-15 0.50 – 0.75 ED-14 ED-18 ED-16 0.25 – 0.50 ED-20 ED-35 ED-19 0.10 – 0.25 ▪ Potential to infill all zones 0.05
Slide 9: North-South Cross Section (Looking West)
North-South Cross Section (Looking West) B’ ELDORADO WEST B 1.3 Km HERMAN AREA TYEE AREA EXPANSION TARGET EC-07 (assays in progress) Gold g/t B EC-04 > 1.00 0.75 – 1.00 0.50 – 0.75 0.25 – 0.50 B’ 0.10 – 0.25 0.05 – 0.10 < 0.05 200 m *Older claim boundary shown 9
Slide 10: North-South Cross Section (Looking Northeast)
North-South Cross Section (Looking Northeast) ELDORADO WEST C C’ TYEE AREA 1.0 Km HERMAN AREA Gold g/t > 1.00 0.75 – 1.00 C 0.50 – 0.75 0.25 – 0.50 C’ 0.10 – 0.25 0.05 – 0.10 < 0.05 *Older claim boundary shown 10
Slide 11: Geology
Geology ELDORADO WEST ▪ 2026 drilling plans to test and extend known mineralization into 3 principal target Zone 2 areas which have little to no historic drilling. Extension ▪ 2025 geologic mapping demonstrates the relationship between porphyry intrusions and grade in drilling. Gold mineralizing flu
Slide 12: Eldorado East
Eldorado East ELDORADO ELDORADO PROJECT EAST The Eldorado East addition increased the size of the land package by approx. 5,867 acres (23.74 km2) through a combination of staking and an option agreement. The property hosts numerous mines and prospects, including two historical open-ended resource es
Slide 13: Mormon Basin
Mormon Basin ELDORADO EAST ▪ The Mormon Basin extends across much of the Eldorado East property ▪ Hosts numerous historic high-grade lode and placer gold mines dating back to the late 1800s and early 1900s ▪ Has seen very little systematic or modern exploration ▪ Provenance believes the near-surface
Slide 14: Capitalization
Capitalization PAU PVGDF AS OF FEB 2026 CSE OTCQB 186,568,520 56,893,207 12,330,000 255,791,727 SHARES ISSUED WARRANTS OPTIONS FULLY DILUTED WARRANT SCHEDULE Expiry Price Number 2026-09-22 $0.12 13,337,500 2027-06-28 $0.12 10,570,763 2027-10-09 $0.12 16,571,219 2028-07-17 $0.25 6,789,725 2030-10-27
Slide 15: Meet The Team
Meet The Team CORPORATE Rob Clark Rauno Perttu Thomas Martin CEO, PRESIDENT & DIRECTOR CHAIRMAN OF THE BOARD DIRECTOR Mr. Clark is a driven entrepreneur and venture capitalist Mr. Perttu is a registered professional geologist whose Mr. Martin has managed and invested in several with over twenty-five
Slide 16: Disclaimers
Disclaimers CORPORATE General Disclaimer & Forward-Looking Statements The information contained herein is provided by Provenance Gold Corp. (“PGC” or “Provenance”) for Eldorado Historical Estimate informational purposes only and does not constitute an offer to issue or arrange to issue, or the solic
Slide 17: Corporate Office
Corporate Office 885 West Georgia Street, Suite 2200 Vancouver, BC, Canada V6C 3E8 CSE PAU OTCQB PVGDF Q, +1-236-201-GOLD (4653) @ email@provenancegold.com © provenancegold.com @® Vln © ProvenanceGold
Slide 18: Appendix
eats ORE [eau } [evebe APPENDIX
Slide 19: Property Acquisition Terms
Property Acquisition Terms APPENDIX – ELDORADO PROJECT Eldorado West Eldorado East Provenance holds a binding option to purchase the property Provenance has been granted an option to acquire the Sunday Hill Project, which Eldorado East encompasses, for total consideration of US$400,000, from Nevada
Slide 20: 2023 Drilling Summary
2023 Drilling Summary APPENDIX – ELDORADO WEST Hole ID From (m) To (m) Width (m) Grade (g/t) Hole ID From (m) To (m) Width (m) Grade (g/t) ED-01 0 30.48 30.48 0.551 ED-07 0 114.3 114.3 3.085 ED-01 102.108 163.068 60.96 0.679 ED-07 inc 35.052 68.58 33.528 7.603 ED-01 inc 118.872 166.116 47.244 0.801
Slide 21: 2024 Discoveries
2024 Discoveries APPENDIX - TYEE AREA, ELDORADO WEST The 2024 core drilling program was highly successful, intersecting significant gold mineralization from surface, extending known zones, and discovering new, deeper high-grade structures. EC-01 returned the best intercept on the project to date and
Slide 22: 2024 Drilling Summary
2024 Drilling Summary APPENDIX – ELDORADO WEST Hole ID From (m) To (m) Width (m) Grade (g/t) EC-01 0 288.34 288.34 2.01 EC-01 Inc 7.92 183.18 175.26 3.07 EC-01 And 34.9 65.07 30.18 4.28 EC-01 And 86.01 126.34 40.33 3.48 EC-01 And 167.98 181.66 13.69 13.18 EC-01 Inc 175.56 181.66 6.1 21.7 EC-02 0 156
Slide 23: 2025 RC Drilling Summary
2025 RC Drilling Summary* APPENDIX – ELDORADO WEST Hole ID From (m) To (m) Width (m) Grade (g/t) Location ED-21 74.68 82.30 7.62 0.44 1 Hole ID From (m) To (m) Width (m) Grade (g/t) Location ED-21 And 103.63 193.55 89.92 0.45 ED-12 0.0 15.24 15.24 0.54 2 ED-21 Inc 103.63 155.45 51.82 0.62 ED-12 And
Slide 24: 2025 RC Drilling Summary
2025 RC Drilling Summary* APPENDIX – ELDORADO WEST Hole ID From (m) To (m) Width (m) Grade (g/t) Location Hole ID From (m) To (m) Width (m) Grade (g/t) Location ED27 0 179.83 179.83 0.67 Herman ED-30 22.860 91.44 68.58 0.67 Tyee Inc 44.196 88.392 44.2 1.25 Inc 50.292 59.436 9.14 1.18 And 71.628 79.2
Slide 25: 2025 Core Drilling Summary
2025 Core Drilling Summary* APPENDIX – ELDORADO WEST Hole ID From (m) To (m) Width (m) Grade (g/t) Location EC-04 4.27 24.38 20.12 0.51 Herman And 33.83 117.65 83.82 2.18 Inc 39.78 48.92 9.14 4.24 Inc 47.24 48.92 1.68 18.19 Inc 53.95 54.86 0.91 39.61 Inc 67.67 78.79 11.13 3.9 Inc 68.88 69.95 1.07 22
Slide 26: Historical Work
Historical Work APPENDIX – ELDORADO WEST Historical drilling included 237 reverse circulation holes and six core holes totaling 21,867 meters. The latest historical resource estimate*, conducted by Ican Minerals in 1997 was 1,980,000 oz Au with 90,000,000 contained tons at a grade of 0.753 g/t gold
Provenance Gold — Investor Presentation (February 2026) on 6ix