Torr Metals Inc · TSXV:TMET

Torr Metals — Investor Presentation (October 2026)

15 slides from Torr Metals's investor presentation, October 2026

  1. Slide 1: Exploring brand new copper-gold discoveries in British Columbia's copper heartland

    ● DRILLING NOW · BERTHA NORTH Exploring brand new copper-gold discoveries in British Columbia’s copper heartland TSX-V: TMET Corporate Presentation · October 2026 Kolos Project, Sonic target · Highland Valley mine 30 km west

  2. Slide 2: Cautionary statements

    Cautionary statements Forward-looking statements This presentation contains forward-looking statements, including statements about exploration plans, drilling, anticipated results and the Company’s future objectives. Words such as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “w

  3. Slide 3: Drilling for a New Afton-style copper-gold porphyry system at a pre-discovery valuation

    TORR AT A GLANCE · WHY NOW Drilling for a New Afton-style high-grade copper-gold porphyry system, at a pre-discovery valuation DRILLING NOW NEW AFTON-STYLE EXPLORATION PRE-DISCOVERY VALUATION $10M ANALOGUE Supergene oxidized cap above intrusive-associated copper 3,500 of 6,000 m completed to date at

  4. Slide 4: Capital structure and leadership

    Capital structure and leadership Share price (Oct. 20, 2026) Market capitalization Malcolm Dorsey, John Williamson, Shares outstanding Fully diluted M.Sc., P.Geo P.Geo Taylor Niezen President, CEO & Director · Chairman · 30+ years CFO · Partner, Sprout exploration geologist, 15+ founding and financi

  5. Slide 5: Three projects, established mining jurisdictions with drive-on highway access

    Three projects, established mining jurisdictions with drive-on highway access Kolos Cu-Au · BC · 332 km² Flagship in BC’s Quesnel Trough, host to several producing copper mines with greatest concentration of major miners. Drilling now at Bertha North. Filion Au · Ontario · 202 km² Underexplored, nev

  6. Slide 6: Kolos Project: Surrounded by majors that need new copper

    Kolos Project: Surrounded by majors that need new copper in BC’s premier copper mining belt Majors within 100 km Teck, Hudbay, KGHM, Fortescue, Coeur, Glencore and Boliden New Afton end of mine life Expected to be the first major operation in the district to close Coeur acquires New Gold Includes Ne

  7. Slide 7: Market capitalization of comparable BC companies by stage

    Market capitalization of comparable BC companies by stage For context only. Torr may never achieve comparable results or valuations. Torr Metals TORR Pre-discovery · drilling now TORR TODAY Kodiak Copper Discovery & resource growth $68M GT Gold Acquired by Newmont in 2021 after $393M 2017 Saddle Nor

  8. Slide 8: Kolos: the flagship copper-gold project

    Kolos: the flagship copper-gold project in BC’s Quesnel Trough, host to several producing copper mines Previously undrilled porphyry Cu-Au targets covering ~12 km² east of Highland Valley; south and along- strike of New Afton and Ajax deposit trends paved access, no remote camp, lower-cost drilling

  9. Slide 9: Bertha North: from a new copper system toward its source

    Bertha North: from a new copper system toward its source PHASE II · HOLE 26-KO-04 Pyrite-chalcopyrite PHASE I · 2025 1 veinlets at 161.5 m (top) A new copper system confirmed and native copper at 2,700 m hit native copper to 580 m vertical depth along a 58.2 m (bottom) picrite corridor, a setting an

  10. Slide 10: Bertha North: vectoring toward a potential New Afton-style system

    Bertha North: vectoring toward a potential New Afton-style system PHASE II · 26-KO-04 Below Core Photo – 460.5 m Fine disseminated and locally fracture-controlled sulphides, principally pyrite ± chalcopyrite, associated with magnetite and pervasive pale feldspar – carbonate ± silica alteration Plan:

  11. Slide 11: Sonic and Kirby–Lodi: Pipeline untested large-scale porphyry targets

    Sonic and Kirby–Lodi: Pipeline untested large-scale porphyry targets Sonic · ~8 km² copper soil anomaly Kirby–Lodi · 24.5 km² hydrothermal footprint ~8 km² multi-centre Cu-Au soil anomaly, up to 3,090 ppm Cu and 420 ppb Au in Three soil targets (Lodi, Kirby, Ace) over magnetic destruction soil; anal

  12. Slide 12: A pipeline of drill-ready copper and gold targets

    A pipeline of drill-ready copper and gold targets KOLOS PROJECT · BRITISH COLUMBIA ONTARIO Bertha North Sonic Kirby–Lodi Kova Filion DRILLING NO W P ERMIT P ENDING DRILL P ERMIT T E D DRILL P ERMIT T E D DRILL P ERMIT T E D 6,000 m ~8 km² 24.5 km² ~1 km² 13.1 g/t multi-centre Cu-Au hydrothermal foot

  13. Slide 13: Filion: an underexplored gold corridor next to a highway in Ontario

    Filion: an underexplored gold corridor next to a highway in Ontario on the southern Quetico boundary, a underexplored gold corridor, 4 km structural setting mirroring the north of the Trans-Canada Highway Greenstone Mine* top 2025 rock grab (subcrop); only 140 of the property systematically explored

  14. Slide 14: Filion: gold at surface along a newly identified large-scale open structure

    Filion: gold at surface along a newly identified large-scale open structure Three target areas Oscar · magnetics (RMI) Oscar · VLF-EM conductivity West, Central (Oscar) and East along a first-order First modern sampling covers only 140 m of Gold-bearing grabs sit where a large fold meets structure w

  15. Slide 15: Positioned at the pre-discovery stage, drilling targeting a potential untested porphyry core

    WHY TORR, WHY NOW Positioned at the pre-discovery stage, drilling targeting a potential untested porphyry core in October 2026 ▼ TORR TODAY · $10M MARKET CAP PRE-DISCOVERY · DRILLING NOW DISCOVERY POTENTIAL Oct 2026 ~40 m 6,000 m $10M Drilling to target the untested First mineralized intrusive unit

Torr Metals — Investor Presentation (October 2026) on 6ix