Argonaut Gold Inc

Argonaut Gold — Corporate Update (December 2013)

23 slides from Argonaut Gold's corporate update, December 2013

  1. Slide 1: December 2013

    December 2013 ArgonautGold.com TSX:AR

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement FORWARD LOOKING INFORMATION (ALL MONETARY AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED) This document contains certain “forward-looking statements” and “forward-looking information” under applicable Canadian securities laws concerning the proposed transaction and the bus

  3. Slide 3: Argonaut Investments

    Argonaut Investments Core Values/Foundations  Leverage to Gold through >14 million gold ozs M&I resource base  De-risked with low CAPEX and LOM Operating Cost  ~$100/oz CAPEX  ~$600 Cash Cost  Favorable Jurisdictions  Potential Hidden Value Drivers  Fully Funded through Operational Cash Flow

  4. Slide 4: Growth to 300-500,000 ozs per year

    Growth to 300-500,000 ozs per year 500 +500k ozs. Magino Production Growth San Antonio 400 La Colorada El Castillo 300 220- 250k ozs. 200 150-180k ozs. 120-130k ozs. 108k ozs. 100 0 2012 2013 Expansion New Mine - San Antonio New Mine - Magino La Colorada and El Castillo Expansion Through 2013 and 20

  5. Slide 5: Q3 2013 Operational Highlights

    Q3 2013 Operational Highlights Operations: Financials:  El Castillo  Revenue  West Side Pad 8 construction is ongoing  $42.4 M  West Side crusher and overland  Net Income conveyor project completed  $6.6 M  Permits were received for  Income Per Basic Share the new south  $0.04 waste dump 

  6. Slide 6: 2013 Operations

    2013 Operations El Castillo La Colorada Guidance Guidance • ~100,000 ozs @ $700-$725/oz cash cost • 24,000 ozs @ $450-$475/oz cash cost • 9 months Actual 74K ozs @ $696/oz • 9 months actual 15K ozs @ $397/oz Initiatives - $36 million Initiatives - $28 million • New west side pad with 30 m tonne capa

  7. Slide 7: 2013 Development Projects

    2013 Development Projects San Antonio San Agustín Magino Constrained Pit Resource Pit 2013 Goals - $3 million 2013 Acquisition 2013 Goals - $12 million • Permitting • 10 km from El Castillo • New PD Zone • Design for 6 M TPY vs 4 M TPY • Significant exploration upside • Permitting • Resource • Richm

  8. Slide 8: San Agustin – Durango, Mexico

    SAN AGUSTIN – DURANGO, MEXICO 8 TSX:AR December December2,2013 2013 8 ArgonautGold.com ArgonautGold.com

  9. Slide 9: The Transaction

    The Transaction Deal Parameters Deal Rational  Cash and Shares:  Active strategy to acquire  US$30 million in shares based assets or land holdings near on 5 day VWAP prior to existing operations. announcement issued upon  Located 10km from El Castillo closing.  Same Geologic structure as El  U

  10. Slide 10: Historical Resources

    Historical Resources Ore Type Classification Tonnes (Million) Au (g/t) Ag (g/t) Oxide Indicated 21.1 0.40 16.0 Inferred 11.3 0.35 15.4 Sulphide Indicated 99.9 0.41 11.5 Inferred 79.9 0.36 12.2 Total Indicated 121.0 0.41 12.3 Inferred 91.2 0.36 12.6 The San Agustín project hosts an indicated resource

  11. Slide 11: Regional Geology - El Castillo/San Agustin

    Regional Geology -El Castillo/San Agustin

  12. Slide 12: Infill Drill Program

    Infill Drill Program Cs a SW e { f t { { ne | HRT yb FRAGE, 2 E-30898 T-219566 EA PARREA‘A Uk BARRERA

  13. Slide 13: Exploration Upside – Soil Sampling

    Exploration Upside – Soil Sampling GOLD IN SOILS MAP Concession Boundary 13

  14. Slide 14: Unlocking value at Magino - Richmont Transaction

    Unlocking value at Magino - Richmont Transaction Transaction •CA $2 mm payment to Richmont by Argonaut Details • Land swap – Acquired valuable additional surface rights Provides • Mining rights up to 400 m depths on key concessions to expand Magino Additional • Exploration potential Value Drivers 14

  15. Slide 15: Land Swap

    Land Swap Claim swap Argonaut receives Surface and mining rights on all noted claims (except SSM722481 in yellow) Argonaut provides 100% of SSM722481 in yellow Mining rights below 400 m on pink claims 15 TSX:AR December December2,2013 2013 15 ArgonautGold.com ArgonautGold.com

  16. Slide 16: Potential Pit Expansion with Additional Land

    Potential Pit Expansion with Additional Land Richmont Argonaut Constrained Pit Unconstrained Pit 16 TSX:AR December December2,2013 2013 16 ArgonautGold.com ArgonautGold.com

  17. Slide 17: Richmont Holes and Grades

    Richmont Holes and Grades From To Meters Grade(g/t) LC-09-01 188.55 197.00 8.45 5.54 256.42 264.50 8.08 0.50 LC-09-02 14.22 23.00 8.78 1.41 79.75 84.64 4.89 0.74 LC-09-03 49.40 52.20 2.80 1.18 151.50 155.00 3.50 0.58 PL – 18 146.33 150.42 4.09 0.73 160.00 165.45 5.45 0.55 PL – 19 29.20 32.00 2.80 0.

  18. Slide 18: Future Value Drivers

    Future Value Drivers El Castillo Gold Production Sulphide Mineralization 300-500,000 ozs / year Continuing geological and metallurgical work (Resource of 1.5 mm ozs contained in 30-50 meters of drilling underneath pit) La Colorada Exploration Upside Veta Madre drilling Magino Underground Exploration

  19. Slide 19: The Difference

    The Difference  Value Beyond Gold  Leverage to Gold  >14 million ozs M&I Resource  De-risked with low CAPEX and LOM Operating Cost  ~$100/oz CAPEX  ~$600 Cash Cost  Favorable Jurisdictions  Potential Hidden Value Drivers  Fully Funded thru Operational Cash Flow & $125 million Cash Balance 

  20. Slide 20: For Additional Information

    For Additional Information www.argonautgold.com Nichole Cowles Investor Relations Manager Argonaut Gold Inc. 9600 Prototype Ct. Reno, NV 89521 Ph.: 775-284-4422 ext. 101 Cell.: 775-240-4172 Fax: 775-284-4426 20 TSX:AR December December2,2013 2013 20 ArgonautGold.com ArgonautGold.com

  21. Slide 21: NI 43-101 Technical Report on Resources and Reserves, El Castillo Mine

    Resource Au Au Ag Ag Argonaut Gold is a Canadian gold company engaged in exploration, mine Category Tonnes Grade (g/t) Ounces Grade (g/t) Ounces development and production activities. Its primary assets are the Mineral Reserves Castillo - Oxide Proven 84,470,000 0.36 994,000 production stage El Cast

  22. Slide 22: San Agustin Resource

    San Agustin Resource Ore Type Classification Tonnes (Million) Au (g/t) Ag (g/t) Oxide Indicated 21.1 0.40 16.0 Inferred 11.3 0.35 15.4 Sulphide Indicated 99.9 0.41 11.5 Inferred 79.9 0.36 12.2 Total Indicated 121.0 0.41 12.3 Inferred 91.2 0.36 12.6 The San Agustín project hosts an indicated resource

  23. Slide 23: Argonaut Position

    Argonaut Position Board of Directors Analyst Research Chairman Prior Experience BMO Andrew Kaip Brian J. Kennedy President /CEO Meridian Gold Inc. Canaccord Genuity Rahul Paul Directors Peter C. Dougherty CFO Meridian Gold Inc. CIBC Jeff Killeen James E. Kofman Cormark Securities Cowen Securities Ad

Argonaut Gold — Corporate Update (December 2013) on 6ix