  1. Slide 1: Sustainable Solutions in Energy and Environment

    Sustainable Solutions in Energy and Environment Disclaimer: Information in this presentation does not form of any offer and can be changed without prior notice. Thermax does not assume any obligation or liability arising from the use of this data in any form apart from its intended use of disseminat

  2. Slide 2: Thermax Group

    Thermax Group Corporate Office : Thermax House. 14-Mumbai Pune Road, Wakdewadi, Pune 411003, Maharashtra, India Registered Office : D-13, MIDC, Industrial Area, R.D. Aga Road, Chinchwad, Pune 411019, Maharashtra, India

  3. Slide 3: Thermax Group

    Thermax Group Our Belief : “Profit is not only a set of figures, but of values” Late Rohinton D. Aga 1935 – 1996 Founder, Thermax

  4. Slide 4: Our Business Profile

    Our Business Profile Boiler & Heater Boiler & Heater * Packaged boilers * |atge capacity power boilers * Thermal oil } water heaters @ Duergy recovery systems cooling & Heating Cooling ¢ Exhaust & multi- energy fired chillers * Steam fired chillers + Hot water fired chillers © Direct firod chillers

  5. Slide 5: Technology Partnerships

    Technology Partnerships Babcock & Wilcox, USA Balcke Dürr, Germany Taiheiyo, Japan Graver Water System LLC , USA • More than 180 years of • Brand under SPX • TEC Group Company •World’s leading water Combustion Experience Corporation treatment company • SPX Established in 1912 • Over 50 years of • Mo

  6. Slide 6: Certifications & Associations

    Certifications & Associations- Conforms to International Codes : Associated with Consultants ASME, BS, DIN, API, GOST, CE, JIS ISO 9001:2008, ISO 14001:2004 • Black & Veatch • BECHTEL • Toyo Engineering India Limited • Mott Macdonald • Development Consultants Private Limited • DAELIM • Fichtner • Sa

  7. Slide 7: Our Global Presence

    Our Global Presence Index Manufacturing Unit

  8. Slide 8: Thermax Group

    Thermax Group Subsidiaries Joint Ventures • Thermax Instrumentation Ltd., (India) • Thermax Babcock & Wilcox, India • Thermax Onsite Energy Solutions Ltd., (India) • Thermax SPX Energy Technologies • Thermax Sustainable Energy Solutions Ltd., (India) Ltd. , India • Thermax Engineering Construction C

  9. Slide 9: Thermax – International Presence

    Thermax – International Presence Global Footprints Global Footprints  Presence in 13 + countries  South East Asia  Close to 25 Business Associates across the Globe  Middle East • Global Presence with a customer base of over  North America 25,000  Europe  Africa Our international installations

  10. Slide 10: Our offerings

    Our offerings 1.Turnkey/ EPC (Engineer–Procure–Construct) solutions Procurement Engineering Turnkey EPC of Power Construction Projects Commissioning Waste Heat Biomass Open cycle to close Fossil Fuel fired Solar recovered from cycle • Solid Fuel •Sponge Iron kiln •Using grate ‐ • Through heat • Phot

  11. Slide 11: Our offerings

    Our offerings 2. FEED (Front End Engineering & Design) for power plants in • Cogeneration Plants • IPPs • Captive Power Plants 3. Operation & Maintenance (O&M) for Power Plants • IPP • Cement • Steel • Chemical • Ferrous / Non Ferrous • Paper • Sugar 4. Power projects on BOOT (Build–Own–Operate–Tran

  12. Slide 12: Preferred EPC Player

    Preferred EPC Player 1 Leader in captive EPC power generation market in India In‐house Manufacturing of key Project Equipment's 2 viz. Boiler, ESP, ACC & Water Solutions Experienced Professionals from Power majors 3 like Development Consultants, Black & Veatch Contracted more than 85 power 4 project

  13. Slide 13: Engineering

    Engineering ESTABISHED ENGINEERING STRENGTH In‐house expertise of Basic & Detailed Engineering Demonstrated experience In Sub Critical, Reheat, For Coal and Gas Plants • Team – 171 Engineers • Power and Energy With O&M Feedback Experts for Separate we Design Systems user Friendly Plants • 3D Smart P

  14. Slide 14: Our IT Enablers

    Our IT Enablers  State of the art software such as Smart Plant 3D Modeling, GT Pro, Steam Pro etc to simulate data.  Software such as CEASAR II & STAAD are used for piping stress & structural analysis  Software such as ETAP for Electrical Load Flow Studies  Advanced project management tools such

  15. Slide 15: Project Management

    Project Management PROVEN RECORD OF SUCESSFUL COMPLETION Ability to handle over 16 Projects simultaneously Use of Project Over 40 IPMA Management Tools Certified viz. Primavera Professionals Demonstrated experience of Working With Onshore Contractors Over 100,000 Man‐hours of Project Management Expe

  16. Slide 16: Procurement

    Procurement • 75,000 + sourcing man‐hours per annum • Dedicated Team for Vendor Quality & Assessment • Global Sourcing Capability Gas / Steam Turbine & Generators GE, Siemens, Skoda, Fuji, Toshiba, Hitachi, Shin Nippon Booster Gas Compressors Atlas Copco, Mann‐Turbo, Camaroon. Hitachi Electrical Sys

  17. Slide 17: Construction & Supervision

    Construction & Supervision Piling Rigs in Action Sea Water Intake Mechanical Erection Well Point Dewatering

  18. Slide 18: Health Safety & Environment

    Health Safety & Environment Certified for OHSAS:18001 (Occupational Health Safety Assessment Series) and ISO:14001 (Environment Management System) International Standard for continuous improvement in Health, Safety and Environment

  19. Slide 19: Organization Structure of Power Division

    Organization Structure of Power Division POWER DIVISION Small Power • Commissioned over 10 Projects Plants • Over 10 Projects under Execution Medium Power • Commissioned over 34 Projects Plants • Over 8 Projects under Execution Large Power • 2 Project Commissioned Plants • 2 Projects under Execution

  20. Slide 20: Gas Based Projects

    Gas Based Projects • Consultant : Black & Veatch Arvind Mills, Gujarat • Gas Turbine: GE (PGT‐10) [2x27.5 MW] • 2 No. of Thermax HRSG & 1x6.5 Mw steam turbine; 2‐2‐1 combination per unit • Tri‐generation plant with full fledged inlet air cooling system (IAC) & ZLD • Plant executed on EPC basis and o

  21. Slide 21: Industrial Waste Heat/ Gas Based Projects

    Industrial Waste Heat/ Gas Based Projects • Consultant : MECON Steel Authority of India Ltd. [42.5 MW] • Part of crude steel expansion project at SAIL • 3 x 100 TPH BF gas fired boilers, 2 x 18 MW STG, 1 x 6.5 MW BPTG and associated balance of plant • Thermax awarded certificate for three million ac

  22. Slide 22: Other Breakthrough Projects

    Other Breakthrough Projects 15 MW JK Nimbahera • Tata Sponge Iron Limited – One of the first plants in India to earn benefits from carbon credits • Kalpataru Power Transmission Limited – First biomass project in the world and the first project from India to be registered for CDM benefits • JK Cement

  23. Slide 23: International Projects

    International Projects Lamson Inc. Philippines 1x 3.5 MW Bataan 2020 Cogen Plant Philippines for Corn 1x 12.5 MW National Starch Industry Cogen Plant Cement Co. for paper Yemen Industry 1x 28 MW Yemen Co. [2 Boilers+ Sugar Refining 1 Turbine] Yemen* for Cement Dangote 1x 13.5 MW Industries Industry

  24. Slide 24: Awards & Key Achievements

    Awards & Key Achievements Asian Power Awards 2012 Thermax Limited awarded gold prize for 1 x 12.5 MW Bataan 2020 Philippines, in the best biomass cogeneration plant of the year category by Asian Power Awards in Oct 2012 Multiple bonus recipient – •Rs. 6 Crores from DCW for Power plant performance •R

  25. Slide 25: Manufacturing & Assembly Facilities

    Manufacturing & Assembly Facilities Pune, India Paudh, India Omnical, Germany Shirwad, India • World Class facilities for Hot rolling (Max 200 mm thk), Cold Rolling (Max 130 mm thk) & Coil Strip welding Savli, India Danstoker, Denmark Solapur, India • Dedicated manufacturing plants for Air Cooled Co

  26. Slide 26: Advantage Thermax

    Advantage Thermax  IPMA (QPMP) Certified Project Managers to ensure timely completion of Projects  Capability to handle more than 18 projects concurrently  Projects designed to  Guaranteed Power meet international Plant Availability & Portfolio of More than Project standards like ISO, ASME, Perf

  27. Slide 27: Thermax advantage

    Thermax advantage Over 85 Projects on EPC Recipient of many bullet bonuses Wrap Around Guarantees Ability To attract Fixed Cost and mobilize & Schedule resources 35% Equipments manufactured Alliance with In house reputed vendors

  28. Slide 28: Thank you

    Disclaimer : This presentation is for information purpose only and Thermax reserves the right to alter or change specifications without prior notice. All photos in this presentation are representative in purpose and to be used for reference only. Thank you www.thermaxindia.com