Mining Americas Inc. · TSX:MAI

Mining Americas — Minera Alamos — Precious Metals Summit Beaver Creek Virtual Conferences 2020

26 slides from Mining Americas's conference presentation, September 2020

  1. Slide 1: Proven Mine Development Team

    Proven Mine Development Team Building The Next Intermediate Gold Producer Precious Metals Summit Beaver Creek Virtual Conferences September 2020 TSX-V: MAI / OTCQB: MAIFF

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains certain “forward-looking statements”. All statements, other than statements of historical fact, that address activities, events or developments that Minera Alamos believes, expects or anticipates will or may occur in the future are forward-lookin

  3. Slide 3: Investment Thesis

    Investment Thesis Why invest in us? Multi-leveraged! We are We are PROVEN BUILDERS NEARING PRODUCTION • 3 successful mines put into production in last 13 years • 100 % Owned Assets • Strong operational expertise in heap leach mining • 3 high-quality, open pit development-stage assets • Ability to ex

  4. Slide 4: Company snapshot

    Capital Structure Company snapshot Capital Structure Shareholder Distribution Osisko Gold Royalties Ticker TSXV:MAI / OTCQB:MAIFF 17.5% Share Price (as of September 11th, 2020) C$0.70 Donald Smith Value Fund Basic Shares Outstanding 435.4M 9.0% Options 23.8M Retail & other Warrants 2.7M 50.7% Aegis

  5. Slide 5: Equity Performance: Outperformance of Peer Group, Gold and GDXJ

    Equity Performance Outperformance of Peer Group, Gold and GDXJ MINERA ALAMOS PERFORMANCE VERSUS GOLD PRICE AND PEERS | SINCE JUNE 1, 2019 600% 500% • Minera Alamos has outperformed each of the GDXJ, gold price, and its peer 400% group since June 1, 2019 Relative Performance • Coupled with delivering

  6. Slide 6: Board of Directors

    The Team Board of Directors DARREN KONINGEN DOUG RAMSHAW BRUCE DURHAM RUBEN PADILLA KEVIN SMALL CEO, Director President, Director Non -Executive Non-Executive Non-Executive Director Director Director Metallurgist with +20 years of Mining Geologist with +25 Geologist with +40 years of Geologist with

  7. Slide 7: Management

    The Team Management DARREN KONINGEN DOUG RAMSHAW CHRIS CHADDER FEDERICO ALVAREZ CEO and Director President, Director Chief Financial Officer Chief Operating Officer +20 years of engineering and +25 years of experience in the +20 years of financial +30 years experience within metallurgical experience

  8. Slide 8: High Quality Assets

    High Quality Assets Santana – 100% owned La Fortuna – 100% owned Cerro de Oro – 100% owned* * Subject to a schedule of payments

  9. Slide 9: Mexican gold development project pipeline

    Property Summary Mexican gold development project pipeline SANTANA (Under Construction) • Fully funded C$10 million heap leach scheduled to be constructed by the end of 2020. • The heap leach pad area has been cleared and is undergoing contouring ahead of clay placement and the pad liner installatio

  10. Slide 10: Santana Project: Near-term production opportunity

    Santana Project Near-term production opportunity Low Capex (~C$10m) Heap Leach Project LOCATION / INFRASTRUCTURE Under Construction • Sonora State, Mexico; 100% owned; 8,500 ha • Accessible by paved highway • 50 km SW of Alamos Gold’s 3M oz Mulatos Gold Mine MINE PLAN/STAGE • Near-term production op

  11. Slide 11: Construction On Track

    Economics Construction On Track AN INDUSTRY LEADER IN CAPITAL INTENSITY / PRODUCTION OUNCE • $6 million equity financing with largest shareholder Osisko Gold Royalties increasing their stake in the Company from 12.5% to 18.7% (Completed) • One of four consecutive straight share (no warrant) financin

  12. Slide 12: Santana Project Construction Highlights

    Santana Project Construction Highlights TEST MINING COMPLETED • ~50,000 t mined • Recovered gold grade +0.67 g/t (~1,100 oz recovered) • Various crush sizes tested <1/2”-5/8” up to 3” resulting in consistent recoveries across test sizes • Excellent percolation eliminating the need for agglomeration

  13. Slide 13: Santana Project Construction Highlights

    Santana Project Construction Highlights WATER TEST WELLS COMPLETED • 5 locations were identified for further evaluation via reverse circulation (RC) drilling following a hydrological survey in Q4 2019. • 800m of exploratory drilling (all holes combined) • Water was discovered in all the target areas

  14. Slide 14: Multiple Targets - New Discoveries

    Santana Project Multiple Targets - New Discoveries POTENTIAL TO DEFINE A SIGNIFICANT GOLD MINERAL DISTRICT - >1-2 MOZ POTENTIAL Divisadero Zone (2018 & 2019 Drilling Discovery) • Gold-silver discovery ~200m N of Nicho Norte ₋ 95.7 m @ 0.85 g/t Au, 9.8 g/t Ag ₋ 96.4 m @ 0.42 g/t Au, 3.6 g/t Ag ₋ 133.

  15. Slide 15: Cerro de Oro: Near-term development opportunity

    Cerro de Oro Project Near-term development opportunity LOCATION / INFRASTRUCTURE • Zacatecas State, Mexico; 100% owned*; 6,500 ha • Accessible by paved highway • 25 km N of Newmont’s 8M oz Au/471 Moz Ag Peñasquito Mine MINE PLAN/STAGE • Near-term development opportunity; extensive metallurgical stud

  16. Slide 16: Cerro de Oro Transaction Highlights

    Building out the Foundation Cerro de Oro Transaction Highlights Accretive Development Stage Acquisition of New Pipeline Asset ✓ • < 1% dilution to existing shareholders • The majority of cash payments due over multiple years post Santana entering production Adds An Advanced Gold Project in a Mining

  17. Slide 17: Historic Exploration

    Cerro de Oro Project Historic Exploration “The Cerro de Oro gold project has many characteristics that mimic the El Castillo gold mine our team developed under the Castle Gold Corporation banner from 2007 until its eventual sale in 2010.” – Darren Koningen, CEO “Cerro de Oro contains a large dissemi

  18. Slide 18: Historic Exploration – Discovery Drilling

    Cerro de Oro Project Historic Exploration – Discovery Drilling Hole From (m) To (m) Interval (m) Au Grade Zone Number (g/t) C094-19 0 92 92 0.45 North – oxide C094-17 0 71 71 0.31 North – oxide C094-20 0 77 77 0.29 North – oxide C093-04 0 80 80 0.31 North – oxide C094-26 0 40 40 0.27 South – oxide C

  19. Slide 19: Historic Exploration Highlights – 2017/2018 PrivateCo

    Cerro de Oro Project Historic Exploration Highlights – 2017/2018 PrivateCo Hole From (m) To (m) Interval (m) Au Grade Zone Number (g/t) CR-17-01 0 54 54 0.70 North – oxide CR-17-04 10 122 122 0.42 North – oxide CR-17-05 12 132 120 0.28 North – oxide including 92 132 40 0.51 North – oxide CR-17-10 2

  20. Slide 20: Historic Exploration - Trenching

    Cerro de Oro Project Historic Exploration - Trenching Trench Length (m) Au Grade (g/t) 75m 0.67 g/t 175m 0.39 g/t 130m 0.27 g/t 125m 0.18 g/t 100m 0.47 g/t 200m 0.50 g/t 131m 0.61 g/t 30m 0.52 g/t 20m 0.61 g/t 30m 0.59 g/t • Noranda also completed a comprehensive program of trenches that outlined la

  21. Slide 21: La Fortuna: PEA – High Grade Open Pit

    La Fortuna Project PEA – High Grade Open Pit LOCATION / INFRASTRUCTURE • Durango State, Mexico; 100% owned • ~6,200 ha • Easily accessible via a 100 km road from Culiacan, the Capital of Sinaloa State • State authorities are extending a 2-lane upgraded paved highway to the project including grid pow

  22. Slide 22: PEA – Economic summary

    La Fortuna Project PEA – Economic summary Pre-Tax NPV (7.5%) US$103.8M Pre-Tax IRR After-Tax NPV (7.5%) 122% US$69.8M 93% After-Tax IRR 93% STRONG IRR After-Tax US$1,250/oz Pre-Tax Payback Period 9 months After-Tax Payback Period 11 months Ave. Annual Production 43k oz Au, 220K oz Ag 1,000 t Cu (50k

  23. Slide 23: Value Proposition

    Value Proposition

  24. Slide 24: Path to intermediate production

    Growth Model Path to intermediate production ACQUIRE 4TH ASSET Targeting > LA FORTUNA • Targeting +/- 700K 200,000 oz/y • Low Capex Build quality ounces 1st SANTANA EXPANSION supported by royalty • Low Capex • Exploration driven and internal financial • Large land package expansion derived resources

  25. Slide 25: Executing in 2020 – The Transition to Gold Producer

    Real business in action Executing in 2020 – The Transition to Gold Producer Santana Mine Construction Ongoing Q1 – Q4 Santana- Start of Mining Operations Q4 or Q1 ‘21 Santana- Phase 3 Exploration Ongoing Q2 – Q4 La Fortuna - Permit Issuance Q3 – Q4 Cerro de Oro – Q4 Initiate Permitting Activities On

  26. Slide 26: Thank you

    Thank you For more information contact us: Info@mineraalamos.com Or visit us at : Mineraalamos.com TSX-V: MAI / OTCQB: MAIFF

Minera Alamos — Precious Metals Summit Beaver Creek Virtual Conferences 2020 on 6ix