  1. Slide 1: Canadian Mine Ramp-ups Gaining Momentum into Q4 and 2026

    Canadian Mine Ramp-ups Gaining Momentum into Q4 and 2026 Q3 2025 RESULTS & CORPORATE UPDATE NOVEMBER 6, 2025 Date X, 2025

  2. Slide 2: Cautionary Notes

    Cautionary Notes Forward-looking Statements. This presentation contains certain forward-looking information and forward-looking Non-IFRS Measures. This presentation refers to all-in sustaining costs (AISC) per ounce sold, cash costs per ounce statements within the meaning of applicable securities le

  3. Slide 3: Equinox Gold: Building a Top Quartile Gold Company

    Equinox Gold: Building a Top Quartile Gold Company Components to Deliver Top Quartile Valuation Diversified Portfolio Weighted to Canada (Consensus Analyst NAV by Region)1  Quality high-margin gold assets,  Located in Tier 1 jurisdictions,  That deliver into expectations. Brazil Q3 was a Key Infl

  4. Slide 4: Equinox Gold: Q3 2025 Performance

    Equinox Gold: Q3 2025 Performance 2025 Production Guidance (100%) Q3 Financial Results 785,000 - 915,000 ozs2 (Including Calibre assets from Jan 1, 2025) • Produced 236,382 oz (including Castle Mountain and Valentine) (Excluding Los Filos, Castle Mountain and Valentine) • Sold 239,311 oz at a realiz

  5. Slide 5: Greenstone: Operational Improvements Yielding Positive Results

    Greenstone: Operational Improvements Yielding Positive Results Q3 Performance • Mining exceeded 185,000 tpd, 10% increase vs Q2 - Improved cycle times, equipment maintenance, shift transitions and implemented hot seating - Implemented additional grade control protocols and tracking systems • Process

  6. Slide 6: Valentine: Ramp-up Ahead of Schedule

    Valentine: Ramp-up Ahead of Schedule Commissioning Progress • First ore introduced on August 27 • First gold pour ahead of schedule on September 14 • Throughput averaged 4,992 tpd or 73% of nameplate (6,850 tpd) for the first 66 days of operations October Mill Performance • Throughput averaged 6,222

  7. Slide 7: Equinox Gold: Building a Top Quartile Gold Company

    Equinox Gold: Building a Top Quartile Gold Company On Track for Strong Q4 and Further Improvements in 2026 Greenstone, Canada Diversified Portfolio Weighted to Canada (Consensus Analyst NAV by Region)1 • Continued operational improvements Valentine, Canada Brazil • Continued ramp-up of production an

  8. Slide 8: Appendix

    Appendix

  9. Slide 9: Capital Structure

    Capital Structure Common Shares 1 784.8 M Avg. Daily Shares Traded 5 TSX: 4.6 M + NYSE-A: 13.2 M Options and warrants @ avg. C$5.91 1,2 12.6 M Cash (at Sept 30, 2025) 6 ~$348.5 M Restricted Share Units 3 4.9 M Debt (at Sept 30, 2025) 7 Drawn ~$1,469 M, Available ~$320 M Potential Shares from Convert

  10. Slide 10: 2025 Guidance

    2025 Guidance CANADA 2025 GUIDANCE1,3 Greenstone, Valentine Production Total Cash Costs2 All-in Sustaining Cost2 Growth Capital2 Exploration (ounces) ($/ounce) ($/ounce) ($ million) ($ million) Greenstone 220,000 – 260,000 $1,275 – $1,375 $1,700 – $1,800 $80 – $85 $2 – $3 BRAZIL Aurizona, RDM, Brazi

  11. Slide 11: Proven & Probable Mineral Reserves

    Proven & Probable Mineral Reserves1 Proven Probable Proven & Probable Mine/Project Tonnes Grade Contained Tonnes Grade Contained Tonnes Grade Contained (kt) (g/t) Gold (koz) (kt) (g/t) Gold (koz) (kt) (g/t) Gold (koz) Greenstone 6,817 1.16 255 137,846 1.23 5,445 144,662 1.23 5,700 Valentine 23,400 1

  12. Slide 12: Measured & Indicated Mineral Resources

    Measured & Indicated Mineral Resources1 Measured Indicated Measured & Indicated Mine/Project Tonnes Grade Contained Tonnes Grade Contained Tonnes Grade Contained (kt) (g/t) Gold (koz) (kt) (g/t) Gold (koz) (kt) (g/t) Gold (koz) Greenstone 29,967 2.30 2,218 29,967 2.30 2,218 Brookbank 3,428 5.45 600

  13. Slide 13: Inferred Mineral Resources

    Inferred Mineral Resources1 Inferred Inferred (cont.) Mine/Project Tonnes Grade Contained Mine/Project Tonnes Grade Contained (kt) (g/t) Gold (koz) (kt) (g/t) Gold (koz) Greenstone 26,371 3.26 2,763 Los Filos 135,935 0.74 3,237 Brookbank 751 3.30 80 El Limon 6,332 4.43 902 Kailey 4,858 0.87 136 La L

  14. Slide 14: Technical Disclosure

    Technical Disclosure National Instrument 43-101 Scientific and technical information concerning the Los Filos Mine Complex is summarized, derived, or Readers are reminded that results outlined in the technical reports for some of these projects are extracted from the “Updated Technical Report for th