Slide 1: Ashton Coal Operations Community Consultative Committee Presentation – 6 July 2016
Ashton Coal Operations Pty Ltd Community Consultative Committee Presentation – 6 July 2016
Slide 2: Action List
Action List ITEM RESPONSIBILITY PROGRESS UPDATE Provide hard copies of the AEMR to CCC Members JB To be completed at this meeting 2 20 December 2024 2
Slide 3: Ashton Statistics
Ashton Statistics Ashton Coal Statistics 2016 Budget (YTD) 2016 Actual 2015 Actual (1/2 year) ROM (t) 894,465 890,407 1,383,534 Product Coal (t) 390,266 433,285 624,192 Total Coal Sales (t) 409,500 530,297 654,899 Lost Time Injury (LTIFR) 9.5 15.7 7.6 Total Recordable 25.53 20.9 27.8 Injuries (TRIFR
Slide 4: Current Operations
Current Operations • ACOL has recently commenced LW 105. This is a short panel and we plan to move into LW 106A in September. • Development is continuing in the Upper Lower Liddell seam forming longwall blocks and main headings. • South East Open Cut – no further movement. 4 20 December 2024 4
Slide 5: Exploration Activities
Exploration Activities No exploration was conducted in EL5860 or EL4918 during the reporting period. 5 20 December 2024 5
Slide 6: Approvals Update
Approvals Update As mining at ACOL progresses additional approvals are required to continue operations. Recent Approval determinations include: • DA Mod 5 • Mining Operations Plan amendment • Ausgrid Asset Management Plan • Bore licence for the South East Open Cut Upcoming Approvals • Currently work
Slide 7: DA Mod 5
DA Mod 5 • DA Mod 5 was prepared to allow for the integration of the Underground and SEOC approvals. • It was lodged in 2009 with the SEOC application and approved on 20 June 2016 by the Planning Assessment Commission (PAC). • The recent approval updates/modernises the Ashton Coal consent and we are
Slide 8: Environment Monitoring Data
Environment Monitoring Data ▪ The following slides present environmental monitoring data for the reporting period ▪ Meteorological • Rainfall ▪ Air Quality • Depositional Dust Gauges – Total suspended dust • PM10 – Tapered Element Oscillating Microbalance (TEOM) ▪ Surface Water – Glennies Ck, Bowman
Slide 9: Rainfall
Rainfall Rainfall at Repeater YTD Rainfall: 280 386mm 260 240 220 200 180 Rainfall (mm) 160 140 120 100 80 60 40 20 0 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Long Term Median Rainfall (mm) 9 20 December 2024 9
Slide 10: Air Quality & Noise Monitoring Locations
Air Quality & Noise Monitoring Locations 10 20 December 2024 10
Slide 11: Depositional Dust
Depositional Dust On-site Dust Gauges 11 20 December 2024 11
Slide 12: Total Suspended Dust
Total Suspended Dust 12 20 December 2024 12
Slide 13: Total Suspended Dust
Total Suspended Dust 13 20 December 2024 13
Slide 14: PM10 Dust – Site 1
PM10 Dust – Site 1 14 20 December 2024 14
Slide 15: PM10 Dust – Site 2
PM10 Dust – Site 2 15 20 December 2024 15
Slide 16: PM10 Dust – Site 3
PM10 Dust – Site 3 16 20 December 2024 16
Slide 17: PM10 Dust – Site 8
PM10 Dust – Site 8 17 20 December 2024 17
Slide 18: Surface Water Sampling Locations
Surface Water Sampling Locations 18 20 December 2024 18
Slide 19: Surface Water Quality – pH
Surface Water Quality – pH 19 20 December 2024 19
Slide 20: Surface Water Quality – EC
Surface Water Quality – EC 20 20 December 2024 20
Slide 21: Surface Water Quality – pH
Surface Water Quality – pH 21 20 December 2024 21
Slide 22: Surface Water Quality – EC
Surface Water Quality – EC 22 20 December 2024 22
Slide 23: Surface Water Quality – pH
Surface Water Quality – pH 23 20 December 2024 23
Slide 24: Surface Water Quality – EC
Surface Water Quality – EC 24 20 December 2024 24
Slide 25: Groundwater Sampling Locations
Groundwater Sampling Locations 25 20 December 2024 25
Slide 26: Groundwater – Standing Depth
Groundwater – Standing Depth 26 20 December 2024 26
Slide 27: Groundwater – EC
Groundwater – EC 27 20 December 2024 27
Slide 28: Noise Monitoring
Noise Monitoring Attended noise monitoring is conducted Monthly. There were no exceedances during the reporting period 28 20 December 2024 28
Slide 29: What else is going on?
What else is going on? ▪ Groundwater Bore Installation ▪ Gas Well Drilling ▪ Archaeological salvaging works ▪ 2016 NSW Minerals Council Environment Awards – Bowmans Creek Diversion is a finalist 29 20 December 2024 29
Slide 30: Community Support Program
Community Support Program ▪ Community projects supported by Ashton Coal in the Upper Hunter are during Q1 2016 include: Special Education Support Unit Singleton Public School P&F bicycle upgrade Witmores Tail lifter for truck Singleton Mayoral Scholarship Scholarship program awards ▪ 30 Sep 2016 – n
Slide 31: Camberwell update
Camberwell update ▪ Camberwell property • 32 homes tenanted, 1 vacant • Safety audit of electrical wiring through all homes • Upgrades to pool fencing to meet SSC compliance • Grass fire near 45 Glennies St – 13 April 2016 • Bloomfield purchasing of Ernst property ▪ Trevor Burgess – interest in CCC
Slide 32: Any Questions?
Any Questions? 32 20 December 2024 32