Blue Energy Limited · ASX:BLU

Blue Energy — QUPEX (June 2010)

35 slides from Blue Energy's conference presentation, Jun 30, 2010

  1. Slide 1: QUPEX Presentation

    QUPEX Presentation 30 June 2010 Slide 1

  2. Slide 2: Disclaimer

    Disclaimer This presentation may contain forward looking statements that are subject to risk factors associated with the gas and energy industry. It is believed that the expectations reflected in the statements contained within are reasonable, but they may be affected by a range of variables which c

  3. Slide 3: Corporate Snapshot

    BLUE ENERGY Corporate Snapshot ASX listed Energy Company (ASX Code: BUL) Brisbane Head Office Staff: 14 Shares on Issue: 647.5m* Share Price: $0.15* Market Capitalisation: $97m* Cash: $32m** Shareholders: 6,400** Coal Seam Gas Acreage: 21,049km2 Significant Shareholders: ANZ Nominees 17.6% Stanwell

  4. Slide 4: People

    PEOPLE Board Mr. Peter Cockcroft (Chairman) :International Gas and LNG veteran. Mr. John Phillips (CEO & MD) :Technical and Management background in petroleum and CSG. Dr. Paul Massarotto (NED) :Technical specialist and research background. Mr. Garry Button (NED) :Finance and accounting expertise –

  5. Slide 5: Corporate History

    CORPORATE HISTORY Corporate History • Sept 2007: A$34.6 million capital raising. • Jul 2008: ANZ Bank appointed Receiver to Primebroker Securities and took control of 113 million BUL Shares under margin lending security. (Receiver had Blue Board representation until Nov 2009). • Aug 2008: Stanwell a

  6. Slide 6: Activity Schedule

    ACTIVITY SCHEDULE Permit Target Cost Activity 2009 2010 2011 3P/3C Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ATP854P 150PJ $0.8MM Coreholes (3) Completed Walloon target Pilot Certified Reserves GSA Development ATP818 / 200PJ $1.3MM Coreholes (3) Completed ATP896P Pilot Walloon target Certified Reserves GSA Deve

  7. Slide 7: Immediate Focus of Activity

    IMMEDIATE FOCUS OF ACTIVITY ATP814P (Bowen Basin) Monslatt Block • Conversion of 2C/3C 2P/3P reserves • 3 pilot production wells being drilled Central and Sapphire Blocks • CSG core holes being drilled for additional resources. • Adjacent to CSG production (Arrow Energy’s Annandale, South Walker Cre

  8. Slide 8: Resource Snapshot

    RESOURCE SNAPSHOT ATP814P Interval Contingent Resource Prospective Certifier Block PJ’s (GIP) Resource PJ’s (GIP) Category 2C 3C Monslatt P1 121 847 NSAI Other 2,565 NSAI coals Shales 3,630 NSAI Central Rangal 1,100 Internal only Sapphire Moranbah 725 Internal only Rangals 148 Internal only Totals 1

  9. Slide 9: Reserve Targets

    RESERVE TARGETS Reserve Targets • Majority of reserve targets will be met by ATP814P and ATP813P. • Monslatt Block will deliver on 2010 targets if pilots successful. • 3C GIP in Monslatt = 3,411PJ. • Additional potential in Central and Sapphire Blocks will add to meeting 2011 targets. • Galilee succ

  10. Slide 10: Commercialisation Activity

    COMMERCIALISATION ACTIVITY Small Scale LNG/CNG KOGAS and Blue Energy executed an MOU to investigate the feasibility of Small Scale LNG/CNG for the transportation sector. This represents both a new business opportunity and an opportunity to monetise Blue’s equity gas in a success case. Export LNG Blu

  11. Slide 11: ATP814P Asset Overview

    ATP814P Asset Overview Bowen Basin, Queensland • Area 1,839km2 • Permit Granted 1 March 2006 • Holding 100%, 12 years – CSG • Gas In Place 7.1 TCF (from NSAI) Plus 1.9 TCF (internal) • Coal Seams Rangal, Fort Cooper and Moranbah coal measures • Work Completed Sapphire-1 & 2 core hole, 48km seismic,

  12. Slide 12: Bowen Basin Stratigraphy

    Bowen Basin Stratigraphy Target seams • Rangal CM / Bandanna FM. - currently being assessed/produced by Arrow at the Annandale and South Walker • Fort Cooper CM – assessed as having large GIP in Arrow’s acreage • Moranbah CM – productive at Arrow’s Moranbah CSG Project Slide 12

  13. Slide 13: ATP814P Regional Setting

    ATP814P Regional Setting Geology • Moranbah CM, Rangal and Fort Cooper CM targets. • Faulted and intruded terrain. • Thick gassy coals – demonstrated production (Moranbah Gas Project). • Limited seismic and structural control. Slide 13

  14. Slide 14: Bowen Basin Monslatt Stratigraphy

    Bowen Basin Monslatt Stratigraphy Monslatt Stratigraphy • Target seams • MCM P1 • MCM Gu • MCM Gm • MCM Gl Slide 14

  15. Slide 15: ATP814P Geological Cross section

    ATP814P Geological Cross section • Numerous continuous coal seams evident • Structuring evident – potential permeability enhancement • Major P1 seam present – productive at MGP • Depth of coals is within 600m depth window throughout the block Moranbah P1 Seam – productive at Arrow’s Project Slide 15

  16. Slide 16: ATP814P Monslatt Gas Content

    ATP814P Monslatt Gas Content • Gas contents are very high – up to 23m3/tonne • Shales demonstrate high gas content • Rapid desorption characteristics Slide 16

  17. Slide 17: ATP814P Program, Targets and Timing

    ATP814P Program, Targets and Timing Work Program • 4 CSG wells (Monslatt 1/1A, 2 & 3 drilled). • 3 pilot production wells in Monslatt drilled. • Core wells in Sapphire Block. • 4 CSG wells in the Central Block (core + strat). Resource Estimates • NSAI estimated the following resources for the Monsla

  18. Slide 18: ATP814P Monslatt Project

    ATP814P Monslatt Project Monslatt Drilling Results Monslatt 1A • Three coreholes drilled. • P Seam - productive seam at Arrows MGP • Intersected at 500 metres • Thickness – 5-7 metres • Gas content – up to 23m3/tonne raw • Adsorption Isotherm indicates 100% gas saturated • Gas quality 93% - 95% Meth

  19. Slide 19: ATP813P Asset Overview

    ATP813P Asset Overview Galilee Basin, Queensland • Area : 4,139 km2 • Permit Granted: 1 March 2006 • Holding : 100%, 12 years CSG and conventional • Gas In Place: 15.3 Tcf • Coal Seams: Aramac Coal measures Betts Creek – Permian • Work Completed: Carolina 1, 65km seismic Kanaka 1, Stainburn Downs 1,

  20. Slide 20: ATP813P Regional Geology

    ATP813P Regional Geology Galilee Basin • Superimposed Jurassic-Cretaceous, Permo-Triassic and Carboniferous-Devonian sedimentary sections • Permian section is time equivalent of the Cooper Basin and Bowen Basin sequences – extensive and thick coal measures – CSG potential • Strong Jurassic aquifer d

  21. Slide 21: ATP813P Program, Targets and Timing

    ATP813P Program, Targets and Timing Work Program • 10 core holes • Kanaka1 and Stainburn Downs 1 drilled to date. • 3 pilot wells contingent on coring results. Resource Targets • 12 month target: 500PJ 3C • 3 year target: 3,000PJ 3C Timing • Drilling: Q4 2009 – Q2 2010 • Initial Reserves: Q4 2010 Sl

  22. Slide 22: ATP813P Core hole drilling

    ATP813P Core hole drilling Kanaka 1 Kanaka 1 GR Density Sonic Res • Drilled in October 2009 • Total Depth = 1,300 metres • Target – Permian Betts Creek/Aramac • Net Coal intersected = 25.5 metres • Gas Content 4-6 m3/tonne • Gas Composition up to 98% Methane Betts Creek Fm • Forward Plan • Reprocess

  23. Slide 23: ATP813/814P Gas Export Options

    ATP813/814P Gas Export Options Gas Export Options • Pipeline route study from ATP813P to the Queensland Coast has been completed. • Route options include Abbot point and Gladstone, with additional option to connect to a potential Moranbah hub. Slide 23

  24. Slide 24: Maryborough Basin Overview

    MARYBOROUGH BASIN Overview Maryborough Basin • Awaiting award of excluded lands in ATP613P, and application areas ATP733A and ATP674A. • Earning a 75% interest in the permits/applications. • Lead in Native Title negotiations. • Potential plays: • CSG, Shale gas; Tight conventional gas; Gas storage.

  25. Slide 25: Key Messages

    KEY MESSAGES Key Messages • Strong Cash Position – $32 million. • Fully funded exploration program. • Initial NSAI Resource Certification in ATP 814P Monslatt Block • ~ 7,100PJ’s GIP • Potential 1,970PJ’s GIP in Central and Sapphire Blocks. • On track to meet reserve target. • Strong Alliance partne

  26. Slide 26: General Observations

    blueenergy ln limited General Observations

  27. Slide 27: LNG Proponent Acreage

    LNG Proponent Acreage • Upstream consolidation through to 2009 driven by BG • Other international players entered the sector via corporate and farm in deals, so that all now have positions right through the value chain. • The major LNG proponents now hold the bulk of the Surat/Bowen acreage Slide 27

  28. Slide 28: Split of reserves

    Split of reserves 2P 3P AGL AGL Bow Bow CS Energy CS Energy ESG ESG 23471 42677 Metgasco Metgasco Mitsui Mitsui Molopo Molopo Toyota Tsusho Toyota Tsusho Westside Westside LNG LNG Eastern Australian 2P CSG Reserves =26,801 PJ’s Eastern Australian 3P CSG Reserves = 52,530 PJ’s LNG proponents have 87%

  29. Slide 29: LNG Project Reserve Coverage

    LNG Project Reserve Coverage PROJECT 1P (PJ) 2P (PJ) 3P (PJ) CR (PJ) • Current reported proved reserves do SHELL 623 5271 8258 not meet single train requirements – current mtpa 0.48 4.055 6.352 collectively there is enough for 1 x 3.5 initial cap 2x4mtpa mtpa train max cap 16 mtpa QCLNG 749 5200 131

  30. Slide 30: Implications

    Implications • Will the major LNG proponents require additional gas over and above their own 3P and Contingent Resources? • With the possible exception of Shell/Arrow –possibly not Assumes conversion of Contingent Resources and 3P is efficient The first plant to be commissioned will benefit from oth

  31. Slide 31: Domestic Gas Option?

    Domestic Gas Option? Gas Price forecast - Qld Domestic only ($/GJ) Qld Domestic Gas Supply – Medium Scenario MMA Draft report 24 May 2010 MMA Draft report 24 May 2010 Slide 31

  32. Slide 32: Or Small Scale LNG/CNG?

    Or SMALL SCALE LNG/CNG? • Australia exports its abundant low value energy – gas (in the form of LNG). • Australia imports most of its high cost transportation fuel – crude oil/diesel. • Gas is a relatively small part of the energy mix in Australia – particularly in the Heavy Duty Vehicle sector. • S

  33. Slide 33: Small scale LNG

    Small scale LNG • Small scale LNG for transportation requires a different mindset if the explorer/producer is serious and also requires a tailored business model to suit the resource, its location and the corresponding market. • Product supply, understanding the market and customers in that market,

  34. Slide 34: Conclusions

    Conclusions • The mitigant for (continued) low domestic gas price (with modest reserves) could be small scale/micro LNG and dedicated transportation customers. • Small scale LNG wont be easy and will require a paradigm shift in business models for explorers. • Small Scale LNG requires a commitment t

  35. Slide 35: Registered Office and Contact

    www.blueenergy.com.au info@blueenergy.com.au REGISTERED OFFICE Level 3 410 Queen Street Brisbane QLD 4000 Ph: +61 7 3270 8800 Fax: +61 7 3270 8899 Slide 35

Blue Energy — QUPEX (June 2010) on 6ix