  1. Slide 1: ASX cover letter for investor meetings

    For personal use only 16 November 2026 Company Announcements Office ASX Limited Dear Sir / Madam Enclosed are the reference materials to be used as part of investor meetings in Hong Kong and at the 2026 Morgan Stanley Annual Asia Pacific Summit, Singapore. This announcement was authorised by the CEO

  2. Slide 2: Karoon Energy update, Asia

    Karoon Energy update, Asia rsonal use only November 2026

  3. Slide 3: Disclaimer

    Disclaimer This presentation has been prepared by Karoon Energy Ltd (Karoon or the Company). The information contained in this presentation is for information purposes only and does not constitute an offer to issue, or arrange to issue, securities or other financial products. This presentation conta

  4. Slide 4: Karoon history

    Karoon history 12 Annual net production (MMboe) From explorer to producer and operator 10 6.6 – 7.27 8 6 rsonal use only 4 2 0 2020 2021 2022 2023 2024 2025 YTD 2026 2014 2020 2023 2007-2008 Poseidon sold to Baúna acquisition, Brazil Who Dat acquisition, Brazil Santos Origin for US$600m for US$380m

  5. Slide 5: Karoon at a glance

    Karoon at a glance Established producing platform with production upside and organic growth opportunities Strong foundation Our footprint and market access rsonal use only Brazil 100% owned Baúna field and FPSO. Karoon-operated US Gulf Coast Who Dat oil and gas. LLOG-operated hub with infill and tie

  6. Slide 6: Sustainable operations

    Sustainable operations1 rsonal use only Safety Climate Social Target - zero workplace injuries Target - Net Zero Scope 1 & 2 by Support the communities in or process safety events 2050 for operated assets2 which we operate 2026 to 30 Sept: 2026 to 30 Sept: 2025-2026 • TRIR: 0.14 injuries per 200,000

  7. Slide 7: 2026 YTD key metrics

    2026 YTD key metrics For nine months ended 30 September 2026 rsonal use only Production US$436.5m US$269.2m 5.29 MMboe Baúna WI / Who Dat NRI¹ Sales revenue (9m to 30 Sep 26) Net debt (at 30 Sep 26) 4.23 1.06 US$80.8m US$307.5m Baúna Who Dat Cash (at 30 Sep 26) Liquidity³ (at 30 Sep 26) Capital expe

  8. Slide 8: Strategy and capital allocation framework

    Strategy and capital allocation framework Fund base business, protect financial flexibility and allocate free cash flow to highest value use Operating cash flow rsonal use only Strategy • Safe and reliable operations with Non-discretionary capital spend1 continuous improvements • Restore and optimis

  9. Slide 9: Creating value for shareholders through capital returns

    Creating value for shareholders through capital returns Ongoing buybacks have reduced share count by 13% since 2024 Share buyback history Cumulative buybacks¹ Cumulative cash dividends² rsonal use only • On market buyback commenced 2H24 US$113.4m US$81.1m • To 30 Sept 26, have acquired and cancelled

  10. Slide 10: Operations underpinned by strong balance sheet

    Operations underpinned by strong balance sheet Preserving financial flexibility to manage today’s challenges and invest in tomorrow rsonal use only Liquidity supported by US$226.7m2 production cash flow and Undrawn undrawn RBL capacity2 Credit Facility Total liquidity US$307.5 million¹ US$80.8m Liqu

  11. Slide 11: Multiple pathways to organic production growth

    Multiple pathways to organic production growth Established production, sequenced projects and extensive exploration runway rsonal use only Neon3 Phase 2 (Neon West, Piracucá and Goiá) Neon² Exploration runway³ Conditional Development • FEED underway Who Dat South Conditional Development . Appraisal

  12. Slide 12: Baúna – Santos Basin, Brazil

    Baúna – Santos Basin, Brazil Strong 3Q26 performance, YTD production 4.2 MMbbl, YTD revenue US$356.4 million1 • Major investment program successfully completed in 2026, rsonal use only benefits of being integrated Baúna operator being realised: • FPSO efficiency 96%1 • On track for US$30-40m pa cost

  13. Slide 13: Baúna FPSO efficiency continues to exceed target

    Baúna FPSO efficiency continues to exceed target Investment translating into sustained operating performance rsonal use only • FPSO efficiency exceeded target range Consistently exceeding target Quarterly FPSO efficiency in last four quarters, driven by 2025 and 100% 99% 2026 FPSO flotel supported,

  14. Slide 14: Who Dat – Gulf of America, USA

    Who Dat – Gulf of America, USA YTD production 1.06 MMboe1, 2, YTD revenue US$80.1 million2 • Continued strong topside reliability (99%2) rsonal use only • Successful A1 ST came online in July, currently producing ~2,400 boepd NRI1, above expectations • G1 ST drilling. Production expected in 1H27 • P

  15. Slide 15: Who Dat FPS efficiency improvements

    Who Dat FPS efficiency improvements Consistent improvement - YTD through 3Q26 FPS efficiency of ~99% rsonal use only • No . recent large duration turnarounds Quarterly FPS efficiency 100% • Facility maintenance in mid-2025 included flash gas compression lube oil systems 95% TURNAROUND Target range 2

  16. Slide 16: Who Dat growth opportunities

    Who Dat growth opportunities Who Dat East sanctioned, Who Dat South progressing rsonal use only Who Dat East1 Who Dat South2 • One well, 29km tieback to Who Dat FPS • Seismic reprocessing ongoing, results expected in 1Q27 • Project sanctioned in August 2026 • Appraisal well planned mid-2027 • First

  17. Slide 17: Who Dat sanctioned production build-up

    Who Dat sanctioned production build-up1 Indicative and illustrative only, not guidance rsonal use only Production growth assumptions • G1 ST online in 1H27, drilling underway • E Field production restoration expected late 2027 • Who Dat East first oil expected in 2H28 • Unsanctioned projects being m

  18. Slide 18: Neon advances to FEED

    Neon advances to FEED 1 Targeting 2H27 FID, first oil in 2030 rsonal use only Selected concept locked Value accretive project Initial development well count confirmed IRR above targeted mid-teens post-tax hurdle rate • 3 production wells & 1 gas injection well to access • Post tax, unlevered IRR in

  19. Slide 19: Neon advances to FEED (cont.)

    Neon advances to FEED (cont.) FEED work and farm down preparation commencing rsonal use only Path to FID Potential funding plan Complete FEED engineering Farm down to commence by end 2026 • Validate FPSO upgrades, costs and timeline • Aim to farm down 30 – 50% interest to share • Refine well and sub

  20. Slide 20: Neon project decision gates

    Neon project decision gates1 Technical work and commercial agreements narrow costs, schedule and scope uncertainties rsonal use only Identify Select Define/FEED Execute Operate Uncertainty range DG1: DG2: DG3: DG4: Viability established Concept selected Final inv. decision Operations readiness Scope

  21. Slide 21: Exploration in Brazil

    Exploration in Brazil Large, high potential acreage position in south Santos Basin Brazil Santos Basin portfolio rsonal use only • Deepwater and Esmeralda blocks (100% KAR) near Baúna and Neon provide high potential, longer-term exploration optionality • Acreage contains both post and pre salt leads

  22. Slide 22: Commitments delivered and future catalysts

    Commitments delivered and future catalysts1 rsonal use only Delivered so far in 2026 Next 6 months 2027-2028 • Completed Baúna flotel turnaround • Who Dat G1 ST drilling underway • SPS-92 full reinstatement and work program activities (PRA-2 and SPS-92) • Neon farm-out commencement • Who Dat E field

  23. Slide 23: Summary: Disciplined delivery. Growth enabled. Financial strength.

    Summary: Disciplined delivery. Growth enabled​. Financial strength. rsonal use only Production and cash flow Organic opportunities Robust financing • Baúna and Who Dat are • Who Dat East - value accretive • Strong balance sheet, high-quality, low-cost assets in tier- development sanctioned, maintain

  24. Slide 24: Notes and Definitions

    Notes and Definitions 1. Karoon’s Reserves, Contingent and Prospective Resources as at 31 December 2025 are as disclosed in the 2025 Annual Report. Karoon is not aware of any new information or data that materially affects these resource estimates. 2. Reserves and Resources estimates are prepared in

  25. Slide 25: Appendix 1: Neon location map, Brazil

    Appendix 1: Neon location map, Brazil rsonal use only 24

  26. Slide 26: Appendix 2: Who Dat East and South location maps, USA

    Appendix 2: Who Dat East and South location maps, USA1 rsonal use only 1. The Who Dat East development has been sanctioned. The Who Dat South potential development is subject to relevant approvals, the results of an appraisal well planned for 2027 and is unsanctioned (see slide 15). 25