Carnegie Clean Energy Ltd · ASX:CCE
Carnegie Clean Energy — Shareholder Meeting (November 2026)
17 slides from Carnegie Clean Energy's shareholder meeting presentation, Nov 24, 2026

Slide 1: Annual General Meeting – Presentation
rsonal use only Annual General Meeting – Presentation 24 November 2026 ASX CCE FRA CNM1 OTCQB CWGYF

Slide 2: Six CETO objectives
ACHIEVE PROGRAMME Six CETO objectives rsonal use only Demonstrating commercial, technical and operational objectives for commercial-scale CETO 01 Commercial objectives Modular, scalable and accepted due to fully submerged design 02 Energy capture Capacity factors and spatial density 03 Control syste

Slide 3: EuropeWave contracted deployment
ACHIEVE PROGRAMME EU R OPEWA V E CON T R A CT ED D EPLOY M EN T CETO Basque Country Phase 1 Phase 2 Phase 3 (final) Deployment Concept & tank test Preliminary design Build & deploy rsonal use only ✓ Complete ✓ Complete 80% complete #1 Judged on independently validated criteria LCOE Performance Ranke

Slide 4: Design and Testing
ACHIEVE PROGRAMME Design and Testing rsonal use only Developing and validating architecture and component selection • Architecture developed and proven through tank testing • Component suppliers, fabricators and service providers identified and engaged • Components evaluated and tested 15

Slide 5: Electrical and Generator Modules
ACHIEVE PROGRAMME Electrical and Generator Modules rsonal use only Generate electricity, store energy, control force, condition power • Modules developed in-house by mechanical and electrical design team • Containers fabricated by local Basque fabricator • Suppliers SEI and SKF supported detailed de

Slide 6: Buoyant Actuator
ACHIEVE PROGRAMME Buoyant Actuator rsonal use only Hydrodynamic prime mover, buoyant platform for modules • BA sets the hydrodynamic profile and provides system buoyancy • Designed by Carnegie Bilbao team • Fabricated in the Basque Country • Segmented design for logistical benefits 19

Slide 7: Stage deployment
ACHIEVE PROGRAMME Stage 1 deployment rsonal use only Paving the way for full system deployment • BA assembled and deployed at BiMEP • Requirement for milestone payment • Validation of towing, floatation behaviours • Significant learnings in identifying and working with key stakeholders and suppliers

Slide 8: PTO testing
ACHIEVE PROGRAMME PTO testing rsonal use only Rigorous testing onshore to avoid surprises at sea • Modules arranged back-to-back with one driving the other • Simulates real motion using model data sets • Conducted in Bilbao 23

Slide 9: Full system deployment
STAGE 2 DEPLOYMENT Full system deployment rsonal use only European Spring 2027 D EPLOY M EN T S EQU EN CE Moorings – primary and secondary systems 1 deployed first 2 Dynamic cable – connection to export cable 3 Full system with grid connection OPER A T I ON V A LI D A T ES Post-winter timing Quick c

Slide 10: CETO technology features and specifications
CETO TECHNOLOGY FEATURES Features and Visual Impact Extreme Wave Survival None – fully submerged (2 – 3 m) Deep diving to 20 m, power production continues specifications rsonal use only AI Control Real time control to optimise energy generation Installation & Recovery Small tow vessels, diverless an

Slide 11: Global footprint
rsonal use only GLOBAL FOOTPRINT Carnegie’s team and business footprint

Slide 12: Carnegie business model revenue generation
CARNEGIE BUSINESS MODEL REVENUE GENERATION How Carnegie 1 Sale of integrated CETO units generates revenue rsonal use only An ocean energy technology developer 2 Sale of wave prediction and control system and engineering services company software 3 Engineering services • Ocean energy project design,

Slide 13: Market opportunity
MARKET OPPORTUNITY Global potential of the wave energy market rsonal use only 40 GW $60bn p.a. 70% 350 GW Ocean energy is coming. The Ocean Energy Europe The amount of the world’s The International Renewable European Commission has set forecast ocean energy to be a surface covered by our Energy Agen

Slide 14: Outlook: Projects & funding
OUTLOOK Projects & funding rsonal use only • ACHIEVE Programme deployment and grid connection in the next 6 months • Work commenced on 6 MW (6 × 1 MW CETO array) project at BiMEP, off the coast of the Basque Country, Spain • Other sites under consideration in the EU, UK, US and Australia NEAR-TERM F

Slide 15: Question & Answer
rsonal use only Question & Answer Be part of the innovation that will unlock the power of the world’s oceans 30

Slide 16: Contact
CONTACT Thank you rsonal use only CEO Jonathan Fievez Chairman Anthony Shields Carnegie Clean Energy Ltd Carnegie Technologies Spain Head Office · 21 North Mole Drive, Bilbao, Bizkaia North Fremantle, Western Australia 6159 · +61 8 6168 8400 CETO Wave Energy UK CETO Wave Energy Ireland Edinburgh, Sc

Slide 17: Thank you!
Thank you! rsonal use only ¡Gracias! Eskerrik asko! 32
Source: ASX announcement, Nov 24, 2026
More decks from Carnegie Clean Energy Ltd
Technical Presentation (November 2026)12 slides · Nov 9, 2026
Technical Presentation (November 2026)12 slides · Nov 9, 2026
Shareholder Meeting (November 2025)22 slides · Nov 18, 2025
Investor Presentation (August 2025)18 slides · Aug 26, 2025
Non-Deal Roadshow (July 2025)11 slides · Jul 22, 2025
Non-Deal Roadshow (May 2025)9 slides · May 22, 2025