Stanmore Resources Ltd · ASX:SMR
Stanmore Resources — Stanmore Coal — UBS Coal and Iron Ore Seminar 2011
22 slides from Stanmore Resources's conference presentation, Nov 15, 2011
Slide 1: UBS Coal and Iron Ore Seminar Presentation
For personal use only UBS Coal and Iron Ore Seminar Presentation November 2011
Slide 2: Important information
Important information This document has been prepared by Stanmore Coal Limited (“Stanmore Coal”) for the purpose of providing a company and technical overview to interested analysts/investors. None of Stanmore Coal, nor any of its related bodies corporate, their respective directors, partners, emplo
Slide 3: Stanmore Coal Overview
Stanmore Coal Overview Coal development and exploration company Key Metrics For personal use only Portfolio of coking, PCI and thermal coal targets in prime ASX Code SMR coal areas Shares on issue 127.2m 1 − 2 development projects (The Range and Mackenzie) Current share price A$0.975 Market Capi
Slide 4: Strong Board and Management Team
Strong Board and Management Team NEVILLE SNEDDON NICK JORSS STEPHEN BIZZELL VIV FORBES For personal use only Chairman Managing Director Director Director Mining engineer with 37 years 20 years in engineering, project Extensive experience in Over 40 years of Bowen Basin coal experience in coal, forme
Slide 5: Stanmore Coal Projects (all 100% owned)
Stanmore Coal Projects (all 100% owned) The Range For personal use only Open cut export quality thermal coal project located 27km SE of proposed Surat Basin rail line. 94Mt Reserves1 and 229Mt JORC Indicated + Inferred Resources. PFS recently completed. Target production of 5Mtpa commencing in 201
Slide 6: A clear path to key customers
A clear path to key customers Well located to all key markets including Japan, For personal use only China, Korea and India All projects are located adjacent to existing or planned rail and port facilities Rail Range: existing QR Moura line and tie-in to Surat Basin Rail (2015) Mackenzie: Ex
Slide 7: The Range Project – Surat Basin Asset Overview
The Range Project – Surat Basin Asset Overview 100% owned For personal use only Significant Reserve/Resource base − 94Mt JORC Marketable Coal Reserves1 − 229Mt JORC Resource (151Mt Indicated, 78Mt Inferred) High energy export quality thermal coal Open cut mining operation First coal by 2015
Slide 8: The Range Project Coal quality
The Range Project Coal quality High energy export thermal coal For personal use only A premium export thermal coal in the Surat Basin Surat Basin coals are typically clean burning with good burnout characteristics and low nitrogen Product is a high energy, low ash, low sulphur thermal coal S
Slide 9: The Range Project Pre-feasibility study results
The Range Project Pre-feasibility study results For personal use only Asset Description Key Highlights The Range, Surat Basin Confirmed the technical and economic feasibility of the project Project (Queensland) Increased the life of mine from 18 to 26 years JORC Resources / Coal Reserves(1) 229M
Slide 10: The Range Project Site layout
The Range Project Site layout For personal use only Proposed site layout Mine industrial area layout Coal product flow sheet 9
Slide 11: The Range Further upside potential
The Range Further upside potential For personal use only Recent drilling to the west of the pit has intercepted additional sub-cropping coal seams Interpreted to be seams in the Argyle interval of the lower Juandah Coal Measures Hole 83R: 11.8m cumulative coal to a depth of 188m including a se
Slide 12: Mackenzie Project Asset Overview
Mackenzie Project Asset Overview For personal use only Bowen Basin – 100% owned Open cut coking coal deposit − 23km of strike (Burngrove Formation) Growing Resource − Currently 99Mt JORC Inferred Resource − 70 – 80Mt Exploration Target1 − Further drilling programme underway to test resource exte
Slide 13: The Range and Mackenzie development timeline
The Range and Mackenzie WICET Stage 2 development in parallel with Stanmore first coal Port and Rail infrastructure expected to be available For personal use only Q2 2011 Q2 2011 Q1 2012 Q3 2012 Q2 2013 Q4 2014 H2 2015 Q3 2015 Initial Resource Submit EIS Complete ML/EA application Complete First coa
Slide 14: Exploration Projects: Tennyson Overview
Exploration Projects Tennyson Overview 100% owned For personal use only Prospective for underground coking and export thermal coal Located adjacent to Emerald Initial scout drilling program complete Exploration Target1 of 220 – 290Mt Further drilling programme planned for H2 2011 Targeti
Slide 15: Exploration Projects: Belview Overview
Exploration Projects Belview Overview 100% owned For personal use only 5 holes drilled to date Targeting initial JORC Inferred Resource in late 2011 Exploration Target1 of 385 – 555Mt2 covers only 26% of lease Additional drilling programme planned for FY2012 to extend Initial drilling conf
Slide 16: Exploration Projects: Kerlong Overview
Exploration Projects Kerlong Overview 100% owned For personal use only Targeting high quality, underground coking and PCI coal Drilling programme commenced Target seams mined nearby including: − Burton (Peabody) − South Walker Creek (BHP Mitsubishi) − Carborough Downs (Vale) − Coppabella (Maca
Slide 17: Exploration Projects: New Cambria Overview
Exploration Projects New Cambria Overview 100% owned For personal use only Potential for low-volatile, high energy, low to medium ash PCI coal Drill program planned for 1H 2012 Along structural trend from Yarrabee Mine (Felix Resources/Yancoal) Targeting up-thrust Rangal Coal Measures with o
Slide 18: Attractive dynamics for metallurgical and thermal coal markets
Attractive dynamics for metallurgical and thermal coal markets Coal Market Overview Growth in metallurgical coal market For personal use only Metallurgical coal demand driven by increasing steel production and Forecasts consumption in Asia, particularly China and India. China expected 350 Metallur
Slide 19: Key milestones
Key milestones Next 12 months For personal use only H2 2011 H1 2012 H2 2012 2015 Pre Feasibility Study Commence feasibility Continued drilling at Target first coal completed at The study at The Range The Range to production Range upgrade Reserves from both Projects Complete Mackenzie and R
Slide 20: Summary
Summary Attractive pipeline of Queensland coal projects at various stages of development For personal use only − Two development projects located in the Bowen and Surat Basin’s to produce coking and thermal coal − Five Bowen Basin exploration projects comprising predominantly coking coal − All pro
Slide 21: Supplementary Slides
For personal use only Supplementary Slides 20
Slide 22: Reserves, Resources and Exploration Targets
Reserves, Resources and Exploration Targets JORC Marketable JORC Recoverable JORC Indicated JORC Inferred Additional Exploration For personal use only Project Coal Reserve (1) (2) Coal Reserve (1) (2) Resource (1) Resource (1) Target (3) Low High Mackenzie Coking - - - 99 70 80 The Range Thermal 94.