Yancoal Australia Ltd. · ASX:YAL
Yancoal Australia — Corporate Update (February 2021)
12 slides from Yancoal Australia's corporate update, Feb 25, 2021
Slide 1: Community Consultative Committee
Community Consultative Committee 25th February 2021
Slide 2: Action List
Action List ITEM RESPONSIBILITY PROGRESS UPDATE Inspection of Bowmans PB To be advised Creek diversion if flowing. 2 23 February 2021 2
Slide 3: Ashton Mine Statistics CY 2021
Ashton Mine Statistics CY 2021 Ashton Coal Key Statistics 2021 Budget (ytd) 2021 Actual (ytd) ROM (Mt) 0.3 0.295 Product Coal (Mt) 0.18 0.14 Total Coal Sales (Mt) 0.16 0.13 Total Recordable Injuries (TRI) 12 0*since Sept 2020 Total Employees (FTE) 272 245 Complaints 0 0 Environmental Incidents 0 0 3
Slide 4: Current Mining Area
Current Mining Area 4 23 February 2021 4
Slide 5: Exploration
Exploration ▪ Two geophysics holes were drilled as detailed at the previous meeting to provide data for the drift down to the Lower Barrett Seam. ▪ The holes have been drilled and rehabilitated. ▪ No further exploration activities are proposed for remainder of 2021. 5 23 February 2021 5
Slide 6: Environment Monitoring Data
Environment Monitoring Data ▪ Refer to monitoring data attachment 6 23 February 2021 6
Slide 7: Complaints & Incidents
Complaints & Incidents Complaints No complaints received since last CCC meeting. Incidents Five non-reportable environmental incidents occurred since October 2020 meeting: ▪ At the fuel loading area where the refuelling gun failed to turn off. The spill was contained with absorbent material and clea
Slide 8: Environmental Update
Environmental Update • Monthly attended noise monitoring undertaken – no issues identified • Feral animal culling undertaken on Ashton land in 2020 (231 Kangaroos, 45 pigs, 4 hares, 25 rabbits and 1 wild cat). • Ecological review undertaken of proposed 11kv earth grid and proposed gas drainage boreh
Slide 9: Environmental Update
Environmental Update Heritage ▪ Aboriginal Community Consultative Committee meeting held with Registered Aboriginal Parties representatives (RAPs). No issues raised. ▪ Archaeological monitoring inspections following longwall. ▪ Archaeological salvage works 11kv powerline realignment ▪ Complete remai
Slide 10: Extraction Plan LW 205 - 208
Extraction Plan LW 205 - 208 ▪ Planned to commence LW 205 in May 2021. ▪ Application lodged with DPIE October 2020. ▪ Awaiting approval. 10 23 February 2021 10
Slide 11: Camberwell update
Camberwell update • Coordinated by Yancoal corporate properties team • Local agent is Bailey Real Estate • 32 residential tenancy agreements • 1 commercial agreement • 9 rural properties occupied; 2 ready to be leased • 16 vacant residential lots • 12 properties on Asset Maintenance Program • Rural
Slide 12: Any Questions?
Any Questions? 12 23 February 2021 12