Norsemont Mining Inc. · CSE:NOM
Norsemont Mining — Investor Presentation (August 2026)
18 slides from Norsemont Mining's investor presentation, Aug 15, 2026
Slide 1: Targeting a World-Class Deposit While Moving Towards Production
CSE: NOM OTCQX: NRRSF FRA: LXZ1 Targeting a World-Class Deposit While Moving Towards Production Choquelimpie Gold -Silver-Co p per Pro ject August 15th, 2026 Corporate Presentation
Slide 2: Disclaimer & Forward-Looking Statements
Disclaimer & Forward-Looking Statements This presentation includes certain forward-looking statements and forward-looking information (together, Recursos Minerales del Proyecto Nilo, Dated January 30, 2017 by Antonio Cortes, Cristian Quinones, Carlos “forward-looking statements”). All statements oth
Slide 3: Value Proposition
Value Proposition Choquelimpie Gold-Silver-Copper Project, Northern Chile NI 43-101 resource: 2,184,000 oz AuEq Brownfields project — 145,000 metres drilled (Indicated) + 557,000 oz AuEq (Inferred) across 1,720+ holes including prior operators Past-producing gold-silver mine with Phase 3 drill progr
Slide 4: Choquelimpie Gold-Silver-Copper Project
Choquelimpie Gold-Silver-Copper Project Past-Producing Gold-Silver Mine / Northern Chile Location & Context Project Snapshot ▪ Located in Arica-Parinacota Province, northern Chile ▪ Past-producing gold-silver open-pit mine ▪ 115 km ENE of the port of Arica ▪ Operated through the 1990s; significant i
Slide 5: Asset Foundation
Asset Foundation Indefinite Presidential Decrees | Operational Infrastructure in Place Infrastructure ▪ 3,000 tonne/day processing mill on site ▪ Year-round road access, power and water on-site ▪ Valid water permits in place ▪ Fully equipped camp, offices and warehouse — refurbished and operational
Slide 6: Existing 43-101 Resource
Existing 43-101 Resource Choquelimpie Gold-Silver-Copper Project, Northern Chile Classification K tonnes Au g/t K Oz Au Ag g/t K Oz Ag Cu % K Cu Lbs. Au Eq g/t K Au Eq Oz Oxide Mineral Estimate Including Dumps Indicated 23,755 0.57 434 13.25 10,118 0 0 0.72 547 Inferred 695 0.31 7 5.73 128 0 0 0.38
Slide 7: The Case For Expansion
The Case For Expansion Historical & Norsemont Drilling Demonstrates System Scale and Upside Selected Historical Norsemont 2021 Results Intercepts By Zone MV21-002: 93m @ 1.38 g/t Au incl. Vizcacha: 12m @ 6.29 g/t Au, incl. 6m @ 10.22 A-327: 35m @ 32.2 g/t Au, 8 g/t Ag g/t Au Choque: MV21-004: 31m @
Slide 8: Phase 3 Drill Program
Phase 3 Drill Program Sulfide Resource Expansion The 2026 Phase 3 drill program is designed to test down-dip extensions of higher-grade sulfide mineralization and confirm depth continuity beneath the existing resource. Program Status ▪ 16 holes completed for 3,837m total ▪ Higher-grade targets teste
Slide 9: Initial Phase 3 Results
Initial Phase 3 Results Partial Results – Assays Ongoing MV25-DD01: 109m @ 1.09 g/t Au, 2.2 g/t Ag incl. 30m @ 1.48 g/t Au, 2.2 g/t Ag incl. 45m @ 1.21 g/t Au, 2.7 g/t Ag MV25-DD02: 94m @ 1.26 g/t Au, 2.7 g/t Ag incl. 29m @ 1.87 g/t Au, 1.3 g/t Ag incl. 29m @ 0.94 g/t Au, 28.8 g/t Ag incl. 25m @ 1.1
Slide 10: System Scale
System Scale 8km Corridor | Multiple Untested Targets 8km strike length Multiple zones of IP anomalies largely Porphyry Cu-Au identified surface mineralization undrilled at depth targets beneath existing resource IP chargeability anomaly extends approximately 750 metres between the Choque and Vizcac
Slide 11: Corporate Strategy
Corporate Strategy Near-Term Oxide / Longer-Term Sulfide Exploration Sulfide / Resource Expansion Oxide Resource 2026 ▪ Report results from 2025 drilling 2026 ---- Q2 ---- Q2 ▪ Commenced deeper infill drilling ▪ Leachability studies underway — cyanide solubility and column tests on stockpile materia
Slide 12: Near-Term Production Foundation
Near-Term Production Foundation Established Recoveries | Drilled Stockpiles | Testing Underway Metallurgy Stockpiles Historic Performance Historic Performance ▪ Successful oxide gold-silver production via heap leach through ▪ 66 sonic drill holes completed the 1990s across stockpile areas in 2021; 1
Slide 13: Regional Strategy
Regional Strategy Arica-Parinacota Why Chile / Arica-Parinacota Chile Arica-Parinacota Regional Advantages World's #1 copper producer; top-tier global mining jurisdiction 30% investment tax credit on physical assets (construction, machinery, equipment) Mining accounts for approximately 12% of GDP 40
Slide 14: Community & Social License
Community & Social License Gaining Social License in Arica-Parinacota Stakeholder Engagement ▪ Active engagement with local Aymara communities ▪ Working relationships with Governors' offices of Arica and Parinacota ▪ Engagement with Municipalities of Arica, Putre and Camarones ▪ Coordination with SE
Slide 15: Management & Directors
Management & Directors Capital markets leadership, mine-building experience, and public-company governance across exploration, development, and strategic exits. Marc Levy Charles Ross Mijael Thiele Dr. Sergei Diakov Ariel Tepperman Chairman & CEO Lead Director, CFO Director Director Director Founder
Slide 16: Technical Advisors
Technical Advisors Deep technical bench with global discovery, mine-development, geology, and M&A experience across major gold and copper systems. David Flint Dr. Adrian King, B. Sc, Ph. D Chief Geologist Technical Advisor Over 35 years of experience in the mining industry. He served as VP Explorati
Slide 17: Share Structure
Share Structure Strong balance sheet and aligned ownership from management, insiders and strategic shareholders. Capital Structure As of June 25, 2026 26% ■ Institutions & Family Offices Issued & Outstanding 89.1 Million 32% ■ CEO & Family Trust Warrants 34.4 Million ■ Insiders Options / RSUs 6.7 Mi
Slide 18: Contact Us
CSE: NOM OTCQX: NRRSF FRA: LXZ1 Contact Us Norsemont Mining Inc. 500 – 666 Burrard Street Vancouver, BC, V6C 3P6 Investor Relations Paul Searle Tel: 778-240-7724 Email: info@norsemont.com Connect With Us Norsemont Norsemont NorsemontMining Norsemont-Mining
Norsemont Mining — Investor Presentation (August 2026) on 6ix