Slide 1: Corporate Presentation November 2026
CORPORATE PRESENTATION November 2026 TSX FM
Slide 2: Copper-Focused Producer
Toronto | CANADA London | UK COPPER-FOCUSED Operations PRODUCER Greenfield Projects GUELB MOGHREIN | Cu Au | MAURITANIA First Quantum Offices COBRE PANAMÁ | Cu Au | PANAMA (Preservation & Safe Management) 2025 Revenue LA GRANJA | Cu | PERU by Commodity1 KANSANSHI | Cu Au | ZAMBIA SENTINEL | Cu | ZAM
Slide 3: 2026 Priorities
2026 PRIORITIES Advance Continued Safe Cobre Panamá and Productive to Resolution Operational Performance Strengthening the Advance Balance Sheet for Greenfield Future Growth Projects 3
Slide 4: The Right Assets
KANSANSHI SENTINEL COBRE PANAMÁ Solwezi, Zambia Kalumbila, Zambia Colón Province, Panama THE RIGHT ASSETS FQM Zambia Top 10 global copper complex1 with vertically integrated production ♦ 80% ownership2 (20% ZCCM-IH) ♦ 100% ownership ♦ 91% ownership (9% KOMIR4) ♦ Open-pit (Cu, Au) ♦ Open-pit (Cu) ♦ O
Slide 5: Interministerial Commission Recommendation
The Interministerial Commission Recommends The GOP enter into negotiations with First Quantum to provide for a restart of Cobre Panamá to INTERMINISTERIAL support an orderly, self-financed closure, recognizing that closure and rehabilitation will be a long-term undertaking extending over decades. A
Slide 6: Track Record of Project Delivery
OPEN-PIT COPPER PROJECTS BUILT SINCE 2005 TRACK RECORD OF PROJECT DELIVERY Sentinel CP100 Kansanshi (55 Mtpa) Expansion Cobre Cobre Panamá, (12 Mtpa) (15 Mtpa) Panamá including port and Frontier (85 Mtpa) power plant In-house projects team completed (8 Mtpa) >$13B in projects, typically within Kevit
Slide 7: World-Class Undeveloped Projects
15 Largest Undeveloped Open-Pit Greenfield Projects1 Bubble size represents resource contained copper WORLD-CLASS Represents First Quantum project UNDEVELOPED PROJECTS ♦ Two of the largest undeveloped El Pachon projects globally1 sit within the First Quantum portfolio Twin Metals Tampakan ♦ Taca Tac
Slide 8: Taca Taca
♦ Porphyry copper-gold-moly deposit ♦ 3,500 metres elevation ~230 km west of city of Salta, 55 km east of Chilean border ♦ Defined access to water, power, rail, port TACA TACA ♦ Located in an area with limited Salta Province, Argentina environmental sensitivities ♦ No local communities living within
Slide 9: La Granja
♦ Located on the eastern flank of the Western Cordillera of the Andes; Situated at moderate elevations of between 2,000 metres and 2,800 metres above sea level ♦ Second largest greenfield project based on contained LA GRANJA copper1 ♦ Two principal mineralized centres at Paja Blanca and Cajamarca, P
Slide 10: Balance Sheet
DECISIVE ACTIONS TO STRENGTHEN BALANCE SHEET BALANCE SHEET 2019 2024-2026 First production at Cobre Panamá ♦ Refinancing of bank facilities, notes offerings, bought deal equity 2022 issuance Kansanshi S3 Expansion and Enterprise nickel project sanctioned ♦ Copper & gold hedge program TOP PRIORITIES
Slide 11: Why First Quantum?
WHY FIRST QUANTUM? WORLD-CLASS PROVEN GREENFIELD ASSETS SELF-BUILD TEAM OPTIONALITY Top global copper In-house team with a track Two of the largest producer with a focus on record of building and greenfield projects operational excellence delivering large and globally1 reside within the complex proj
Slide 12: Cautionary Statement on Forward-Looking Information
CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. The forward-looking information