Power Mech Projects Ltd. · NSE:POWERMECH

Power Mech Projects — Q2 FY21 Earnings Presentation

32 slides from Power Mech Projects's earnings presentation, Nov 13, 2020

  1. Slide 1: Investors Presentation Q2 & H1 FY21

    Investors Presentation Q2 & H1 FY21 POWER MECH PROJECTS LTD Growth Unlimited 13th November 2020

  2. Slide 2: Disclaimer

    Disclaimer Safe Harbor Statement  The information contained herein has been prepared to assist prospective investors in making their own evaluation of Power Mech Projects Limited (hereinafter ‘the company’) and does not purport to be all-inclusive or to contain all of the information a prospective

  3. Slide 3: Power Mech – At a Glance

    Power Mech – At a Glance A leading Industrial Services and Construction Company providing versatile and comprehensive service in power and infrastructure sector Presently Operates Pan- Largest O&M service FY 20 Established in 1999 by Total Income: Rs 21,740 Mn Mr. S. Kishore Babu, a India, Middle Ea

  4. Slide 4: Journey of the Company, Major milestones and achievements

    Journey of the Company, Major milestones and achievements → Listing in BSE & NSE, overwhelming response → First ETC of 1 X 63 Tph and 2 X 165 → Private Equity into Power Mech subscribed by 38 times Tph AFBC Boilers, 20.85 MW & 55 → First major international work in Libya, 2X157 MW Erection → Major O

  5. Slide 5: Established Track Record

    Established Track Record Integrated power infrastructure services Track record of ~21 years  Established a track record of successfully 26,00,000 MT of aggregate tonnage of the erection works executed executing ETC-BTG and BOP contracts for large power projects 64,000 MW, engaged on ETC-BTG and BOP

  6. Slide 6: Our Service presence across key areas

    Our Service presence across key areas Industrial Industrial Construction Construction Industrial Services (O&M) International Operations Infrastructure Construction (Civil) Power Projects (Ultra Mega, Super  Overhauling and Maintenance of  Erection, Testing & Commissioni Power Plants, Railway, Ind

  7. Slide 7: Our Service presence across key areas (cont..)

    Our Service presence across key areas (cont..) Industrial Construction Electricals Hydro Power & Water Manufacturing  Extra High Voltage Substation  Supply & construction of Hydro  Fabrication of Heavy Structures, Works power plants Large & High Pressure Tanks,  Construction of 33/11 Kv  Renova

  8. Slide 8: Company Strengths

    Company Strengths Large talent with Highly Experienced Management Comprehensive service provider in Power Team with strong industry background Sector Largest service provider in O&M space Strong execution capabilities across verticals Well diversified business profile with stable Marquee clientele:

  9. Slide 9: Qualified Board

    Qualified Board Sajja Kishore Babu, CMD Sajja Lakshmi, Non Executive Director Founder of the company holds bachelor’s degree in She is a science graduate and holds place in HR Mechanical Engineering. He has 35 years of experience management of the company & also member of CSR in power and infra sect

  10. Slide 10: Professional and Experienced Management Team

    Professional and Experienced Management Team M. Rajendran, COO S Kodandaramaiah, Director – Business Development Degree in Civil Engineering. He has more than 38 years of Post graduate in mechanical engineering. More than 4 decades of experience in power and industry sector related to EPC, Construct

  11. Slide 11: Shareholding Pattern Top Shareholders

    Shareholding Pattern Top Shareholders S No Name Shares Category Percentage 0.88% 2.50% 1.34% 1 Promoters & Family 92,05,324 Promoter 62.58% 2.69% 5.28% Promoters 2 HDFC Small Cap Fund 10,03,126 MUT 6.82% 7.21% Resident Individuals 3 Vantage Equity Fund 6,29,553 AIF 4.28% 9.96% Mutual Funds 4 IDFC Mu

  12. Slide 12: Established Relationships with Clients – Domestic Projects

    Established Relationships with Clients – Domestic Projects 12

  13. Slide 13: Established Relationships with Clients – International Projects

    Established Relationships with Clients – International Projects 13

  14. Slide 14: Infra for Project Management

    Infra for Project Management Large construction equipment base SAP Primavera Site level, Support & functions MS Project- Productivity Application SBU Heads 8,700 HR Base For Project Engineers, Supervisors, Responsibility Technicians, HSE, FQA Other Staff Capability Centers Construction, Quality, Sa

  15. Slide 15: Business Strategy

    Business Strategy Expanding the services footprint & leveraging technical expertise to target higher margin contracts Expanding O&M profile and Back ward and forward Entering into value added services To integrate the construction increased penetration in the integration has been at the core by syne

  16. Slide 16: Expanding of O&M service into other sectors & new horizons

    Expanding of O&M service into other sectors & new horizons Solar Thermal Hydro Domestic O&M (AMC, R&M, GAS Steel Trouble (Power) shooting etc) Fully developed Captive Exports Power (Thermal) Partially developed Refinery & Petro Chemicals To be developed 16

  17. Slide 17: Expanding Horizons… Broadening Capabilities

    Expanding ExpandingHorizons…… Horizons…… …..Broadening …..BroadeningCapabilities Capabilities 17

  18. Slide 18: Q2 FY21 – YoY Consolidated Financial Performance

    Q2 FY21 – YoY Consolidated Financial Performance INR in million Total Income EBIDTA PAT 400 351 6,000 5,355 800 711 5,000 600 3,476 200 6.7% 4,000 13.3% 3,000 400 - 2,000 200 Q2FY20 Q2FY21 1,000 - (200) - Q2FY20 Q2FY21 Q2FY20 Q2FY21 (200) -11.7% -14.9% (400) (400) -405 (600) (600) (518) Q2 Revenue E

  19. Slide 19: H1 FY21 – YoY Consolidated Financial Performance

    H1 FY21 – YoY Consolidated Financial Performance INR in million Total Income EBIDTA PAT 12,000 10,285 1,500 1,373 800 635 10,000 600 8,000 6,244 1,000 400 13.4% 200 6.2% 6,000 500 - 4,000 (200) H1FY20 H1FY21 2,000 - (400) H1FY20 H1FY21 -13.5% - (500) -8.4% (600) H1FY20 H1FY21 (525) (800) (1,000) (1,

  20. Slide 20: 12M FY20 – YoY Consolidated Financial Performance

    12M FY20 – YoY Consolidated Financial Performance INR in million Total Income EBIDTA PAT 23,000 22,754 3,100 3,049 1,350 1,313 22,500 3,000 1,300 2,900 13.4% 22,000 21,740 2,801 1,250 6.0% 2,800 1,216 21,500 1,200 2,700 12.9% 5.3% 21,000 2,600 1,150 12MFY19 12MFY20 12MFY19 12MFY20 12MFY19 12MFY20 12

  21. Slide 21: FY20 Financial Performance (consolidated)

    FY20 Financial Performance (consolidated) INR in million Contract Revenue Revenue mix with high-margin O&M services segment 13,778 13,344 15,439 22,566 21,604 2% 5% EBITDA Margins continue to remain healthy…. Profit After Tax inching higher 21

  22. Slide 22: FY20 Financial Performance (consolidated)

    FY20 Financial Performance (consolidated) INR in million Healthy net debt equity ratio provides significant headroom for growth High Asset Turnover … testament to higher efficiency 22

  23. Slide 23: Robust Order Book: Stronger Revenue visibility for next 3 years

    Robust Order Book: Stronger Revenue visibility for next 3 years INR in million 60,000 50,000 15% 47,830 45,748 49 % 42,677 40,000 85% 37,050 35,238 Contract Revenue 30,000 27,715 Order Inflow 22,566 21,604 21,064 17,950 19,523 20,000 Order Back Log 15,375 15,439 13,778 13,344 10,000 34% - 55% FY 16

  24. Slide 24: Robust Order Book: Stronger Revenue visibility for next 3 years (cont..)

    Robust Order Book: Stronger Revenue visibility for next 3 years (cont..) INR in million Order Inflow during 12 M FY 20 (up to 31st March 2020) Rs. 19,523 Mn Order backlog as on 31st March 2020 Rs. 45,748 Mn 30 % 36 % Erection 26 % 5,818 12,273 7,114 O&M 45 % Erection Electrical Works 20,541 O&M Civi

  25. Slide 25: Financial Snapshot | Consolidated Income Statement & Balance Sheet

    Financial Snapshot | Consolidated Income Statement & Balance Sheet INR in million Income Statement (Consolidated) Balance Sheet (Consolidated) Particulars FY16 FY17 FY18 FY19 FY20 H1 FY21 Particulars FY16 FY17 FY18 FY19 FY20 H1 FY21 Revenue from operations 13,782 13,382 15,478 22,613 21,647 6,204 As

  26. Slide 26: Our Projects

    POWER MECH Growth Unlimite: d Our Projects 26

  27. Slide 27: Industrial Construction: Domestic Projects (Erection, Testing & Commissioning)

    INDUSTRIAL CONSTRUCTION: DOMESTIC PROJECTS (ERECTION, TESTING & COMMISSIONING) 1X660 MW TPP, BTG, HARDUAGANJ, DOOSAN 3X660 MW ,BOILER, ESP,CP, STRUCTURE & STG, 2X500 MW STPP,BOILER, ESP STG, BOILER, ESP, TG AUXILIARIES, UMPP BOILER, ESP, STRUCTURE, TG NABINAGAR, BHEL VINDHYACHAL, BHEL (COMPLETED) 80

  28. Slide 28: Infrastructure Construction: Civil, Architectural & Railway Works

    INFRASTRUCTURE CONSTRUCTION : CIVIL, ARCHITECTURAL & RAILWAY WORKS 1X800 MW TPSS, CIVIL, STRUCTURAL AND 1X800 MW TPSS, CIVIL, STRUCTURAL AND GDV-MTM 37 ,DOUBLING & 1X500MW, FGUTTP, CIVIL, STRUCTURAL 2X800 MW, YTPS, CIVIL, STRUCTURAL ARCHITECTURAL WORK UNIT- ARCHITECTURAL WORK STAGE-3, NORTH ELECTRIF

  29. Slide 29: International Operations

    INTERNATIONAL OPERATIONS 250 MW SABIYA CCPP, KUWAIT 2X157 MW GT POWER PLANT, LIBYA 6X200 MW HEP, BHUTAN 1800 MW ALBA CCPP, BAHRAIN 360MW BHERAMARA INSTALLATION OF HRSG (COMPLETED) INSTALLATION OF HYDRO ETC OF GTG,STG,HRSG & BOP CCPP, BANGLADESH INSTALLATION TURBINE & GENERATOR OF GTG, STG & HRSG 151

  30. Slide 30: Operation and Maintenance

    OPERATION AND MAINTANENCE SIEMENS -138MW GAS TURBINE TG OVERHAUING 600MW JHARSUGUDA BEARING DIASSEMBLY AT NTPC-SIMHADRI CONTROL & STOP VALVES OVERHAULING PAGUTHAN VEDANTA SIPAT 660MW CAPITAL OVERHAULING OF TURBINE HP HEATER REPLACEMENT 800MW ,CGPL CUPLOCK SCAFFOLDING ERECTION MSH LINE MODIFICATION,

  31. Slide 31: Manufacturing Facility & Hydro Power Services

    MANUFACTURING FACILITY & HYDRO POWER SERVICES MANUFACTURING UNIT (NOIDA) CNC SECTION (NOIDA) SR FURNACE (NOIDA) CNC OXY FUEL CUTTING (NOIDA) HEAVY DUTY CENTRE LATHES( NOIDA) VTL(MANUAL+CNC (NOIDA) PLANO MILLER, CND (NOIDA) 3 ROLL PLATE BENDING MACHINE (NOIDA) HYDRO GENERATOR UNDER ASSEMBLY FOR FRANC

  32. Slide 32: Thank You

    Thank You For investor queries, please contact: Ph: +91-040-30444418 Email: cs@powermech.net 32