Yancoal Australia Ltd. · ASX:YAL

Yancoal Australia — Corporate Update (July 2016)

32 slides from Yancoal Australia's corporate update, Jul 6, 2016

  1. Slide 1: Ashton Coal Operations Community Consultative Committee Presentation – 6 July 2016

    Ashton Coal Operations Pty Ltd Community Consultative Committee Presentation – 6 July 2016

  2. Slide 2: Action List

    Action List ITEM RESPONSIBILITY PROGRESS UPDATE Provide hard copies of the AEMR to CCC Members JB To be completed at this meeting 2 20 December 2024 2

  3. Slide 3: Ashton Statistics

    Ashton Statistics Ashton Coal Statistics 2016 Budget (YTD) 2016 Actual 2015 Actual (1/2 year) ROM (t) 894,465 890,407 1,383,534 Product Coal (t) 390,266 433,285 624,192 Total Coal Sales (t) 409,500 530,297 654,899 Lost Time Injury (LTIFR) 9.5 15.7 7.6 Total Recordable 25.53 20.9 27.8 Injuries (TRIFR

  4. Slide 4: Current Operations

    Current Operations • ACOL has recently commenced LW 105. This is a short panel and we plan to move into LW 106A in September. • Development is continuing in the Upper Lower Liddell seam forming longwall blocks and main headings. • South East Open Cut – no further movement. 4 20 December 2024 4

  5. Slide 5: Exploration Activities

    Exploration Activities No exploration was conducted in EL5860 or EL4918 during the reporting period. 5 20 December 2024 5

  6. Slide 6: Approvals Update

    Approvals Update As mining at ACOL progresses additional approvals are required to continue operations. Recent Approval determinations include: • DA Mod 5 • Mining Operations Plan amendment • Ausgrid Asset Management Plan • Bore licence for the South East Open Cut Upcoming Approvals • Currently work

  7. Slide 7: DA Mod 5

    DA Mod 5 • DA Mod 5 was prepared to allow for the integration of the Underground and SEOC approvals. • It was lodged in 2009 with the SEOC application and approved on 20 June 2016 by the Planning Assessment Commission (PAC). • The recent approval updates/modernises the Ashton Coal consent and we are

  8. Slide 8: Environment Monitoring Data

    Environment Monitoring Data ▪ The following slides present environmental monitoring data for the reporting period ▪ Meteorological • Rainfall ▪ Air Quality • Depositional Dust Gauges – Total suspended dust • PM10 – Tapered Element Oscillating Microbalance (TEOM) ▪ Surface Water – Glennies Ck, Bowman

  9. Slide 9: Rainfall

    Rainfall Rainfall at Repeater YTD Rainfall: 280 386mm 260 240 220 200 180 Rainfall (mm) 160 140 120 100 80 60 40 20 0 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Long Term Median Rainfall (mm) 9 20 December 2024 9

  10. Slide 10: Air Quality & Noise Monitoring Locations

    Air Quality & Noise Monitoring Locations 10 20 December 2024 10

  11. Slide 11: Depositional Dust

    Depositional Dust On-site Dust Gauges 11 20 December 2024 11

  12. Slide 12: Total Suspended Dust

    Total Suspended Dust 12 20 December 2024 12

  13. Slide 13: Total Suspended Dust

    Total Suspended Dust 13 20 December 2024 13

  14. Slide 14: PM10 Dust – Site 1

    PM10 Dust – Site 1 14 20 December 2024 14

  15. Slide 15: PM10 Dust – Site 2

    PM10 Dust – Site 2 15 20 December 2024 15

  16. Slide 16: PM10 Dust – Site 3

    PM10 Dust – Site 3 16 20 December 2024 16

  17. Slide 17: PM10 Dust – Site 8

    PM10 Dust – Site 8 17 20 December 2024 17

  18. Slide 18: Surface Water Sampling Locations

    Surface Water Sampling Locations 18 20 December 2024 18

  19. Slide 19: Surface Water Quality – pH

    Surface Water Quality – pH 19 20 December 2024 19

  20. Slide 20: Surface Water Quality – EC

    Surface Water Quality – EC 20 20 December 2024 20

  21. Slide 21: Surface Water Quality – pH

    Surface Water Quality – pH 21 20 December 2024 21

  22. Slide 22: Surface Water Quality – EC

    Surface Water Quality – EC 22 20 December 2024 22

  23. Slide 23: Surface Water Quality – pH

    Surface Water Quality – pH 23 20 December 2024 23

  24. Slide 24: Surface Water Quality – EC

    Surface Water Quality – EC 24 20 December 2024 24

  25. Slide 25: Groundwater Sampling Locations

    Groundwater Sampling Locations 25 20 December 2024 25

  26. Slide 26: Groundwater – Standing Depth

    Groundwater – Standing Depth 26 20 December 2024 26

  27. Slide 27: Groundwater – EC

    Groundwater – EC 27 20 December 2024 27

  28. Slide 28: Noise Monitoring

    Noise Monitoring Attended noise monitoring is conducted Monthly. There were no exceedances during the reporting period 28 20 December 2024 28

  29. Slide 29: What else is going on?

    What else is going on? ▪ Groundwater Bore Installation ▪ Gas Well Drilling ▪ Archaeological salvaging works ▪ 2016 NSW Minerals Council Environment Awards – Bowmans Creek Diversion is a finalist 29 20 December 2024 29

  30. Slide 30: Community Support Program

    Community Support Program ▪ Community projects supported by Ashton Coal in the Upper Hunter are during Q1 2016 include: Special Education Support Unit Singleton Public School P&F bicycle upgrade Witmores Tail lifter for truck Singleton Mayoral Scholarship Scholarship program awards ▪ 30 Sep 2016 – n

  31. Slide 31: Camberwell update

    Camberwell update ▪ Camberwell property • 32 homes tenanted, 1 vacant • Safety audit of electrical wiring through all homes • Upgrades to pool fencing to meet SSC compliance • Grass fire near 45 Glennies St – 13 April 2016 • Bloomfield purchasing of Ernst property ▪ Trevor Burgess – interest in CCC

  32. Slide 32: Any Questions?

    Any Questions? 32 20 December 2024 32