HARAPAKI WIND FARM INVESTMENT DECISION 24 FEBRUARY 2021
Slide 2: Today's announcement
Today’s announcement Meridian has committed to the construction of the Harapaki wind farm Highly attractive levelised cost of energy, well below the operating costs of aging thermal plant Strategic location above the transmission constraint south of Wairakei New renewables support decarbonis
Slide 3: Project overview and key suppliers
Project overview Key suppliers Supply, installation and maintenance Located within the Hastings of 41 x 4.3MW direct drive wind District, approximately 50km turbines drive from Port Napier Construction of all roads, turbine Extending over 9km of the foundations and crane hardstands Maungaharuru
Slide 4: Project overview
Project overview Main laydown area Grid Injection Point (GIP) O&M building to Taupo SH5 egress SH5 egress to Napier 2 4 F E B R UARY 2 0 2 1 HARAPAKI INVESTMENT DECISION 4
Slide 5: Project specifications
Project specifications 41 turbines x 4.3 MW mid 2024 final commissioning 176 MW initially funded through bank 542 GWh p.a. (P50 yield) facilities 145m tip height 260 jobs on site (peak) $395m capital investment 36 months construction time 23 km roading ~$35m EBITDAF p.a.1 232 km cabling $11 per MWh
Slide 6: Disclaimer
Disclaimer The information in this presentation was prepared by Meridian Energy with they are not defined by GAAP or IFRS, Meridian's calculation of these due care and attention. However, the information is supplied in summary measures may differ from similarly titled measures presented by other for