Project Overview AD’ Resour Rinc Greater A Gold “@> pDMIRALTY RESOURCES
Slide 4: Key Personnel
Key Personnel Board of Directors Prof. J Ross Harper CBE – Chairman, Scottish Coal, legal background, London John Anderson – Director, banking, legal, management – residing in Melbourne Phillip Thomas – Managing Director, geology, investment, marketing – located Sydney/Melbourne Technical Dr Carlos
Slide 5: Resume
Resume Phillip Thomas B.Sc (Geol) M.Bus Mkting SIA AIG - Appointed non-executive director April 2003, CEO & Chairman Aug 2004, MD Feb 2005. - Joined the Admiralty board at request of major shareholders - Experience in geostatistics (drill hole analysis), mine engineering simulation, geophysics and p
Slide 6: Cia Minera Santa Barbara Iron Ore Project
Cia Minera Santa Barbara Iron Ore Project Equity share - 50% interest in the Cia Minera Santa Barbara iron ore mines on production (July 2006) Acquisition Cost was US$8.5m, A$1.5m shares, USD$10m working capital, priority repayment Resource - 10 mines, proven resource of 32.75 million tonnes o
Slide 7: Profitability – Santa Barbara
Profitability – Santa Barbara Revenue 1.5 million tonnes FY 2006/7 62.8 cents FOB DMTU – 62% Fe = $38.92 per tonne 150,000 tonnes per month = $5,838,000 per month Expenses Interest on ADY $10m loan - $650,000 - $0.50 per tonne Extraction – Belsaco – $6.50 tonne Santa Barbara – $4.00
Slide 8: Cia Minera Santa Barbara Iron Ore Project: The Resource
Cia Minera Santa Barbara Iron Ore Project The Resource Located in Northern Chile 7 kilometres south-west of Vallenar 55 kilometres from the commercial port of Huasco Bay, 210 km from Caldera JORC Proven reserve of 32.75m tonnes at 12.2% avg Fe grade 7.3 to 4.8 to 1 extraction ratio The 10
Slide 9: Japonesa Tenement – 32.75 Million tonnes
Japonesa Tenement – 32.75 Million tonnes 9
Slide 10: Cia Minera Santa Barbara Iron Ore Project
Cia Minera Santa Barbara Iron Ore Project 10
Slide 11: Geomagnetics – high anomolies
Geomagnetics – high anomolies 11
Slide 12: Cia Minera Santa Barbara Iron Ore Project
Cia Minera Santa Barbara Iron Ore Project 32 4.2 00 E 3 22 .6 00 E 3 22 .8 00 E 3 23 .6 00 E 3 23 .8 00 E 3 24 .0 00 E 32 2.200 E 32 2.400 E 32 3.000 E 32 3.200 E 32 3.400 E 3 22 .0 00 E 6.833.000 N 6.833.000 N N 6.832.800 N 6.832.800 N 6.832.600 N 6.832.600 N ÁRE A DE INTE RV ENC IÓN DE L PRO YE C
Slide 13: Japonesa – Besalco Estimate of Equipment Required
JAPONESA – BESALCO MAQUINARIAS S.A ESTIMATE OF EQUIPMENT REQUIRED MINE LA JAPONESA MATERIALS MOVEMENT SERVICE PLANT MINERAL TRANSPORTATION SERVICE TO CALDERA Equipment tendered: 13 TRUCKS WITH OF 33 TONS 13 TRUCKS WITH OF 30 TONS 2 TRUCK DRILL 2 WHEEL LOADERS VOLVO L-220 1 WATER TRUCK OF 28.000 LTS.
Slide 14: Conveyor design at Caldera Port
Conveyor design at Caldera Port 14
Slide 15: Flowsheet of the Plant at La Japonesa – Probable Scenario
FLOWSHEET OF THE PLANT AT LA JAPONESA - PROBABLE SCENARIO TOTAL CONCENTRATE MATERIAL BEING PROCESSED AT THE MINE 252 TONNES FROM 1,200 TONNES 1.600 tmph – 16% Fe RATIO OF 1:4.8 CLASSIFICATION -1” WASTE PLANT MATERIAL 400 tmph 1.200 tmph - 20% Fe 600 tmph + ¼” 600 tmph Poleas WASTE 352,4 tmph - ¼” 3
Slide 16: Rincon Salar - Argentina
Rincon Salar - Argentina Major, world-class, multi-element brine resource (Li, K,) located in the Salta Province of Argentina. The 37 tenements cover an area in excess of 250 square kilometres. Key resources are lithium chloride, potassium chloride, and potassium sulphate. Resource due dilig
Slide 17: Rincon Salar - Argentina: The Resource
Rincon Salar - Argentina The Resource The Rincon Project is located in north-western Argentina near the Chilean border. It is a hyper saline lake, brine enriched in lithium, magnesium, potash, and boron, with three rivers providing subterranean waters flowing into the salar through volcanic rock
Slide 18: Rincon Salar - Lithium Concentrations from drill hole data
Rincon Salar - Argentina Lithium Concentrations from drill hole data 18
Slide 19: Production Estimates
Production Estimates Lithium Chloride (Dec 2008) 12,000 tonnes per annum US$4,200 per tonne Annual Revenue US$50 million per annum (2006 US demand 100,000 tonnes +? Flux for Aluminium welding, batteries, clothing antistatic, dehumidifiers) Potassium Chloride (Jun 2007) 40,000 tonnes per
Slide 20: Profit Estimates
Profit Estimates Lithium Chloride Potassium Chloride Revenue $50 million at $4,200 per Revenue $7 million at $175 per tonne tonne Capital Cost $3m Capital Cost $25-$30m Operating Cost $85 (+ or - $25) Operating Cost $1,270 (+ or - $300) Operating Profit US$90 per tonne Operating Prof
Slide 21: Rincon Salar - The Lithium Extraction Process
Rincon Salar - Argentina The Lithium Extraction Process c. Salt removed d. Sodium sulphate removed d. Potash removed e. Potassium Sulphate removed f. Magnesium removed f. Lithium Chloride produced 21
Slide 22: Rincon Salar - Markets
Rincon Salar - Argentina Markets Lithium Chloride The major market for lithium compounds (Lithium Chloride) is the USA followed by China, Taiwan and Japan, then Europe. Uses include anti-static fabric treatments, welding fluxes for aluminium, lithium divinyl chloride batteries, lithium metalproduc
Slide 23: Bulman – Northern Territory
Bulman – Northern Territory Zinc and Lead oxide, sulphide deposit located in southern Arnhem land in Australia's Northern Territory. Applied for ELA23814 – 637 sq kilometres In the 1950’s CRA estimated there was 375,000 tonnes @ 15% Zn and 2% Pb of mainly oxide material. The Bulman Leases an
Slide 24: Pyke Hill – Nickel Cobalt JV – Cougar Metals NL
Pyke Hill – Nickel Cobalt JV – Cougar Metals NL The Pyke Hill Project is located approximately 40km southeast of the Murrin Murrin Nickel Operation, near Leonora, Western Australia. Prospective for a high-grade nickel-cobalt lateritic resource. Aircore drilling undertaken by Cougar in FY2004 r
Slide 25: Funding - 2005 - 2007
Funding - 2005 - 2007 Feb 2005 - A$10m raised by $20m placement of converting notes May 2005 – MTM Holdings/Leveraged Capital advise they may convert 87.5m options at 10c (A$8.75m) June 2005 – A$2.5m raised by converting 25 million options at 10c Aug 2005 – A$2.5m raised by converting 25 million opt
Slide 26: Projected Profit and Earnings
Projected Profit and Earnings 2006-2007 2007-2008 2008-2009 $US $US $US Net Profit After Tax 9.9M 24.5M 54.3M Earnings Per 1.8 cents 4.5 cents 9.9 cents Share $US EPS calculated on 547 million shares 26